1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based.

Similar presentations


Presentation on theme: "1 Overview. 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based."— Presentation transcript:

1 1 Overview

2 2 Benefits of RATC Applications Real-time corrective Hour ahead corrective and preventive Day ahead corrective Day ahead market/economic based RATC algorithms

3 3 Benefits of RATC Market models (day-ahead, hour-ahead) do not guarantee N-1 feasibility RATC reduces contingency violations RATC reduces costly out of market corrections Market Model Contingency Analysis Out of Market Corrections

4 4 Benefits of RATC with Renewables Renewable resources Renewables impose locational reserve requirements RATC improves reserve deliverability, reduces need for investment in local generation RATC minimizes costly re-dispatch caused by renewables Enables higher percentage levels of renewables

5 5 Expected RATC Benefits Cost savings: >2-5% avoided costs System reliability N-1, N-m, malicious attacks can be mitigated using real-time RATC Reduction in load shedding: >5-10%

6 6 Real-Time Corrective

7 7 Real-time Structure Computational time: < 5 min.

8 8 Real-time Corrective Algorithm

9 9 Real-time Corrective Topology Control Examples PJM (2010) Manual 3: Transmission Operations. http://www.pjm.com/markets-and- operations/compliance/nerc- standards/~/media/documents/manuals/m03.ashx Sunnyside-Torrey 138 kV Operating Guide (AEP Operating Memo T029) – Historically, the Sunnyside-Torrey 138 kV overloads on the outage of the South Canton – Torrey 138 kV line. Opening the S.E. Canton 138 kV CB at Sunnyside will help to reduce the post-contingency flow on the Sunnyside-Torrey 138 kV line. – Page 107

10 10 Superstorm Sandy PJM lost 82 bulk electric facilities – 6 500kV transmission assets ; 3 345kV transmission assets ; 39 230kV transmission assets ; 25 138kV transmission assets Caused extremely high voltage on the system during low load levels We were dealing with extremely high voltage on the system but a switching plan was developed to help alleviate these conditions. Via Andy Ott, VP of PJM: several 500kV lines were switched out to mitigate over voltage concerns during these low load level periods

11 11 Hour Ahead Corrective

12 12 Hour Ahead Corrective Structure Computational time: < 15 min.

13 13 Hour Ahead Corrective Algorithm (Renewables)

14 14 Hour Ahead Corrective Results IEEE 118-bus Test Case Wind uncertainty: ±16% Reserve: 5% non-wind + 10% wind or largest contingency Results to date from IEEE 118: RATC produces multiple candidate switching actions for single events/contingencies Candidate switching actions solve multiple events Market solution (without RATC) failed N-1 contingency analysis with forecasted wind level Market solution with RATC is N-1 reliable and robust against renewable uncertainty

15 15 Hour Ahead Preventive

16 16 Hour Ahead Preventive Structure Computational time: < 15 min.

17 17 Hour Ahead Preventive Algorithm (Renewables)

18 18 Day Ahead Corrective

19 19 Day Ahead Corrective Structure Computational time: 2-3 hrs.

20 20 Day Ahead Corrective Algorithm

21 21 Hour Ahead Corrective Results IEEE 118-bus Test Case Demand uncertainty: ±6% Reserve: 5% hydro + 7% non-hydro or largest contingency Results to date from IEEE 118: RATC produces multiple candidate switching actions for single events/contingencies Candidate switching actions solve multiple events Market solution (without RATC) failed N-1 contingency analysis with forecasted demand Market solution with RATC is N-1 reliable and robust against demand uncertainty

22 22 Day Ahead Market/Economic Based

23 23 Day Ahead Market Based Structure Computational time: 2-3 hrs.

24 24 Day Ahead Market Based Algorithm

25 25 Day Ahead Market Based RATC Results

26 26 RATC Algorithms

27 27 Topology Control Algorithms Greedy algorithm Based on a sensitivity analysis Fast, scalable algorithm for large-scale systems Medium to short-term RATC applications MIP heuristic Finds the best single switching action Long to medium-term RATC applications

28 28 Greedy Algorithm

29 29 MIP Heuristic

30 30 Test Systems IEEE Test Systems PJM Dataset via FERC TVA