Download presentation
Presentation is loading. Please wait.
Published byLandon Gordon Modified over 10 years ago
1
World Meteorological Organization Working together in weather, climate and water Review of relevant documents to the WMO capacity development activities www.wmo.int WMO
2
Strategic Plan (2012-2015) Strategic Thrust 3 Expected Result 6
3
Strategic Plan (2012-2015) Strategic Thrust 3 encompasses: The need to improve infrastructure and systems operated by NMHSs The need to improve human resources
4
Strategic Plan (2012-2015) The main objectives of Strategic Thrust are to a)Focus attention on the education and training needs of NMHSs b)Increase awareness of the socio-economic benefits of NMHSs c)Assist NMHS managers in effective communication with stakeholders d)Assess and address NMHS training needs e)Expand the number of strategic partnerships f)Enhance resource mobilization
5
Technical Commissions
6
Technical Commission (CBS) CBS CIMO CHy CAS CAeM CAgM CCl JCOMM Areas for capacity building: GOS. WIS and WIGOS Data processing and Forecasting Systems SWFDP Ensemble Prediction Systems and Applications PWS Methods to consider include: E-learning as an efficient and cost-effective tool in training NMHS staff. Abridged report,2009Commission for Basic Systems
7
Technical Commission (CIMO) CBS CIMO CHy CAS CAeM CAgM CCl JCOMM The Commission: encouraged regional associations to inform CIMO on the needs for capacity-building activities to support their Regional Instrument Centres. Abridged report,2010 Commission for Instruments and Methods of Observation
8
Technical Commission (CHy) CBS CIMO CHy CAS CAeM CAgM CCl JCOMM WMO Strategy on Education and Training in Hydrology and Water Resources (2009- 2012) is in place Objectives of the Strategy are to: a)Assist Members in assessing their own education and training needs in HWR; b)Provide adequate education and training to personnel of the NHSs; c)Assist Members in developing/updating national curricula in HWR; d)Optimize the use of available resources and mobilize extrabudgetary resources. Abridged report,2008Commission for Hydrology
9
Technical Commission (CAS) CBS CIMO CHy CAS CAeM CAgM CCl JCOMM Abridged report,2009 The goals of the GAW capacity-building efforts are to: a)Conduct GAW training and education activities in developing countries for start-up training and beyond including workshops b)Promote twinning relationships between countries with less experienced station personnel and established atmospheric scientists Commission for Atmospheric Sciences
10
Technical Commission (CAeM) CBS CIMO CHy CAS CAeM CAgM CCl JCOMM Abridged report,2010 A Coordinated and WMO-wide effort required to successfully implement the Standards for the qualification and competencies of personnel in AeM. Essential CB components for implementation would be a)A combination of approached (train the trainers, blended learning etc) b)Resource mobilization c)Intensive cooperation with training institutions d)Intelligent use of modern communication methods Commission for Aeronautical Meteorology
11
Technical Commission (CAgM) CBS CIMO CHy CAS CAeM CAgM CCl JCOMM Training and education in AgM are of great importance to Members, particularly LDCS and developing countries. The need for new guidelines for curricula in AgM. Abridged report,2010Commission for Agricultural Meteorology
12
Technical Commission (CCl) CBS CIMO CHy CAS CAeM CAgM CCl JCOMM A comprehensive CB strategy and implementation plan needed. CCl CB strategy should have the following core components: a)Institutional mandate in climatology b)Establishing and strengthening climate infrastructure c)Human resource development d)Qualification and certification of climatologists Approach a)Resource mobilization b)Development of an action plan Abridged report,2010Commission for Climatology
13
Technical Commission (JCOMM) CBS CIMO CHy CAS CAeM CAgM CCl JCOMM Joint Technical Commission for Oceanography and Marine Meteorology Areas for Capacity Building: a)Marine Safety b)Coastal Hazard Forecasting c)Ocean Forecasting Approach a)Training workshop b)Summer School c)Publication of training materials d)Development of an action plan
14
Technical Commissions (Summary) CBS CIMO CHy CAS CAeM CAgM CCl JCOMM Overall approach Some Commissions are taking strategic approach. Others rather ad-hoc Components Identification of Gaps in Capacity Infrastructure and Human capacity Method Education and Training, including Guidelines Resource Mobilization
15
Regional Associations
16
Regional Association I RA I RA II RA III RA IV RA V RA VI Overall Capacity building for policy makers Development on human and institutional resources in NMHSs. Areas for Capacity Building Observation, analysis and application of weather, water and climate information to development Regional approach would be beneficial. RA I Strategic Plan 2012-2015
17
Regional Association II RA I RA II RA III RA IV RA V RA VI Regional Outcomes corresponding to WMO Expected Results 6. The formulation of capacity assessment and development plan Maintenance of highly-qualified staff Maintenance/implementation of a structured training plan Access and use of e-learning materials Professional certification of Staff Continuous education programmes etc RA II Strategic and Operating Plan 2011-2015
18
Regional Association III RA I RA II RA III RA IV RA V RA VI Overall approach Maximize the use of exciting cacabilities in the region Strengthen the capacities of all members Regional approach Cooperation with other regions. RA III Strategic Plan 2011-2014
19
Regional Association IV RA I RA II RA III RA IV RA V RA VI RA IV strategic plan aims to a)develop resources and expertise to produce weather services and products b)develop climate services c)strengthen services related to: disaster mitigation and prevention; environmental monitoring; hydrology and water-related assessment and management d)Upgrade and modernize their services including infrastructure, technology and human resources RA IV Strategic Plan 2011-2014
20
Regional Association V RA I RA II RA III RA IV RA V RA VI Regional Outcomes corresponding to WMO Expected Results 6. Regional and national meteorological and hydrological services are more effective Education and Training Development activities at national and regional levels are improved Donor funding is coordinated and effective RA V Strategic and Operating Plan 2012-2015
21
Regional Association VI RA I RA II RA III RA IV RA V RA VI There is a need to build capacity in order to meet the increasing demands for more comprehensive services, and CB will be done by a)Assessing the gaps in knowledge and capabilities to meet requirements; b)Setting up the appropriate collective actions/projects to fill the gaps; c)Ensuring that the Region and its NMHSs have the right people with the right skills to achieve their objectives. RA VI Strategic Plan 2008-2011
22
Regional Associations (Summary) RA I RA II RA III RA IV RA V RA VI RA VI Strategic Plan 2008-2011 Importance of Capacity Building addressed in all regions Regional Approach highlighted
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.