GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
Advertisements

GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope ISOC Review 15 February 2006 FSW Activities, Organization, and Resource Needs Jana Thayer Stanford Linear Accelerator Center.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Telecommand and Telemetry Data Dictionary Services Sergio.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope:
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 LAT Housekeeping Sergio Maldonado Stanford Linear Accelerator.
Automated Industrial Wind Tunnel Controller By Daniel Monahan and Nick DeTrempe Advised by Dr. Aleksander Malinowski.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
# - 1 E. Andrews LAT Software Schedule  Key FSW Milestone Dates –PAST: Jan ‘02 / Jul ‘02 – Preliminary Design Review / Delta PDR May ’03 – Critical Design.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Peer Review, March 19-20, 2003 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument Flight Software Flight.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Secondary Boot Code (SBC) D.Wood Naval Research Laboratory.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
Accelerator Readiness Review October 31, 2006
Test Executive Trades (1)
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
Software and System Delivery
Electrical Ground Support Equipment Verification Test Support
GLAST Large Area Telescope:
EPU load – same as SIU load except…
Thermal Vacuum Test: Plans and Procedures
GLAST Large Area Telescope
Launch and On-orbit Checkout
LAT Operations Scenario Subsystem Meetings
GLAST Large Area Telescope
GLAST Large Area Telescope
PSS verification and validation
GLAST Large Area Telescope:
Presentation transcript:

GLAST Large Area Telescope Instrument to Spacecraft Interface Simulator (ISIS) Test Readiness Review 15 December 2004 Jana Thayer Eric Hansen Stanford Linear Accelerator Center (650) (650) glast.slac.stanford.edu/Elec_DAQ/ELX_test/ content/isis_documentation.htm Gamma-ray Large Area Space Telescope

15 December 2004 ISIS Test Readiness Review 2 ISIS TRR - Agenda Overview Requirements Test Plan Tests Outstanding Issues Closure Plan Summary

15 December 2004 ISIS Test Readiness Review 3 ISIS Overview Overview –ISIS –Purpose –Schedule –Document Status Requirements Test Plan Tests Outstanding Issues Closure Plan Summary

15 December 2004 ISIS Test Readiness Review 4 ISIS Connections to SC Simulator: 1553, SSR, and Discretes Ethernet and Serial Connections Heater Loads Power feeds (SIU, PDU) PC running AstroRT Heater Controls Environmental Simulator PDU Load Box

15 December 2004 ISIS Test Readiness Review 5 Purpose ISIS –Assist the development of electrical interfaces and LAT- Spacecraft (SC) interaction –Provide a high-fidelity simulator of the primary-side LAT instrument –Present a flight-like hardware and FSW interface for testing and integration of the spacecraft Testing –Establish that it is safe to connect to the ISIS –Demonstrate that ISIS simulates the LAT effectively Power, loads, temperature/voltage monitoring LAT/SC interface (discretes, science data) Commands and telemetry

15 December 2004 ISIS Test Readiness Review 6 Schedule Test Readiness Review (TRR) - December 15 –Confirm readiness for Acceptance Testing Safe Connection Procedure (LAT-TD-03541) Acceptance Test Procedure (LAT-TD-05398) Close all required action items Acceptance Testing –Run Safe Connection Procedure - December 16 –Run Acceptance Test Procedure - January 7 Post Acceptance Test Review (PATR) –Held within 10 working days after last qualification test session –Confirm tests successfully completed (or specify what is required for completion) Delivery (ASAP after completion of acceptance tests)

15 December 2004 ISIS Test Readiness Review 7 Document Status

15 December 2004 ISIS Test Readiness Review 8 Requirements 1553 Bus Communication/LAT Telemetry –Alert Telemetry –Spacecraft Commands –Routing of Commands –No-op Commands/Counting of No-op Commands –Ancillary Commands/Counting Ancillary Commands –Attitude Commands/Counting of Attitude Commands –Time Tone Commands/Counting of Time Tone Commands –Automatic Repoint Requests –GRB Signals Discrete Control –Output Discrete Lines –Input Discrete Lines –Reset Signal Science Data Interface –Hardware Interface –Science Data Patterns –Science Data Rate –Science Packet Length –Transmission Duration CPU Boot Process Power –Power Control/Power Draw –Analog Temperatures/Voltages

15 December 2004 ISIS Test Readiness Review 9 Test Plan Overview Requirements Test Plan –Roles and Responsibilities –Test Execution –Configuration Management –Approach to Testing Tests Outstanding Issues Closure Plan Summary

15 December 2004 ISIS Test Readiness Review 10 Roles and Responsibilities

15 December 2004 ISIS Test Readiness Review 11 Test Execution Safe Connection Procedure – Dec. 16 –Test Director – Eric Hansen –Test Conductor – Jana Thayer –Quality Assurance Engineer - ? Acceptance Test Procedure – Jan. 6 –Test Director SW tests – Jana Thayer HW tests – Eric Hansen –Test Conductor SW tests – Eric Hansen HW tests – Jana Thayer –Quality Assurance Engineer - ?

15 December 2004 ISIS Test Readiness Review 12 Configuration Management Hardware –Hardware database used to keep track of units/versions All hardware units are assigned a GLAT# (bar coded) GLAT# recorded in LAT-DS –Each FPGA also has unique VHDL# (stored electronically) HW version info available in diagnostic telemetry packet FSW –CMX –SW configuration info available in diagnostic telemetry packet Test scripts –CVS (CVSROOT = /afs/slac/g/glast/flight/fsw_test/ISIS) Documents –LATDocs

15 December 2004 ISIS Test Readiness Review 13 Approach to Testing Hardware –Each package has been unit tested prior to delivery –Mechanically, electronically, and for functionality FSW –Each package has been unit tested prior to delivery ISIS integration –ISIS hardware and software integrated since –Commissioning and debugging of HW/SW ongoing –Routinely used as test bench by FSW and FSW test Acceptance Tests – Perl scripts utilize AstroRT interface Send commands to ISIS Receive telemetry from ISIS Toggle discrete lines using SDIS

15 December 2004 ISIS Test Readiness Review 14 Tests Overview Requirements Test Plan Tests –Test Environment –Safe Connection –AstroRT –Verification Matrix Outstanding Issues Closure Plan Summary

15 December 2004 ISIS Test Readiness Review 15 Test Environment

15 December 2004 ISIS Test Readiness Review 16 Safe Connection Every connector on front panel tested Four tests for each –Electrical Continuity Check, Power and Power-Return –Electrical Isolation Check, Power to Power-Return –Electrical Isolation, Signal Isolation from Power and Power- Return –Electrical Impedance, Signal-to-Signal (Resistance between Differential Pairs) Verifies –Can safely mate to connectors –All internal connections are good –Analog temperatures have correct values

15 December 2004 ISIS Test Readiness Review 17 AstroRT Test Script (AstroRT) Archive (Telemetry, Science) CVS AstroRT ISIS SC Simulator (using SDIS) SC FSW

15 December 2004 ISIS Test Readiness Review 18 Verification Matrix

15 December 2004 ISIS Test Readiness Review 19 Verification Matrix (continued)

15 December 2004 ISIS Test Readiness Review 20 Verification Matrix (continued)

15 December 2004 ISIS Test Readiness Review 21 Outstanding Issues Hardware –JL-2, pin 2 not connected One of 20 28V_HOT pins on redundant main feed Software –Upload ISIS FSW build to EEPROMs –Resolve occasional PCI master abort Test Scripts –Routing of commands –Ancillary, Attitude, and Time Tone Commands –Boot Process –Reset Signal Documentation –LAT-TD – ISIS Acceptance test procedure Waiting on remaining test scripts –LAT-TD – ISIS Safe Connection procedure Update GLAT# for heater load boxes –LAT-TD – ISIS Grounding diagram Add chassis ground Add temperature monitor panel ground

15 December 2004 ISIS Test Readiness Review 22 Closure Plan #Description of problemResponsible partyDue date 1JL-2, pin 2 not connectedPatrick Young Resolve PCI master abortSteve Mazzoni/Ed Bacho Upload ISIS FSW build*Tony Waite Test script: Routing of commandsEric Hansen Test script: Ancillary, Attitude and Time Tone Commands Eric Hansen Test script: Boot ProcessEric Hansen Test script: Reset SignalEric Hansen LAT-DS (Acceptance Test)**Jana Thayer/Susan Becker LAT-DS (Safe Connection)Jana Thayer/Susan Becker LAT-DS (Grounding diagram) Jana Thayer/Susan Becker * Closure depends on #2 (resolution of PCI master abort) ** Closure depends on #4 – #8 (test script completion) (SLAC has a two week shutdown: 12/18/04 – 1/2/05)

15 December 2004 ISIS Test Readiness Review 23 Summary On schedule to ship ISIS in the 1 st week of January Some minor issues to deal with affecting the following documents/items –Safe Connection Procedure - December 15 –Test scripts - December 17 –Update Acceptance Test Procedure - January 6 MILESTONES Acceptance Testing –Run Safe Connection Procedure - December 16 –Run Acceptance Test Procedure - January 7 Post Acceptance Test Review (PATR) –Confirm tests successfully completed (or specify what is required for completion) Delivery (ASAP after completion of acceptance tests) – 1 st week of January –After resolution of any required issues –ISIS shipped, accompanied by team from SLAC; training provided –Installed and verified with a subset of Acceptance Test –Settle on details after winter shutdown.