Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project 3 DS 413: Design Studio 413 May 9, 2010.

Similar presentations


Presentation on theme: "Project 3 DS 413: Design Studio 413 May 9, 2010."— Presentation transcript:

1 Project 3 DS 413: Design Studio 413 May 9, 2010

2

3

4

5

6

7  1A Save Tree on Lot  1B Paver/ Stone Driveway and Pathway  1C Alternative Transportation  1D Green roof  1E Rain Garden

8  2A Planting Species Native to the Area  2B Low Flow Toilets/ Duel Flush Toilets  2C Use Grey Water for Landscape Irrigation  2D Harvesting Rainwater  2E Low Flow Fixtures

9  3A Properly Designed Window Layout  3B Environmentally Friendly HVAC System  3C Shades to Block Out Sunlight  3D Utilize Rain Water  3E Orientation of Building

10  4A Bamboo Flooring  4B Concrete Walls  4C Reclaimed Wood  4D Recycle Bins  4E Reduce Amount of Construction Waste

11  5A Carbon Dioxide Monitors  5B Ventilate Space Naturally  5C Low Emitting VOC Paint  5D Self Closing Doors  5E Large Windows for Natural Light

12  6A Good Insulation in Walls and Ceilings  6B Solar Eclectic Computers  6C Low Flow Shower  6D High Efficiency Fixtures  6E Concrete Counter Top


Download ppt "Project 3 DS 413: Design Studio 413 May 9, 2010."

Similar presentations


Ads by Google