CLIC-UK Programme Status Philip Burrows John Adams Institute Oxford University 1.

Slides:



Advertisements
Similar presentations
LC-ABD P.J. Phillips, W.A. Gillespie (University of Dundee) S. P. Jamison (ASTeC, Daresbury Laboratory) A.M. Macleod (University of Abertay) Collaborators.
Advertisements

1 ILC Bunch compressor Damping ring ILC Summer School August Eun-San Kim KNU.
– A robust bunch length monitor Comissioning and first results of a possible standard diagnostic tool Laurens Wissmann Bernd Steffen, Jonas Breunlin.
Synchronization system for CLIC crab cavities Amos Dexter, Ben Woolley, Igor Syratchev. LCWS12, UTA October 2012.
Particle Accelerator Engineering, London, October 2014 Phase Synchronisation Systems Dr A.C. Dexter Overview Accelerator Synchronisation Examples Categories.
ATF2 FB/FF layout Javier Resta Lopez (JAI, Oxford University) for the FONT project group FONT meeting January 11, 2007.
Design of Standing-Wave Accelerator Structure
RF Synchronisation Issues
Before aperture After aperture Faraday Cup Trigger Photodiode Laser Energy Meter Phosphor Screen Solenoids Successful Initial X-Band Photoinjector Electron.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
CLIC Drive Beam Linac Rolf Wegner. Outline Introduction: CLIC Drive Beam Concept Drive Beam Modules (modulator, klystron, accelerating structure) Optimisation.
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
ASTeC Report for CLIC-UK Jim Clarke on behalf of all ASTeC & Technology Department staff contributing to CLIC-UK STFC Daresbury Laboratory, UK CERN-UK.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Pavel Karataev John Adams Institute for Accelerator Science At Royal Holloway, University of London oPAC Advanced School on Accelerator Optimisation 7-11.
LLRF for EUCARD Crab Cavities Graeme Burt (on behalf of Amos Dexter) Paris May 2011.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
CLIC09 Workshop October 2009Drive beam BPM’sLars Søby 1 Drive Beam BPM’s CLIC 09 work shop, CERN, of October 2009, Lars Søby.
EUCARD WP12 DESY 2015 Slide 1 EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement.
Measurements of the X-ray/pump laser pulse timing Valery Dolgashev, David Fritz, Yiping Feng, Gordon Bowden SLAC 48th ICFA Advanced Beam Dynamics Workshop.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
UK LC accelerator programme Philip Burrows John Adams Institute Oxford University 1.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
WP 9.2 DDS Status, R.M. Jones, 25 th Oct 2010, WebEx Phone-in, Geneva 1 WP 9.2: DDS Status Roger M. Jones Cockcroft Institute and The University of Manchester.
WP: CTC beam instrumentation task3 CLIC Electro-Optic Bunch Temporal Profile Monitor Allan Gillespie 1, David Walsh 1,2, Steve Jamison 2, Rui Pan.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
Taikan SUEHARA et al., LCWS2007 & DESY, 2007/06/01 R&D Status of ATF2 IP Beam Size Monitor (Shintake Monitor) Taikan SUEHARA, H.Yoda, M.Oroku,
High Power RF Measurements Ben Woolley, Amos Dexter, Igor Syratchev. Jan Kovermann, Joseph Tagg HG2013, Trieste June 2013.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Development of a High Resolution Cavity BPM for the CLIC Main Beam
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
FP7: EuCARD after a year of preparation… A.Jeremie.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Phase Feed-Forward Piotr Skowroński (CERN)
Re-entrant BPM R&D for ILC Main Linac
Electro-Optic Bunch Profile Monitor for the CERN-CTF3 probe beam
CLIC Crab Synchronisation
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
An X-band system for phase space linearisation on CLARA
CLIC Workshop 2016: Main Beam Cavity BPM
Have a chance to operate your own beam at CERN
Timing and synchronization at SPARC
RF Synchronisation Issues
What Should We Do?.
Developments on Proposed
F.Marcellini, D.Alesini, A.Ghigo
Task 2: High-gradient normal-conducting technology development
ATF2 Instrumentation Stewart T. Boogert
Update of CLIC accelerating structure design
Progress towards nanometre beam stabilisation at ATF2
CLIC Beam Instrumentation
CLIC Feasibility Demonstration at CTF3
Breakout Session SC3 – Undulator
Presentation transcript:

CLIC-UK Programme Status Philip Burrows John Adams Institute Oxford University 1

CLIC-UK programme CI/Manchester: main beam RF, crab cavities CI/Lancaster: crab cavities ASTeC: drive-beam quads + crab cavities JAI/Oxford: beam FB+FF, laserwire, BPMs JAI/RHUL: transverse beam size, cavity BPMs Dundee: longitudinal beam profile monitor 2

Drive beam 3

Drive Beam Quadrupoles (ASTeC) High energy quad – Gradient very high Low energy quad – Very large dynamic range Erik Adli & Daniel Siemaszko High Energy Quad Low Energy Quad

Basic Engineering Concept Steel Non-magnetic support PM Block Steel Pole Norbert Collomb

Measured Field Quality

7 Drive beam phase feed-forward (Oxford) Schulte

8 Drive beam phase feed-forward Skowronski

System concept (CDR) urad kick at each bend - 0.5% energy spread, 1m dispersion -> 5mm rms - beam pipe diameter >> 50mm - 4 kickers at each bend - > 400kW peak power amplifier to each kicker dipole magnet 1m kicker 400kW amp 8m5m 8m NOT TO SCALE 9

CTF3 phase FF prototype 10

11 Phase monitor (Frascati) Signal down-mixer (CERN) Feedback processor + firmware (JAI Oxford) Drive amplifier (JAI Oxford) Kickers (Frascati)  1 mrad kick  1.2 mm path length change  17 degrees at 12 GHz  0.2 degree resolution CTF3 phase FF prototype

12

13

14

15

Feedback and instrumentation 16

ATF2/KEK: prototype final focus 17 Goals: 1)37 nm beam spot (65 nm achieved 2013) 2)Beam spot stabilisation at c. 5 nm level

ATF2/KEK: prototype final focus 18 Beam feedback + feed-forward systems Precision cavity + stripline BPMs Beam size diagnostics Beam tuning techniques

19 Aim to stabilise beam in IP region using 2-bunch spill: 1. Upstream FB monitor beam at IP 2. Feed-forward from upstream BPMs  IP kicker 3. Local IP FB using IPBPM signal and IP kicker Beam feedback + feed-forward (Oxford)

Upstream FONT5 System Analogue Front-end BPM processor FPGA-based digital processor Kicker drive amplifier Stripline BPM with mover system Strip-line kicker Beam BPM Resolution < 350nm Dynamic range of the BPM system+/-500μm System Latency<150 ns Amplifier Bandwidth~30 MHz 20

Interaction Point FONT System Analogue Front-end BPM processor FPGA-based digital processor Kicker drive amplifier Strip-line kicker Designed in house 12.5 cm stripline kicker Based on ATF stripline BPMs Beam Cavity BPM 21

ATF2 beam stabilisation results 1.Upstream FB: beam stabilised at IP to ~ 300 nm 2. Feed-forward: beam stabilised at IP to ~ 106 nm 3. IP FB: beam stabilised at IP to ~ 93 nm Getting interesting! (i.e. hard) 22

IP Feedback in CLIC CDR 23

ATF2 beam position monitors (RHUL) IBIC : Beam Instrumentation at ATF2 (S. T. Boogert for ATF collab.) 11/03/201624

CLIC Main beam BPM prototype Low-Q stainless steel cavity Simulation in – Gdfidl – Microwave studio Measurement – RHUL (before) and CERN (after brazing) – Beam CALIFES Dipole cavity – f dipole = GHz – Q L = 274 – Q 0 =450 Reference cavity – f dipole = GHz – Q L = /03/2016 IBIC : Beam Instrumentation at ATF2 (S. T. Boogert for ATF collab.) 25

26 Transverse beam size (JAI)

27

28

29

30

Electro-Optical Spectral Decoding (Dundee) Spectral Decoding (EOSD): The Coulomb field temporal profile of the e-bunch is encoded on to a time-wavelength correlated optical probe pulse. The profile is read-out through the spectrum of the probe pulse. Where, Simulations of bunch-induced polarisation change and non-linear interaction

P: Polarizer H: Half wave plate Q: Quarter wave plate : Mirror with actuators : Finger camera Grating Laser: Wavelength: 780 nm Duration: 100 fs Repetition: MHz Pulse energy: 2.7 nJ Crystal: Thickness: 1mm Separation: 5-10 mm Photo-injector Accelerating structureDiagnostic section Beam direction 10 Actuators 3 Rotation motors 6Finger cameras 7 Plane mirrors 2 Polarizers 2 Wave plates 1 Lens 1 Fibre head In CLEX 1 Laser 1 ICCD Camera 1 Motor stage 10 Plane mirrors 3 Gratings 3 Lenses 1 Fibre head In Lab Gated iCCD Camera Intensifier size 25 mm Number of Pixels 1280 x 1024 Pixel Size 6.7 um x 6.7 um Scan Area 8.6mm x 6.9mm Scaling Rates (magnification) 1: 2.17 CCD Temperature (by air) -12 o C Full Well Capacity (Image pixel well depth) 25,000e - Readout Noise 7…8e A/D convertor 12 bit A/D conversion factor (Sensitivity) 5 e - /count Average Dark Charge (Equivalent Background Illuminance) <0.1 e - /pixel sec Readout Time (Full frame) 8 fps Min gating time 3 ns QE ~25% Implementation of the EO monitor at CALIFES

33

Crab cavity (Lancaster, ASTeC) 34

Objectives: Calculate wakefield effects for CLIC beams and analyze alignment tolerances. Optimize crab cavity damping structures. Design and fabricate a crab cavity appropriate for high gradient testing at CERN Feasibility studies and associated measurements for the Crab RF distribution system.

Full structure (with coupling and damping) magEz at GHz

CLIC Prototype 1 - UK manufactured Test by measuring S-parameters at each port then combining to get the dual port F-parameters. Cavities have not been tuned yet. The 1 st CLIC crab cavity prototype has been manufactured by Shakespeare Engineering in the UK. Tolerance and surface roughness on single parts have been measured and are acceptable. Structure is planned to be tested at SLAC in the near future.

Prototype 2 – CERN/VDL Built Size Number of cells12 Total length (mm) Active length (mm) The structure being built for high gradient test at CERN has only a single feed as it will not see beam. Cavity is being machined at VDL along with main linac structure to allow comparison of gradients.

Revised Crab Synchronisation Scheme 48MW 200ns pulsed GHz Klystron repetition 50Hz Vector modulation Control Phase Shifter 12 GHz Oscillator Main beam outward pick up From oscillator Phase shifter trombone (High power joint has been tested at SLAC) Magic Tee Waveguide path length phase and amplitude measurement and control 4kW 5  s pulsed 11.8 GHz Klystron repetition 5kHz LLRF Phase shifter trombone LLRF Cavity coupler 0dB or -40dB Expansion joint Single moded copper plated Invar waveguide losses over 35m ~ 3dB -30 dB coupler Forward power main pulse 12 MW Reflected power main pulse ~ 600 W Reflected power main pulse ~ 500 W Waveguide from high power Klystron to magic tee can be over moded Expansion joint RF path length is continuously measured and adjusted

Board Development and CW tests Front end electronics to enable phase to be measure during the short pulses to an accuracy of 2 milli-degrees has been prototyped and dedicated boards are being developed. PLL controller MCU 10.7 GHz VCO Digital phase detector DBMs Power Meters Wilkinson splitter Inputs 400 ns span: RMS: 1.8 mdeg Pk-Pk: 8.5 mdeg 90 s span: Drift rate : 8.7 mdeg/10s Total drift: 80 mdeg

Main linac structure studies (Manchester) Alternative designs including wakefield suppression of HOMs 41

Convex ellipticity Single undamped cell Iris radius=4.0 mm CLIC_DDS_E Elliptical Design –E Fields Circular Square b a

Summary CLIC-UK has delivered significant contributions Discussing next phase aimed at tackling issues in preparation for project implementation plan: Phase feed-forward prototype (CTF3) Nanometer beam stabilisation (ATF2) Beam Delivery System + MDI design Beam instrumentation + diagnostics systems Suggestions to look at dipole magnet design Crab cavity Klystron design 43