1 ANGUS BIOFUELS & SCOTTISH WOODFUEL SUPPLIES LTD UNIT 1 – ECO PARK UNIT 1 – ECO PARK CARSEVIEW ROAD CARSEVIEW ROAD FORFAR DD8 3BS FORFAR DD8 3BS OTHER BUSINESS ACTIVITIES OTHER BUSINESS ACTIVITIES CIVIL ENGINEER CIVIL ENGINEER FOREST OWNER AND HARVESTING BUSINESS FOREST OWNER AND HARVESTING BUSINESS PROPERTY DEVELOPER PROPERTY DEVELOPER BILL WATSON BILL WATSON TEL: 01307 466699 TEL: 01307 466699 FAX: 01307 462278 FAX: 01307 462278 E-MAIL:- bill@ballindarg.co.uk E-MAIL:- bill@ballindarg.co.ukbill@ballindarg.co.uk

2 ANGUS BIOFUELS WOODCHIP PRODUCER WOODCHIP PRODUCER BOILER INSTALLATION BOILER INSTALLATION HEAT SUPPLY CONTRACTS – ESCO HEAT SUPPLY CONTRACTS – ESCO FLUE GAS FILTRATION SPECIALISTS FLUE GAS FILTRATION SPECIALISTS

3 BIOMASS PLANT SITUATED AT DRAGONHALL FARM, PADANARAM, BY FORFAR SITUATED AT DRAGONHALL FARM, PADANARAM, BY FORFAR OPENED BY JOHN SWINNEY IN JAN 2008 OPENED BY JOHN SWINNEY IN JAN 2008 PROJECT COSTS: £3.0 MILLION PROJECT COSTS: £3.0 MILLION

4 MAIN CONSIDERATIONS OF SETTING UP PLANT LOCATION TO TIMBER SUPPLY LOCATION TO TIMBER SUPPLY LOCATION TO BOILERS LOCATION TO BOILERS CAPITAL COST CAPITAL COST GRANT ASSISTED BY SSBS AND SRDP GRANT ASSISTED BY SSBS AND SRDP QUALITY OF CHIP QUALITY OF CHIP MOISTURE CONTENT OF CHIP MOISTURE CONTENT OF CHIP SIZE OF CHIP SIZE OF CHIP HANDLING OF WOOD FROM FOREST TO BOILER HANDLING OF WOOD FROM FOREST TO BOILER

5 WOODCHIP OUTPUT MAXIMUM OUTPUT = 100 TONNES OF DRY CHIP PER DAY I.E. 400,000 kWhrs OF HEAT/DAY TYPICAL HOUSE WILL USE APPROX 100 kWhrs/DAY (WINTER) TYPICAL PRIMARY SCHOOL WILL USE APPROX 5000 kWhrs/DAY (WINTER)

6 STORAGE OF WOOD & CHIPS AIR DRYING = 5000 TONNES AIR DRYING = 5000 TONNES AT ROADSIDE = 10,000 TONNES AT ROADSIDE = 10,000 TONNES DRY CHIP = 2000 TONNES DRY CHIP = 2000 TONNES

7

8

9 WOOD CHIP DELIVERY SYSTEMS Bulk Truck 150m3 per delivery Bulk Truck 150m3 per delivery Tipping Trailer 40- 120m3 Tipping Trailer 40- 120m3 Big Hook System 40-60m3 Big Hook System 40-60m3 Blower Trailer 20- 40m3 Blower Trailer 20- 40m3 Hi Lift Trailer 16m3 Hi Lift Trailer 16m3 Bulk Bags 2m3 per bag Bulk Bags 2m3 per bag

10

11

12

13

14 AIR QUALITY PART 1V OF THE ENVIRONMENT ACT 1995 – LOCAL AIR QUALITY MANAGEMENT. PART 1V OF THE ENVIRONMENT ACT 1995 – LOCAL AIR QUALITY MANAGEMENT. PARTICULATE MATTER SHOULD NOT EXCEED AN ANNUAL MEAN OF 18ug/m3 BY 31 DECEMBER 2010. PARTICULATE MATTER SHOULD NOT EXCEED AN ANNUAL MEAN OF 18ug/m3 BY 31 DECEMBER 2010. ENVIRONMENTAL HEALTH ARE RECOMMENDING ABATEMENT TECHNOLOGY. RHI REQUIREMENT ENVIRONMENTAL HEALTH ARE RECOMMENDING ABATEMENT TECHNOLOGY. RHI REQUIREMENT

15

16 Biomass Boiler Particulate Emissions Data with and without Filter Pre Filter mg/m 3 at 11%O 2, dry, STP Post Filter mg/m 3 at 11%O 2, dry, STP %Reduction Total PM 60198.3 PM 10 38197.4 PM 2.5 330.598.5

17

18

19

20 ESCO SUPPLY AND INSTALL BOILER (INCLUDING PLANNING & BUILDING WARRANT) Design and Build SUPPLY AND INSTALL BOILER (INCLUDING PLANNING & BUILDING WARRANT) Design and Build MAINTAIN BOILER MAINTAIN BOILER CLEAN & DE-ASH BOILER CLEAN & DE-ASH BOILER OFF-SITE MONITORING using BMS OFF-SITE MONITORING using BMS ALL CIVIL, MECHANICAL AND ELECTRICAL WORK ALL CIVIL, MECHANICAL AND ELECTRICAL WORK CHARGE RATE PER kWhr THROUGH METER MONITORED ON FLOW AND RETURN PIPES CHARGE RATE PER kWhr THROUGH METER MONITORED ON FLOW AND RETURN PIPES ADVANTAGES FOR CLIENT HAS LIMITED RISK HAS LIMITED RISK DOES NOT NEED TO MONITOR FUEL QUALITY DOES NOT NEED TO MONITOR FUEL QUALITY NOT RESPONSIBLE FOR FUEL EMISSION QUALITY NOT RESPONSIBLE FOR FUEL EMISSION QUALITY DOES NOT REQUIRE EXTRA PERSONNEL TO RUN BOILER DOES NOT REQUIRE EXTRA PERSONNEL TO RUN BOILER

21 RHI Renewable Heat Incentive Consultation Deadline 26 April 2010 Consultation Deadline 26 April 2010 Government Implementation April 2011 Government Implementation April 2011 Payments from 15 July 2009 Payments from 15 July 2009 Proposed up to 45kw 9.0p/kw hr Proposed up to 45kw 9.0p/kw hr Proposed 45kw to 500kw 6.5p/kw hr Proposed 45kw to 500kw 6.5p/kw hr Payments by OFGEM 15 years Payments by OFGEM 15 years

22 THANK YOU. Bill Watson. Bill Watson. E mail : bill@ballindarg.co.uk E mail : bill@ballindarg.co.ukbill@ballindarg.co.uk Mobile : 07976 820664 Mobile : 07976 820664 Office :01307 466699 Office :01307 466699


Download ppt "ANGUS BIOFUELS & SCOTTISH WOODFUEL SUPPLIES LTD UNIT 1 – ECO PARK UNIT 1 – ECO PARK CARSEVIEW ROAD CARSEVIEW ROAD FORFAR DD8 3BS FORFAR DD8 3BS OTHER BUSINESS."

Similar presentations


Ads by Google