New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland.

Similar presentations


Presentation on theme: "New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland."— Presentation transcript:

1 New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland November 3-4, 2005 Stamp Student Union University of Maryland Smart & Sustainable Campuses Conference

2 University of Maryland Profile ò Public Research University ò 35,000 Students ò 160 Georgian Style Buildings ò 13 Million Square Feet ò Comprehensive Underground Utility Infrastructure ò Public Research University ò 35,000 Students ò 160 Georgian Style Buildings ò 13 Million Square Feet ò Comprehensive Underground Utility Infrastructure

3 University of Maryland Profile ò Built in 1934 ò 4 Gas/Oil Fired Boilers, all over 30 years old ò Converted From Coal in Mid 70s ò Normal Winter Load: 240,000 Pounds/Hour at 125 PSI ò Provides Heating for all Campus Buildings ò Built in 1934 ò 4 Gas/Oil Fired Boilers, all over 30 years old ò Converted From Coal in Mid 70s ò Normal Winter Load: 240,000 Pounds/Hour at 125 PSI ò Provides Heating for all Campus Buildings Central Heating Plant

4 University of Maryland Profile ò 57 MVA of Underground Electrical Service ò Distributed Over 30,000 Tons of Cooling Load ò 57 MVA of Underground Electrical Service ò Distributed Over 30,000 Tons of Cooling Load Electric and Cooling Infrastructure

5 Problem Statement: Campus Facilities Master Plan (FMP) calls for adding 3.4M GSF between 1990-2005 FMP precipitates need to study utility infrastructure; $52M in urgent renewal needs identified No support for University System or State of Maryland debt issuance Operating budget must amortize debt, and Off-balance sheet financing required

6 Key Issues: Availability & Cost of capital funding Impact of deal on UM balance sheet Future utility consumption profiles Anticipated impact of utility deregulation Impact of new emissions in non-attainment area Determine options for existing employees Identify technical and legal consultants Prepare performance-oriented RFP; evaluate responses Manage interest of governing board, Governor and State Agencies

7 Results Achieved: ò New technology doubles efficiency of CHP from 35% to nearly 70% ò Energy consumption (BTUs) reduced by 32% ò NO x, So x, PM 10 emissions 50% – 95% below thresholds established by EPA ò $120M in projected savings over 20 year term fund debt service ò Low cost, tax exempt, off-balance sheet financing achieved ò $73M in utility system improvements completed ò New technology doubles efficiency of CHP from 35% to nearly 70% ò Energy consumption (BTUs) reduced by 32% ò NO x, So x, PM 10 emissions 50% – 95% below thresholds established by EPA ò $120M in projected savings over 20 year term fund debt service ò Low cost, tax exempt, off-balance sheet financing achieved ò $73M in utility system improvements completed

8 Energy Savings: Trillions of BTUs Equivalent to Energy Consumed by 7,590 Homes

9 Chilled Water How System Works: Heating Steam Back Pressure Steam Turbine 625 PSI Steam 2 Heat Recovery Steam Generators Exhaust Heat 625 0 F 2 Combustion Turbines and Generators Electric Power 22 MW Fuel Gas or Oil Electric Power 5MW 70% of Condensate Returns to CHP 125 PSI Steam Auxiliary Boilers Make Up Water Steam Driven Chillers on Campus

10 ò Design Construct Agreement ò Management, Operations and Maintenance Agreement ò Ground Lease ò Energy Services Agreement ò Fuel Services Agreement ò Transition Agreement ò Design Construct Agreement ò Management, Operations and Maintenance Agreement ò Ground Lease ò Energy Services Agreement ò Fuel Services Agreement ò Transition Agreement Design Construct MOMA Ground Lease Transition Fuel Supply Energy ServiceUMCP Trigen Trigen Energy Energy MEDCO Contractual Relationships:

11 Financial Structure: