Energy Balancing Credit Proposals Transmission Work Stream 7th October 2010 Loraine O'Shaughnessy.

Slides:



Advertisements
Similar presentations
Energy Balancing Credit Proposal MOD 315 Energy Balancing Credit Proposal MOD 315 To Enhance Section X of the UNC Transportation Principal Document to.
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Energy24 limited Modification Proposal 0502: Amendment to Gas Quality NTS Entry Specification at the px Teesside System Entry Point.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Energy Balancing Credit Proposals Transmission Work Stream 6th November 2008 Mark Cockayne.
EBCC MEETING 25 th October AGENDA 1.0Introduction 2.0Minutes and Actions 3.0Operational Update 4.0Modification Proposals 5.0 Significant Code Review.
UNC Modification Proposal Daily Metered Elective Action 005: User Pays Proposal Simon Trivella – 4 th November 2008 Development Work Group 0224.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
Credit Arrangements During a Prolonged Emergency Mark Cockayne and Jayne McGlone 11 December 2006 Whilst all reasonable efforts have been made to verify.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
1 Transmission Work Group 1 st November 2012 Gas Security of Supply SCR Proposals Credit Implications for GB Gas Market EBCC Response Summary Mark Cockayne.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
PN UNC Workgroup Settlement topic 4 th October 2011.
Proposed Further Security Request Process. Contents  Introduction Page 2  Illustrative example of Request to Provide Further Security Request Following.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
Industry Dialogue on xoserve Services 14 th September 2007.
Energy Balancing Credit Variation Proposal Modification 0233 Transmission Work Stream 5th March 2009 Mark Cockayne.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
IDENTIFICATION AND ASSESSMENT OF CREDIT EXPOSURE Michelle Wilson, Credit & Risk Manager – Transco plc 25 April 2003.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
Supply Point Enquiry Service
Review of System Alerts
Exit Capacity User Commitment – Transmission Workstream update
Introduction of Code Contingency Guidelines Document
PN UNC Workgroup Invoicing 4th October 2011.
CAP190: Workgroup Report CUSC Modifications Panel, 26th August 2011
Transmission Workgroup – 1st December 2011
Proposer: National Grid NTS Panel Date: 17th April 2014
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
TSC Modifications Panel Meeting
UNC Modification – Non Effective Days
NTS Entry Charging Review Update
UNC User Representatives Process
Project Nexus Workgroup
0291 – NTS Licence Special Condition 27 – Balancing Arrangements
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Proposer: Colette Baldwin – E.ON Panel Date: 21st August 2014
UNC Modification 0531 Provision of Industry Testing System
UNC Modification Proposal 0362
Project Nexus Workgroup
Introduction of Code Contingency Guidelines Document
Modification Proposal 0474: Inclusion of the guidelines relating to the “Customer Settlement Error Claims Process” within UNC governance.
Draft Mod: Update of default System Marginal Prices
PN UNC Workgroup Settlement Overview
Transmission Workstream 2nd December 2010
Options for the Development of a Demand Side Response Mechanism
Proposer: Debbie Brace Panel Date: 20th March 2014
UNC User Representatives Process
Part B Suspension When Suspended Under Part A
User Pays Principles and Governance
Code Modification Proposal No 0315
Gemini Code Contingency Review
Draft Modification To Enhance Section X of the UNC to improve the Energy Balancing Further Security Process 25th June 2010.
Project Nexus Workgroup
UNC Modification 0229 Role of the UNC Committee
Transmission Workstream 05 November 2009
Joint Office UNC Elections
Joint Office UNC Elections
Joint Office UNC Elections
Customer Issue Management Dashboard CoMC
Presentation transcript:

Energy Balancing Credit Proposals Transmission Work Stream 7th October 2010 Loraine O'Shaughnessy

Background  Following failure of Lehman’s and unprecedented economic factors in financial markets EBCC carried out review of the UNC section X and the Energy Balancing Credit Rules.  One of several modification requirements that were identified:  Implemented :  To Correct Drafting Inconsistencies between Sections X and V of the UNC in Respect of User Default and Termination  Recovery of Debt and Smearing of Revenues via Energy Balancing Neutrality  In progress:  0233V - Changes to Outstanding Energy Balancing Indebtedness Calculation: working with EBCC to develop alternative proposal  To Enhance Section X of the UNC Transportation Principal Document to improve the Energy Balancing Further Security Process : Panel recommendation 21 st Oct

Proposal  The aim of this proposal is to recover costs associated with the procurement of Credit Rating Analytic Services  Extend the provisions under F  Recover costs of approx £40,000

Drivers  Following failure of Lehman’s and the unprecedented financial climate change. In an attempt to reduce the communities risk xoserve introduced daily processes to monitor all financial institutions underwriting Energy Balancing exposures.  Since Sept 2008 over 60% of financial institutions providing Security in respect of Energy Balancing exposures have been down graded.

Benefits  Streamlines the risk management process  Improved accuracy and response times to changes in Company ratings  Reduced man hours carrying out activities introduced following Lehman’s failure and change in the economic climate

Next Steps  Issue proposal to be discussed at the October UNCC meeting with a view to go to consultation