Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries

Similar presentations


Presentation on theme: "Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries"— Presentation transcript:

1 Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
Engineering Technology Division Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries

2 Overview Introduction Burners Igniters Fans Air Heaters
Section 2.4– Boiler Auxiliaries Overview Introduction Burners Igniters Fans Air Heaters Fuel Prep and Handling Pulverized Coal Stokers

3 Auxiliaries allow more heat to be produced.
Section 2.4– Boiler Auxiliaries Introduction Auxiliaries allow more heat to be produced. Minimizing heat loss is key to maximizing output. Efficiency is the key to generation. Combustion needs oxygen so airflow is key to heat production. Fuel type and size is key to combustion rate. Sizing of Auxiliaries is critical.

4 Power Output MW Turbine Steam Flow Temperature and Pressure
Section 2.4– Boiler Auxiliaries Introduction Power Output MW Turbine Steam Flow Temperature and Pressure Boiler Capacity Auxiliaries Under Capacity Over Capacity < Desired MW Maximum Operation Wasted Costs Wasted Energy

5 Burners Fuel Natural Gas Oil Coal Dust Quantity Boiler Size
Section 2.4– Boiler Auxiliaries Burners Fuel Natural Gas Oil Coal Dust Quantity Boiler Size

6 Section 2.4– Boiler Auxiliaries
Igniters - Gas

7 Section 2.4– Boiler Auxiliaries
Igniters - Oil

8 Igniters - Combination
Section 2.4– Boiler Auxiliaries Igniters - Combination

9 Section 2.4– Boiler Auxiliaries
Fans –Boiler Supply

10 Section 2.4– Boiler Auxiliaries
Fans –Boiler Exhaust

11 Air Heaters Air Temperature Air Density Boiler Heat Boiler Efficiency
Section 2.4– Boiler Auxiliaries Air Heaters Air Temperature Air Density Boiler Heat Boiler Efficiency

12 Fuel Prep and Handling - Coal
Section 2.4– Boiler Auxiliaries Fuel Prep and Handling - Coal

13 Section 2.4– Boiler Auxiliaries
Crushed Coal

14 Section 2.4– Boiler Auxiliaries
Pulverized Coal 50 um ”

15 Section 2.4– Boiler Auxiliaries
Stoker

16 Section 2.4– Boiler Auxiliaries
Questions?


Download ppt "Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries"