Client logo MnDOT - ACEC/MN Annual Conference Creating Multimodal Connections Facilitator Patrick Watz, AECOM March 5, 2013.

Similar presentations


Presentation on theme: "Client logo MnDOT - ACEC/MN Annual Conference Creating Multimodal Connections Facilitator Patrick Watz, AECOM March 5, 2013."— Presentation transcript:

1 Client logo MnDOT - ACEC/MN Annual Conference Creating Multimodal Connections Facilitator Patrick Watz, AECOM March 5, 2013

2 Page 2 Central Corridor – The Common Link 18 new stations 11 miles long 9.8 miles of new double track 47 new Light Rail Vehicles 40,940 average weekday ridership in 2030 18 new stations 11 miles long 9.8 miles of new double track 47 new Light Rail Vehicles 40,940 average weekday ridership in 2030

3 Page 3 Preliminary Engineering (PE) Environmental Documentation Final Design - Heavy Construction Begins Full Funding Grant Agreement Continue Heavy Construction Start Operation 2014 Central Corridor Timeline 2009 2007 2011 2010 2011 - 2013

4 Page 4 Regional Transitway System

5 Page 5 Connecting Transit Modes

6 Page 6 Todays Presentations The Interchange Project: Innovation in Multimodal Planning & Design George Fantauzza, Project Architect, The Interchange Union Depot Renovation & Restoration: A Multimodal Transportation Hub Greg Brown, URS Corporation Kevin Dalager, Mortenson Michael Bjornberg, HGA