1 CMAA Sustainability Workshop Friday, January 23, 2009 Washington, DC The New U.S. Census Bureau Headquarters Suitland, Maryland JAG BHARGAVA, PE, PMP,

Similar presentations


Presentation on theme: "1 CMAA Sustainability Workshop Friday, January 23, 2009 Washington, DC The New U.S. Census Bureau Headquarters Suitland, Maryland JAG BHARGAVA, PE, PMP,"— Presentation transcript:

1 1 CMAA Sustainability Workshop Friday, January 23, 2009 Washington, DC The New U.S. Census Bureau Headquarters Suitland, Maryland JAG BHARGAVA, PE, PMP, CCM, DBIA Acting Deputy Director & Project Executive, GSA ROD GARRETT, AIA Associate Director, SOM IRIS AMDUR, LEED AP Principal, Greenshape

2 2 New U.S. Census Bureau Headquarters

3 3 INTRODUCTION  1.5 million square foot office space & 1.0 million structured parking, $400. million.  Bridging Design-Build Delivery Method The Team - Bridging A/E- SOM - DBC- Skanska (GC) &HKS ( Architect of the Record) - CM- DMJM / Heery ( Jt. Venture) - LEED consultant - Greenshape  Construction & Occupancy Completed, 2007.

4 4 OWNER’S PERSPECTIVE  GSA wanted to achieve GSA's new Standard of LEED silver or higher.  Bridging Design-Build delivery method was new untested to achieve LEED.  SOM's Concept, which achieved 34 LEED points.  GSA Concerns : - HKS's CD when completed may not get 34 LEED points - DBC's design proposal may conflict with PBS P-100  Benefits in having CM, and Bringing the CM on very early : - To oversee LEED process and to track LEED points - To perform and oversee additional commissioning ( Which achieved 1 LEED Point) until all equipment turnover  GSA saw Benefit in having DBC hire an Independent LEED consultant, Greenshape.

5 5 GREEN IS GOOD...there is no other building complex like this in the world  Designed to be the architectural expression of sustainability.  Set in an 80-acre woodland preserve.  Two buildings have been conceptually "Cleaved" from a single mass.  Central garden, courtyards, and other sustainable landscape gardens.  Woodland-facing facades are clad in a unique, architectural sunshade.  Parking structures green screens with climbing ivy.  Scenic views brought into the workplace.  "Mainstreet" with all kinds of amenities.

6 6 SUSTAINABILITY

7 A.User Comfort Daylight + Indoor Air Quality Underfloor Air B.Water Conservation Site Stormwater management Natural filtering – Green Roofs Potable water usage Low flow fixtures - waterless fixtures C. Energy Conservation Heat Load Reduction Exterior sun screen “wood veil” Sustainability / Design Goals 7 A. GSA

8 8 A. User Comfort User Comfort GOAL Daylight + Indoor Air Quality SOLUTION Underfloor Air APPLIED TECHNOLOGY

9 9 A. User Comfort

10 10 A. User Comfort

11 11 A. User Comfort - Underfloor Air Distribution

12 12 A. User Comfort - Underfloor Air Distribution

13 13 B. Water Conservation Site Stormwater Management Natural Filtering – Green Roofs Water Conservation Potable Water Usage Low flow fixtures – water less fixtures GOAL SOLUTION APPLIED TECHNOLOGY

14 14 B. Water Conservation- Green Roofs

15 15 B. Water Conservation- Green Roofs

16 16 B. Water Conservation- Green Roofs

17 17 Heat Load or Cooling Requirements Reduction Exterior sun screen “wood veil” Energy Conservation C. Energy Conservation GOAL SOLUTION APPLIED TECHNOLOGY

18 18 C. Energy Conservation- Sun Screen

19 19 C. Energy Conservation- Sun Screen

20 20 C. Energy Conservation- Sun Screen

21 21 C. Energy Conservation- Sun Screen

22 22 C. Energy Conservation- Sun Screen

23 23 C. Energy Conservation- Sun Screen

24 Census Bureau Headquarters LEED Certification Construction Management Association of America Sustainability Workshop 23 January 2009 Iris Amdur, LEED AP, Principal GreenShape LLC

25 GreenShape Role ● Engaged by Skansa to help guide the implementation of project sustainability goals ● Provided technical guidance on LEED credits ● Reviewed LEED documentation ● Manage the LEED online submittal process to USGBC

26 Categories Sustainable Sites Water Efficiency Energy and Atmosphere Materials and Resources Indoor Environmental Quality Innovation in Design Credits 8 3 6 7 8 2 34 Points 14 5 17 13 15 5 69 Prereq. 1 0 3 1 2 0 7 LEED for New Construction V 2.1 All Prerequisites must be met in all categories to participate in LEED. Minimum number of points required for LEED rating: Certified 26-32, Silver 33-38, Gold 39-51, Platinum 52-69 TOTAL

27 Categories Sustainable Sites Water Efficiency Energy and Atmosphere Materials and Resources Indoor Environmental Quality Innovation in Design Points 9 4 11 5 37 Census Bureau LEED Credit Summary Project anticipates a LEED Silver rating, if all points are awarded. TOTAL

28 Census Bureau: Sustainable Sites ● SS pr1: Erosion & Sedimentation Control ● SS4.1 - Alternative Transportation, Public Transportation (1pt) ● SS4.2 - Alternative Transportation, Bicycle Storage & Changing Rooms (1pt) ● SS4.3 - Alternative Transportation, Alternative Fuel Vehicles (1pt) ● SS4.4 - Alternative Transportation, Parking Capacity (1pt) ● SS5.2 - Reduced Site Disturbance, Development Footprint (1pt) ● SS6.1 - Stormwater Management, Rate and Quantity (1pt) ● SS6.2 - Stormwater Management, Treatment (1pt) ● SS7.1 - Heat Island Reduction, Non-Roof (1pt) ● SS7.2 - Heat Island Reduction, Roof (1pt)

29 Census Bureau: Water Efficiency ● WE1.1 - Water Efficient Landscaping, Reduce by 50% (1pt) ● WE1.2 - Water Efficient Landscaping, No Potable Use or No Irrigation (1pt) ● WE3.1 - Water Use Reduction, 20% Reduction (1pt) ● WE3.2 - Water Use Reduction, 30% Reduction (1pt)

30 Census Bureau: Energy & Atmosphere ● EApr1: Fundamental Building Systems Commissioning ● EApr2: Minimum Energy Performance ● EApr3: CFC Reduction in HVAC&R Equipment ● EA1 - Optimize Energy Performance (1pt) ● EA3 - Additional Commissioning (1pt) ● EA4 - Ozone Depletion (1pt) ● EA6 - Green Power (1pt)

31 Census Bureau: Materials & Resources ● MRpr1: Storage & Collection of Recyclables ● MR2 - Construction Waste Management, Divert 50-75% (1pt) ● MR4 - Recycled Content, 5-10% (p.c. + 1/2 p.i.) (2pts) ● MR5.2 - Local/Regional Materials, 10% harvested regionally (1pt)

32 Census Bureau Indoor Environmental Quality Credits ● EQpr1: Minimum IAQ Performance ● EQpr2: Environmental Tobacco Smoke (ETS) Control ● EQ1 - Carbon Dioxide (CO 2 ) Monitoring (1pt) ● EQ2 - Increase Ventilation Effectiveness (1pt) ● EQ3.1 - Construction IAQ Management Plan, During Construction (1pt) ● EQ3.2 - Construction IAQ Management Plan, Pre-Occupancy (1pt) ● EQ4.1 - Low-Emitting Materials, Adhesives & Sealants (1pt) ● EQ4.2 - Low-Emitting Materials, Paints (1pt) ● EQ4.3 - Low-Emitting Materials, Carpet (1pt) ● EQ5 - Indoor Chemical & Pollutant Source Control (1pt) ● EQ6.2 - Controllability of Systems, Non-perimeter Spaces (1pt) ● EQ7.1 - Thermal Comfort, Comply with ASHRAE 55-2004 (1pt) ● EQ7.2 - Thermal Comfort, Permanent Monitoring System (1pt)

33 Census Bureau Innovation Credits ● ID1.1 Innovation in Design: Low-emitting Furniture (1pt) ● ID1.2 Innovation in Design: Exemplary Performance EA 6 (1pt) ● ID1.3 Innovation in Design: Education & Outreach (1pt) ● ID1.4 Innovation in Design: Green Housekeeping (1pt) ● ID2 LEED™ Accredited Professional (1pt)

34 LEED and the Construction Manager ● Involve CM in developing project LEED/Design strategy ● Bundle green building systems during cost estimating ● Establish LEED Action Plans during design and refine as job is bid/bought ● Communicate LEED requirements to subcontractors prior to bid and during construction ● Track and Document LEED as you go ● Issue frequent LEED progress reports ● Put LEED on the Construction Meeting Agenda monthly

35 Questions 35