District Energy Initiatives 1/23/2012 www.swanseaschools.org
2
National Grid – New England Gas Whole Building Assessment (WBA) 1.)Assess energy performance Building envelope Electrical systems HVAC systems Lighting systems & equipment Operation & Maintenance procedures 2.) Identify opportunities for improvement Low & No Cost Opportunities (1-3 years) Capital replacement recommendations (5-10 years) 3.) Action Plans recommended Incentive programs
5
Low Cost – 2.2 years or less payback period Education & awareness * Computer power management * Vending machine controls Air sealing/weatherization (doors & windows) Freezers – National Resource Management (compressors, fans, evaporation controls, temperature controls, defrost controls, walk-in-curtains) * Demand controller HVAC – Gymnasium * Compressed air system (pneumatic) assessment Destratification fans – Gymnasium & Auditorium Operation & Maintenance practices * * In-process or already completed
6
Low Cost – 1.4 years or less payback period Education & awareness * Computer power management * Vending machine controls Freezers – National Resource Management (compressors, fans, evaporation controls, temperature controls, defrost controls, walk-in-curtains) * Air sealing (classroom exhaust) Programmable thermostats Timer on exhaust fans Insulate hot water pipes (Boiler Room) Operation & Maintenance practices * * In-process or already completed
7
Joseph Case High School Replacement of existing electric motors to more efficient motors Variable speed drives (electric motors) Demand controlled HVAC systems – Gymnasium & Auditorium * Compressed air pneumatic system (temperature control) by electronic system Joseph Case Junior High School Boiler replacement Replace hot water pump motors Replace/refurbish kitchen make-up air unit (MAU) Electronic thermostat upgrade * In-process or already completed
8
Luther School – Boiler Gardner School – Boiler (New Section); *Current Situation Hoyle School – Pneumatic system, air conditioning units Administration Building – Light replacement/LED’s (80% efficiency/50,000 hrs) Joseph Case Junior High School Boiler control panel system Circulator pumps Window replacements * Joseph Case High School Boiler control system* Gymnasium HVAC System* Boiler Damper System* * In-process or already completed
11
Commercial Installation of Double Pane, Low E Glass, Project out, Aluminum Frame 84 Remaining windows as of 1-18-12 PhaseSchool YearWindow Replacement I2007-200841 II2008-200933 III2009-201025 IV2010-201195 Total to Date194
12
SchoolTotal CostNational Grid Incentive Cost to SwanseaAnnual Savings Brown Elementary $40,375.00$19,818.00$20,557.00$ 8,125.00 Gardner Elementary $36,318.00$16,990.00$19,328.00$10,376.00 Hoyle Elementary $65,527.00$39,036.00$26,491.00$13,288.00 Luther Elementary $45,935.00$21,132.00$24,803.00$10,903.00 Joseph Case Junior High School $111,851.00$59,748.00$52,103.00$29,486.00 Joseph Case High School $315,748.00$64,650.00$177,272.00$45,152.00 Totals$615,754.00$221,374.00$320,554.00$117,330.00 Reduction of Carbon footprint = 473 metric tons/year
13
Average payback period 2 years or less, except High School 3.9 years Motion Sensors Phillips advantage T8 (30,000 hrs.) free lamps 3 years Electronic ballasts (warranty 5 years/installed) LED’s High School Auditorium (50,000 hrs./80% + efficiency) w/exception of large stage lights
14
Review of Energy Efficiency Measures (WBA) Joseph Case Junior High School & Joseph Case High School Assess other buildings in district for EEM’s Identify District’s priorities, goals & resources Determine schedule for implementation of EEM’s Implement no/low cost measures that do not require further study using: National Grid Direct Install Program Internal facilities personnel Private vendors/procurement Determine objectives and level of interest to proceed with more detailed research and engineering Some recommendations may require further investigation as noted in report Contact National Grid & New England Gas to begin detail study for specific measures Implement selected measures after their scope of work, costs and energy savings have been evaluated and determined.
15
Technology in the District
16
Each school has one or more physical computer labs The Lab setting is used for class learning or individual project/research creation Interactive whiteboards both mobile and mounted Digital cameras are available for project based use Wireless access points are part of the mobile labs and/or iPad carts. iPad carts with a minimum of 30 iPads are available at each school in the district Macbook carts are available at both secondary schools. iPod carts are available at each of the elementary schools Document cameras are available throughout the District Interactive Projectors are used in classrooms with whiteboards