INFSO-RI-031688 Enabling Grids for E-sciencE www.eu-egee.org EGEE-III Status and Plans Erwin Laure EGEE-II Technical Director CERN, Switzerland.

Slides:



Advertisements
Similar presentations
FP7 Preparations ISTC meeting 31 March Content FP7 preparation approach and timetable Context for FP7 and for ICT in FP7 Research in New Financial.
Advertisements

EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE-III Program of Work Erwin Laure EGEE-II / EGEE-III Transition Meeting CERN,
EGI: A European Distributed Computing Infrastructure Steven Newhouse Interim EGI.eu Director.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Nov. 18, EGEE and gLite are registered trademarks EGEE-III, Regional, and National.
Work Programme for the specific programme for research, technological development and demonstration "Integrating and strengthening the European Research.
INFSO-RI Enabling Grids for E-sciencE-II Anna Cook Dita Mocova Reporting procedures & Financial Guidelines.
INFSO-RI Enabling Grids for E-sciencE EGEE Induction Grid training for users, Institute of Physics Belgrade, Serbia Sep. 19, 2008.
Technology Strategy Board Driving Innovation Participation in Framework Programme 7 Octavio Pernas, UK NCP for Health (Industry) 11 th April 2012.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Related Projects Dieter Kranzlmüller Deputy.
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Steven Newhouse EGEE’s plans for transition.
Notur: - Grant f.o.m is 16.5 Mkr (was 21.7 Mkr) - No guarantees that funding will increase in Same level of operations maintained.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ?? Athens, May 5-6th 2009 Community Support.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Technical Overview EGEE-II’s achievements.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
EGEE-II INFSO-RI Enabling Grids for E-sciencE 3 rd All-Activity Meeting Introduction and NA1 status Bob Jones – Project Director,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE – paving the way for a sustainable infrastructure.
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
Ian Bird LCG Project Leader OB Summary GDB 10 th June 2009.
Enabling Grids for E-sciencE 1 EGEE III Project Prof.dr. Doina Banciu ICI Bucharest GRID activities in RoGrid Consortium.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE NA5 – Policy and International Cooperation Panagiotis Louridas, Fotis Karagiannis, GRNET Final.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Multi-level monitoring - an overview James.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Bob Jones EGEE project director CERN.
INFSO-RI Enabling Grids for E-sciencE External Projects Integration Summary – Trigger for Open Discussion Fotis Karayannis, Joanne.
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) The EPIKH Project Roberto Barbera
EGEE-III INFSO-RI Enabling Grids for E-sciencE Presentation of templates and supporting documents Anna Cook EGEE-II / EGEE II Transition.
INFSO-RI Enabling Grids for E-sciencE Policy and International cooperation Matti Heikkurinen, NA5 leader CERN All Activity Meeting.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks David Fergusson, Emidio Giorgio, Gergely.
EGEE-III-INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-III All Activity Meeting Brussels,
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Gergely Sipos Activity Deputy Manager MTA.
INFSO-RI Enabling Grids for E-sciencE-II Anna Cook Dita Mocova Reporting procedures & Financial Guidelines.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Going from EGEE-NA ES cluster to EGI SSC.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE-II Status Bob Jones – Project Director.
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
INFSO-RI Enabling Grids for E-sciencE Policy and International cooperation Fotis Karayannis, NA5 activity leader All Activity Meeting.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Robin McConnell NA3 Activity Manager 28.
INFSO-RI Enabling Grids for E-sciencE Plans for the EGEE-2 EGEE 2 Task Force 3rd EGEE Conference, Athens, April 2005.
SEE-GRID-2 The SEE-GRID-2 initiative is co-funded by the European Commission under the FP6 Research Infrastructures contract no
INFSO-RI Enabling Grids for E-sciencE The EGEE Project Owen Appleton EGEE Dissemination Officer CERN, Switzerland Danish Grid Forum.
EGEE is a project funded by the European Union under contract IST EGEE Summary NA2 Partners April
INFSO-RI Enabling Grids for E-sciencE Quality Assurance Gabriel Zaquine - JRA2 Activity Manager - CS SI EGEE Final EU Review
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
INFSO-RI Enabling Grids for E-sciencE EGEE Contributions to e-Infrastructure policy work Matti Heikkurinen, NA5 leader, CERN EGEE.
EGEE is a project funded by the European Union under contract INFSO-RI NA5 M. Heikkurinen NA5 Activity Manager All Activity Meeting, 13 th September.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Technical Overview EGEE-II’s achievements.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NGI Policy Workshop Introduction and scope.
Resource Provisioning EGI_DS WP3 consolidation workshop, CERN Fotis Karayannis, GRNET.
Fabrizio Gagliardi EGEE Project Coordinator EGEE is proposed as a project funded by the European Union under contract IST
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks NA5: Policy and International Cooperation.
INFSO-RI Enabling Grids for E-sciencE EGEE general project update Fotis Karayannis EGEE South East Europe Project Management Board.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations automation team presentazione.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
INFSO-RI Enabling Grids for E-sciencE NA5 – Policy and International Cooperation Panagiotis Louridas, Fotis Karagiannis, GRNET Final.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Country Reports AAM Brussels.
INFSO-RI Enabling Grids for E-sciencE EGEE-II project proposal overview By Bob Jones EGEE Technical Director CERN.
The EPIKH Project Roberto Barbera
NA5: Policy and International Cooperation
Long-term Grid Sustainability
EGEE support for HEP and other applications
Cécile Germain-Renaud Grid Observatory meeting 19 October 2007 Orsay
Collaboration Board Meeting
Presentation transcript:

INFSO-RI Enabling Grids for E-sciencE EGEE-III Status and Plans Erwin Laure EGEE-II Technical Director CERN, Switzerland

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 2 EGEE-III Planning This presentation shows the latest status of the EGEE-III project planning based on: –Input from PEB  Vision and mission document (with issues) prepared by the PEB  Defined tasks with first manpower estimates though no division into activities has yet been made –Feedback received from PMB/PEB workshops held in October and December 2006 Contents –Vision & Mission –Goals –Overall Principles –Issues still to be addressed –Consortium structure –Dealing with collaborating projects –Budget –Timeline and roadmap

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 3 EGEE-III vision and mission The main vision of EGEE-III is to make a strong move towards a sustainable world-wide production quality Grid infrastructure by appropriate technical and organisational decisions. This must be capable of providing services to a rapidly increasing number of application areas, and make Grid technology easily accessible and usable for these communities. Issue: how much support is EGEE expected to give to 3 rd parties wrt middleware, distribution, operational support and related documentation?

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 4 EGEE-III Goals The provision of continuous operational and deployment support –with world-wide coverage which can cope with the predicted growth in sites and utilisation; To establish and encourage best practices regarding security –across all aspects of the project: applications, middleware, deployment and operations; The provision of reliable and performative Grid middleware foundation services –to users by development and maintenance services together with appropriate integration and deployment; The provision of selected high level middleware support services –for selected, priority application areas, with an associated integration and deployment process; Collaboration with mature applications domains –in particular via selected “centres of excellence”, as primary source of innovation and collaboration with user communities;

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 5 EGEE-III Goals The provision of high quality support for VOs –ranging from the mature ‘production’ VOs to the large number of new VOs entering the Grid; –this would include the whole range of user support encompassing training, access to documentation and information, applications support and day-to-day Grid user support; Make significant advances in the transfer of Grid technology to a wide range of business communities; Enhance the distribution of information –to a wide range of prospective and current users to aid the expansion of the use of Grid technology world-wide;  2 aspects: marketing and technical information and support; Ensure the overall world-wide coherence of the developments by ongoing work with other Grid projects, European and worldwide networking organizations, and world-wide standards organisations.

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 6 Overall Principles Clusters of competence –Avoid thinly spread manpower (shown to be ineffective); –Co-locate user, operations, and middleware support, training and dissemination where appropriate to increase synergies; –Invest in quality rather than full geographic coverage (quantity); –Minimum commitment of 50% for activity personnel. More flexibility in tasks assignments by activity mgrs –Often issues arise that were not foreseen at the time of writing the DoW; –Need more flexibility to assign people to these issues: encourage volunteers; –Partners should give more support to activity managers; –Could we change the management structure to better reflect the partner reality? Resource assignment processes need to involve resource owners –ROCs often cannot take appropriate decisions. Need to agree on overall project policies from which decisions can be derived

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 7 Issues still to be addressed Clarify the role of National Grid Initiatives Ensure the project has a strong operational management structure that is capable of allocating resources (both computing and manpower) dynamically to address issues that arise Need to make developments in “automation” that will reduce the amount of effort required to operate/manage the infrastructure Clarify the relative weight of middleware innovation compared to its maintenance

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 8 Consortium structure EGEE-II counts 91 contractors and 48 JRU members Need to rationalise the consortium in preparation for EGI project National Grid Initiatives will be the mainstay of EGI structure JRU mechanism used in EGEE-II can serve as a mechanism by those countries where a NGI is not yet in place JRU Workshop held in Brussels on 1 st December –Attended by 34 people representing 16 countries & Christophe Kowalski, financial and legal officer at DG INFSOM – –Positive feedback from attendees on intentions to form JRUs EGEE-III will accept only one public research/academic partner per EU- funded country. Those countries that have more than 1 potential public research/academic partner are invited to form a JRU and identify a single partner to sign the EGEE-III contract

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 9 Collaborating projects census: projects registered so far Applications improved services for academia, industry and the public Support Actions key complementary functions Infrastructures geographical or thematic coverage

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 10 EGEE-preferred aspects for collaborating projects Have well defined goals and concrete targets –Prefer deployment/demonstration projects rather than “paper tigers” Mobilise a user community on an international level –Bring together a number of groups working on a common goal Identify partners that are willing to make computing resources available for the application(s) –Either in a separate infrastructure or connected to EGEE Can make use of service(s) from EGEE’s gLite middleware –Have software expertise to be able to gridify applications Identify common partners with the EGEE consortium –To ensure the collaborating project has sufficient Grid expertise and act as links to EGEE

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 11 Expansion of the geographical scope of the infrastructure by use of EGEE operations & gLite middleware –BalticGrid, EELA, EUMedGrid, SEE-GRID2 –highest level of support (but need to create/define a ROC) Interoperation with other grid programmes –EUChinaGrid, EUIndiaGrid, KnowARC, DEISA, Naregi, OSG, TeraGrid –need to determine work involved, how it will be funded and identify user communities that bridge both projects Collaborating Infrastructure Projects

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 12 EGEE-III Budget EU contribution capped at 35 Million € –INFRA e-Science Grid infrastructures is likely to be ~50 Million € FP7 cost models allow to charge up to 75 % of costs –This could reduce the total effort available within the project EGEE-III will aim at a total effort of 10,000 Person Months (compared to 11,165 for EGEE-II with ~37 Million € EU funding)

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 13 Timeline and Roadmap Jan: Address open issues at EGEE-II meeting (PMB+AA in Bologna) 26/27 Feb: PMB Meeting for EGEE-III progress review and NGI workshop April: 1st draft of EGEE-III proposal ready 9-11 May EGEE-II Consortium user forum event in Manchester  Present EGEE-III plan to all EGEE-II partners May EGEE-II review:  EGEE-III proposal will need to take into account relevant feedback July : final draft Sept : Assume call closes for INFRA e-Science Grid infrastructures? Nov-spring’08: hearings and contract negotiation process –Produce Description of Work document 1 April’08: EGEE-III start? –Short time to complete negotiation (exact dates of call not yet known) –May be in the same situation as EGEE-II: start project before contract is signed –Still need to consider an extension in time to EGEE-II (e.g. 2 months) EGEE partners and participating JRU members must make known any intention to submit other proposals in the same Call as EGEE-III. Failure to notify EGEE of such proposals may cause the partner to be removed from the consortium.

Enabling Grids for E-sciencE INFSO-RI EGEE-III Status and Plans 14 Concrete next steps PEB to make initial plans concrete –Define clusters of competence –Define technical work program and make tasks more concrete based on material produced so far –Get initial partner/work assignments –Pre-filled template will be distributed after AAM by PO –PEB meeting on Jan. 25 th to discuss details Define project-wide milestones (deliverables) –½ day PEB workshop in February (proposed: Feb 22) –First concrete plans need to be available for that – Feb 20. Further refinements during March