NCSX Strykowsky 1Cost and Schedule Rebaseline April 25, 2005 NCSX Project Re-baseline Review April 25, 2005 Cost and Schedule Ron Strykowsky.

Slides:



Advertisements
Similar presentations
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Advertisements

1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
Cost, Schedule & Funding Closeout Jan Joint DOE/NSF CD2/3a Review 1 DOE/NSF Review of the Dark Energy Survey (DES) Project SC 6/7 Cost, Schedule.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
RF Cavity / Coupling Coil Module
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April/May 2012.
U.S. ATLAS Physics and Computing Budget and Schedule Review John Huth Harvard University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
Travel Website Enhancement Project Project Update First Name Last Name.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
Princeton University Plasma Physics Laboratory EVMS Certification Review NSTX Project Overview Ron Strykowsky October 4-6, 2011.
NCSX NCSX Project Update Hutch Neilson, Project Manager for the NCSX Team Princeton Plasma Physics Laboratory Oak Ridge National Laboratory Briefing for.
OFFICE OF SCIENCE 1 3. Cost Estimate Gines, Fisher 2.Are the estimated cost and proposed schedule ranges realistic, consistent with the technical and budgetary.
Management & Development of Complex Projects Course Code - 706
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Project Status Report Presenter Name Presentation Date.
Hutch Neilson Princeton Plasma Physics Laboratory Stellarator Team Meeting 3 March 2011 Stellarator Program Update.
SC Project Review of NCSX, April 8-10, 2008 Ron Strykowsky - page 1 Office of Science NCSX Project Review of NCSX April 8-10, 2008 Cost and Schedule Ron.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Anthony Indelicato DOE-Princeton Site Office May 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the NSTX.
TOF Preliminary Design and Safety Review Project Management Controls R. L. Brown.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
NCSX Field Period Assembly (FPA) Operations, Cost and schedule, staffing, and metrology utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
Mark Reichanadter LCLS October 9-11, 2007 LCLS BCR Overview and EIR LOIs Project Progress / Status Revised Project Baseline.
1 Field Period Assembly Office of Science Project Review Princeton Plasma Physics Laboratory Princeton, NJ November 2, 2005 T. Brown Princeton Plasma Physics.
NCSX NCSX Project Meeting Wayne Reiersen 15 December 2004.
VOWTAP Progress Report VOWDA December 2, DOE Grants VOWTAP Extension No Cost Time Extension until May 31, 2016 Conditional upon achievement of two.
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – December 2012.
NCSX Project Overview and Management Hutch Neilson, NCSX Project Manager Princeton Plasma Physics Laboratory Oak Ridge National Laboratory Office of Science.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
Tom Egebo PPPL Review of the NSTX TF Coil Repair Effort September 3 - 4, 2003 Cost & Schedule to Completion Supported by Columbia U Comp-X General Atomics.
AWB Dimensional Control Requirements for the Modular Coils and TF coils Field Period Assembly Peer Review October 11-12, 2006 Art Brooks.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
Anthony Indelicato DOE-Princeton Site Office February 2014 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – March 2012.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
DRAFT Cost and schedule, staffing, metrology utilization 10 AM October 12, 2006 Mike Viola Field Period Assembly Manager.
Six Sigma Project Coding Performance Improvement Project Global Communication, Inc.
Strykowsky 1Office of Science Review August 15, 2007 Office of Science Project Review NCSX August 15-17, 2007 Cost and Schedule Ron Strykowsky.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – August 2012.
1 WBS 1 Preparation for FDRs NCSX WBS 1 Engineering Meeting March 17, 2003 What establishes the plan? What are near term deliverables? How will we status.
The categories for ILC budget planning are: R&D – work done in laboratories to develop and verify subsystem components. This supports the cost reduction.
PPPL Stellarator Program Overview Hutch Neilson NCSX Project Manager NCSX Program Advisory Committee Meeting #6 Princeton, NJ December 9, 2002.
1 CD-2 ECP Preparations What is Needed. 2 Background As part of the CD-2 process, we need to establish a fully supported and documented cost and schedule.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – April 2013.
Anthony Indelicato DOE-Princeton Site Office December 2012 Construction Progress Review for the NSTX Upgrade Project Construction Progress Review for the.
SC Project Review of NCSX, April 8-10, 2008 C. A. Gentile NCSX Startup (WBS 85) C.A.Gentile NCSX CD-4 Startup.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
Status of the MICE Construction Project
SmartMeterTM Steering Committee Update – September 2012
External Independent Review (EIR)
Overall Project RAG Status
SmartMeterTM Steering Committee Update – March 2013
SmartMeterTM Steering Committee Update – June 2012
FY14 Q1 Forecast Review Meeting July 2013
SmartMeterTM Steering Committee Update – July 2012
SmartMeterTM Steering Committee Update – February 2013
SmartMeterTM Steering Committee Update – November 2012
Conventional Facilities
Presentation transcript:

NCSX Strykowsky 1Cost and Schedule Rebaseline April 25, 2005 NCSX Project Re-baseline Review April 25, 2005 Cost and Schedule Ron Strykowsky

NCSX Strykowsky 2Cost and Schedule Rebaseline April 25, 2005 Overview Project Baseline Cost and Schedule baseline updated Re planned the project to support a flat funding profile of $15.9M –Work scope stretched out –Overhead rates revised –Escalation impact –First plasma July 2009 with 5 months float Estimate-to-complete performed for balance of work scope –Folded in learning from final design of MC,VV as well as MC R&D –Progress and forecast from the VVSA and MCWF production effort –Future challenges identified –Contingency balance re-evaluated –Basis of estimate Single shift/8 hour days except early MC winding effort TF Fabrication by PPPL Modular Coil hardware and component fabrication by industry

NCSX Strykowsky 3Cost and Schedule Rebaseline April 25, 2005 Budget Summary

NCSX Strykowsky 4Cost and Schedule Rebaseline April 25, 2005 Budget Reconciliation Increases Due to Project Stretch-out

NCSX Strykowsky 5Cost and Schedule Rebaseline April 25, 2005 Budget Reconciliation cont. ETC Identified Risks & Opportunities Not Included Not reflected in the rebaseline. Needs further quantification and understanding. To be addressed by contingency.

NCSX Strykowsky 6Cost and Schedule Rebaseline April 25, 2005 Contingency & Risk Assessment Contingency Analysis WBS 12&14 Maintain 10% on balance of VVSA and MCWF contract. WBS 13 TF fabrication risk based upon prelim ETC estimates. FDR scheduled for May05. WBS 18 FP Assy fixturing- Based upon initial vendor contacts. Hardware yet to be designed. WBS 18 & 82 Dimensional control coordination & support WBS 14 Modular coils assy hardware (nuts & bolts & shims) WBS 14 MC Winding Operations Major Drivers of contingency Contingency balance re-assessed

NCSX Strykowsky 7Cost and Schedule Rebaseline April 25, 2005 Funding Plan supports BA guidance with adequate contingency distribution

NCSX Strykowsky 8Cost and Schedule Rebaseline April 25, 2005 Project Schedule Maintained 5 months float 2 winding lines instead of 3 2 shift on the first 9 MC using a third winding team Optimized MCWF deliveries Increased schedule margin in the TF fabrication and FP assy operations Philosophy was to delay low risk operations but start asap and stretch out high risk operations (ie TF fab, FP assy)

NCSX Strykowsky 9Cost and Schedule Rebaseline April 25, 2005 Project Milestones

NCSX Strykowsky 10Cost and Schedule Rebaseline April 25, 2005 Staffing Project Staffing Plan (incl contingency) Technician Staffing (by operation exc contingency) FY05 FY06 FY07 FY08 FY09 Technicians PPPL Engrs ORNL Engrs Previous baseline Technicians “Relaxed” technician demands Flexibility of moving third winding team between MC and TF coil

NCSX Strykowsky 11Cost and Schedule Rebaseline April 25, 2005 Conclusion Project re-scheduled to meet new BA guidance with adequate schedule float. Budget Increases Consistent with stretchout of schedule Contingency balance and profile adequate to manage future risks Project staffing requirements achievable.