1 Construction & Demolition Recycling Seminar Illinois Recycling Association April 13, 2011 Champaign Illinois

2 Illinois Environmental Protection Agency PAUL PURSEGLOVE – Manager Field Operation Section – Bureau of Land 217/524-5597 paul.purseglove@illinois.gov

3

4 The Mission of the Bureau of Land Ensure that hazardous and non-hazardous wastes are managed in an environmentally sound manner; Encourage the recycling and recovery of waste materials through suitable incentive/disincentive efforts; Provide remedial responses and/or provide oversight to the uncontrolled releases of hazardous and petroleum substances into the environment.

5 SAFE WASTE MANAGEMENT

6 Illinois EPA’s Objective COMPLIANCE

7

8 Waste … discarded material Sec 3.53 (1986) Municipal Waste …. “means garbage, general household and commercial waste, landscape waste….and CONSTRUCTION OR DEMOLITION DEBRIS Section 3.290 (1986)

9 MANAGEMENT OF GENERAL C&D DEBRIS

10 ILLINOIS ENVIRONMENTAL PROTECTION ACT Prohibitions of the “Act” – NO open dumping of C&D waste – NO open burning of C&D waste

11

12 MANAGEMENT OF GENERAL C&D DEBRIS Landfill Transfer Station C&D Transfer, Storage or Treatment Facility (operated pursuant to 22.38 of the Act) Recycling Center (not regulated by IEPA)

13

14

15 C&D Recycling 415 ILCS 5/22.38 Facilities accepting exclusively C&D for Transportation, Storage or Treatment 22.38 sites must comply with local Zoning In the absence of zoning – 1300 ft. from a residence

16 Operating Requirements Within 48 hours sort/separate material that can be recycled from the waste that must be disposed Within 72 hours transport off site all non- recyclable wastes Limit non-recyclables to 25% -- wood recovered for the secondary fuel market counts toward the 75%

17 Operating Requirements Non-putrescibles can accumulate for 6 months Putrescibles items must move off site in 45 days Keep Records to demonstrate compliance and identify the generator and transporter CONTROL – odors, noise, vectors, dust, litter, access Take precautions against fire

18

19 Operating Requirements Storm water runoff must be controlled Leachate properly managed ASBESTOS – comply with all applicable laws NOTIFY – the Illinois EPA If operations commence after 8-24-2009 you must obtain and Illinois EPA issued permit prior to commencing operations [ILCS 5/21(d)]

20 Local Siting Requirements ILCS 5/3.330 Pollution Control Facility Definition -- Any waste storage site, waste transfer station, waste treatment facility ILCS 5/39.2 The county Board or governing body shall approve or disapprove requests for local siting for each pollution control facility

21 ILCS 5/22.15 Solid Waste Management Fund $2.00/ton collected at the landfill A unit of local government can collect $1.27/ton However ILCS 5/22.15(k) exempts the SWMF fees from recyclers (22.38 sites) provided 50% of the waste received is reusable Processors must have written approval from the Illinois EPA

22 ILCS 5/22.44 Subtitle D Management Fund $0.22/ton collected at the landfill However ILCS 5/22.44(c) exempts the SDMF fees from recyclers (22.38 sites) provided 50% of the waste received is reusable Processors must have written approval from the Illinois EPA

23

24

25

26 Management of CCDD Section 3.160 of the Act (2005 & 2007 amendments) Uncontaminated concrete with protruding rebar and reclaimed asphalt pavement is NOT “waste” if separated or processed and returned to the economic mainstream within 4 years 25% removed each year

27

28

29

30

31

32 QUESTIONS