TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

Similar presentations


Presentation on theme: "TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]"— Presentation transcript:

1 TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]

2 PROJECT SCHEDULE SUMMARY

3 BUILDING SYSTEMS SUMMARY  Precast Concrete  Above grade columns  Mechanical System  Variable Air Volume  Cooling Towers  Fan Coil Units  Fire Suppression  Pressurized Stairways  Sprinklers  Fire Dampers  Two hour rating  Demolition Required  Plumber’s Building  Slurry Wall  East street and utilities  Structural Steel Frame  Encased steel columns below grade  Steel composite deck  Cast-In-Place Concrete  Slurry Wall  Underground Slabs  Column Encasement [Cooper Carry, Inc.]

4 BUILDING SYSTEMS SUMMARY (CONT.)  Electrical System  PEPCO  460/265 Volt Switchboards  208/120 Volt Panelboards  3 Primary Electrical Rooms per floor  Masonry  New Structure  Load Bearing  Single-wythe veneer  LEED – Recycled content  Renovation  Load Bearing  Masonry Restoration and Cleaning  Curtain Wall  2,400 Wall Units  29,000 Punched Window Units  Steel Sunshades  Roof System  Glass Skylight  Roof Terrace  Excavation  Top-Down Excavation  Slab-On-Grade Pours [Cooper Carry, Inc.]

5 PROJECT COST EVALUATION Square Foot Analysis  $172,000,000 – $229 / SF  Elevator  Laundry Equipment  Emergency Lighting / Smoke Detectors  Reasons  Top-Down Construction  Slurry Wall / Concourse Excavation  Extensive below-grade excavation  Substantially more suites Actual Costs  Prime: $500,000,000 – $665 / SF  Building Systems Cost  Superstructure: $66 million  Exterior Enclosure: $48.5 million  Plumbing: $95.5 million  HVAC: $51.5 million  Fire Protection: $24.5 million  Electrical: $46.5 million

6 EXISTING CONDITIONS SITE PLANS Proposed Building Existing Building Construction Fence Traffic Flow Fire Hydrant Electrical Water Stormwater Sanitary Gas Telecom Nathan Braskey Existing Conditions Site Utility Plan C - 300 Height – 150 ft Height – 60 ft H: 110 ft

7 CLIENT INFORMATION  Owner: Hotel Developer  Hotel Manager: Hotel Franchise  New Facility – Expansion of Franchise  Design – Build / Guaranteed Maximum Price  Budget, Quality, Schedule  Importance of opening on-time

8 PROJECT TEAM

9 QUESTIONS?  Schedule Schedule  Systems Summary Systems Summary  Cost Evaluation Cost Evaluation  Existing Conditions Fly Around Existing Conditions Fly Around  Existing Conditions Site Plan Existing Conditions Site Plan  Client Information Client Information  Project Team Project Team

10 EXISTING CONDITIONS SITE PLANS Proposed Building Existing Building Construction Fence Traffic Flow Fire Hydrant Electrical Water Stormwater Sanitary Gas Telecom Height – 150 ft Height – 60 ft H: 110 ft Nathan Braskey Existing Conditions Site Utility Plan C - 300