Presentation to www.essgroup.com June 25, 2008 Northeast States-EPA Workshop Siting Renewable Energy Projects at Closed Solid Waste Landfills and Contaminated Sites Engineers Scientists Consultants HULL WIND II A FRESH BREEZE OFF THE LANDFILL
2
HULL WIND II BACKGROUND: History of Success – Hull Wind I Municipal Lighting Plant – Local Knowledge and Expertise Town Land For Reuse Community Support
3
HULL WIND II Hull Sanitary Landfill Siting Considerations: Available open space Proximity to system interconnection Prevailing wind conditions Regulatory Siting Considerations: Constructing large structures on closed landfills Maintaining liner integrity Maintaining cap integrity Ongoing maintenance and monitoring
4
HULL WIND II Landfill Conditions – Three Sections: Phase 1A – closed, unlined landfill cell, capped with low permeability (clay) cap Phase 1B – closed, unlined landfill cell, capped with flexible membrane liner (FML) cap Location for WTG Installation Phase 2 – lined landfill cell, active, operating area of the landfill Locations for supporting structures; poles, ductbank
5
HULL WIND II Project Specifications (Phase IB)- Disruption of 5,000 s.f. of existing landfill cap for WTG: Removal of existing membrane and covering soils Placement of a pile foundation Placement of a 20’ square concrete pad over the piles to support WTG Replacement of existing FML within disturbed area with 40 mil HDPE membrane welded to existing membrane to restore cap integrity Cover with 12” of drainage sand and 6” of vegetative support soil (loam)
6
HULL WIND II Project specifications (Phase 2): Utility poles (2) placement supporting overhead transmission lines for interconnection Waste depth at pole locations in excess of 20’ Poles set at 6.5 ft. BGS to maintain liner Placement of underground duct bank from WTG to switch gear to new overhead power line Bottom of duct bank approx. 30” BGS to maintain liner
7
HULL WIND II Costs and Benefits: $ 3,000,000 construction cost $ 31,000 annual maintenance and insurance cost Value of electricity approx. $0.10/kWh which would otherwise be purchased to respond to Hull demand
8
HULL WIND II Since June 22, 2006 (date of commission): 7,767,600 kWhs generated (23.3% capacity) $ 776,760 avoided energy costs $1,800,000 received for RECs No emissions No fuel spills No unscheduled outages
9
HULL WIND II - BEFORE
10
HULL WIND II - AFTER
11
HULL WIND II All Images Courtesy of Citizens for Alternative Renewable Energy www.hullwind.org