LBT Q2 2008 Eng/SW Review DIMM – Differential Image Motion Monitor.

Slides:



Advertisements
Similar presentations
Obtain 24/7 Powerful Asset and Connectivity Management Software for Enterprise Data Centers.
Advertisements

Server Technology Confidential Page 1, June 22,2009 Server Technology Global Services.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
TCS3 Conceptual Design Review 1 Aug 21, 2003 TCS3 Project Replacement of the Telescope Control System for the IRTF Conceptual Design Review Aug 2003.
1 Electrical and Computer Engineering Drebin Rescuing Firefighters in Distress FPR Team Ganz: Jonathan Bruso Michael Carney Daniel Fortin James Schafer.
DESIGN AND IMPLEMENTATION OF SOFTWARE COMPONENTS FOR A REMOTE LABORATORY J. Fernandez, J. Crespo, R. Barber, J. Carretero University Carlos III of Madrid.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
Team 7 / May 24, 2006 Web Based Automation & Security Client Capstone Design Advisor Prof. David Bourner Team Members Lloyd Emokpae (team Lead) Vikash.
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Improving Process for Better Software. Who We Are An experiential learning program that provides technology solutions for our partners, and real- world.
UPnP Device Management Andre Bottaro France Telecom Group UPnP DM co-chairman End User Device Management panel Sunday, January 11th, 2009 CCNC'09.
Darcy Bibb Oceanit Mentor: Tony Bartnicki Advisor: Curt Leonard Home Institution: Maui Community College Integration of a Small Telescope System for Space.
Mathew Watkins: Project Manger Larry Wu: Hardware Engineer Eric Robbins : Software Engineer Libby John: Systems Engineer Sponsor: Jeff Smith Advisor: Dr.
Cambodia-India Entrepreneurship Development Centre - : :.... :-:-
ISSAT “Telescope Alpha” Richard Berry Astronomical League.
Duties of a system administrator. A system administrator's responsibilities typically include:
P14215 AUTONOMOUS WANDERING AMBASSADOR What is the project about? The objective of this project is to modify a currently remote controlled robot so that.
Fundamentals of Networking Discovery 1, Chapter 2 Operating Systems.
Operating Systems Networking for Home and Small Businesses – Chapter 2 – Introduction To Networking.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
What is Next-Generation Disaster Recovery and Service Availability? Why do We Need it? Dan Smith Senior Manager, Solution Consulting and Engineering, GTSI.
The Evolution of Fleet Management How do you get device information now? Manually? Configuration pages?
Virtual Humanoid “Utsushiomi” Michihiko SHOJI Venture Business Laboratories, Yokohama National University
Fick Observatory - Boone, IA. Observatory Automation ongo02e March 26, 2002 Faculty advisor: Dr. John P. Basart Client: Joe Eitter ISU Physics Department.
Cullen College of Engineering RFID-Based Solutions for Piping Technology Piping Tech & UH July, 2007.
Computing on the Cloud Jason Detchevery March 4 th 2009.
End HomeWelcome! The Software Development Process.
Golf Swing Robot EE 486 Project Presentation College of Engineering and Technology Presented by Nasser Almarri.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
1 10/14/2015ã 2007, Spencer Rugaber The Waterfall Process Software plans and requirements Validation System feasibility Validation Product design Verification.
How to use Remote Desktop and Remote Support. What is remote desktop? Remotely control your computer from another office, from home, or while traveling.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
Hobby - Eberly Telescope MARS Software Design Review November 2002 Michael H. Ward Systems Analyst McDonald Observatory MHW 04-November
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
Software Status Sonja Vrcic Socorro,
1 Operations Objectives April 21, Q
A remote control robot with webcam. Responsibilities User Interface Communicate with server Webcam Display Server Web Server Collaborators Work: Harkins.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
ANKITHA CHOWDARY GARAPATI
Mobile Phone Based Environment Control/Security System Christopher Carroll B.E. Electronic and Computer Engineering.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
Core 3: Communication Systems. Network software includes the Network Operating Software (NOS) and also network based applications such as those running.
Guiding Control Subsystem (GCS) Overview
LBT Q Eng/SW Review MCSC – Mount Control System.
Roaming Security Robot Ruslan Masinjila Aida Militaru.
LBT Q Engineering Review Instrument Cooling.
Abstract A Structured Approach for Modular Design: A Plug and Play Middleware for Sensory Modules, Actuation Platforms, Task Descriptions and Implementations.
LBT Q Eng/SW Review SFWG – Software Group Norm Cushing.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
Status Report #4 LYRA The Remote Accessible Automated Camera Stand Developed by: Juan Cuellar, Nathan Dye, Timothy Hawley, & Matthew Hect October 8, 2012.
21 July 2008 LBT Q Eng/SW Review 1 SIN – Software Infrastructure Titus Purdin.
Mountaintop Software for the Dark Energy Camera Jon Thaler 1, T. Abbott 2, I. Karliner 1, T. Qian 1, K. Honscheid 3, W. Merritt 4, L. Buckley-Geer 4 1.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
LBT Q Engineering/Software Review ROTRotators.
A s s i g n m e n t W e e k 7 : T h e I n t e r n e t B Y : P a t r i c k O b i s p o.
2: Operating Systems Networking for Home & Small Business.
1 Sean Aluoto Anthony Keeley Eric Werner. 2 Project Plan Overview Project Lifecycle model Time line Deliverables Organization plan Risk management Design.
Project Paper Presentation Hanlin Wan March 15, 2011.
LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
OPERATES SCADA OPERATION SYSTEM Explain the operational SCADA
Business System Development
Multidisciplinary Senior Design I: Problem Definition Review
Radoslaw Jedynak, PhD Poland, Technical University of Radom
Texas Tech University Department of Physics and Astronomy
Status Report #5 LYRA The Remote Accessible Automated Camera Stand
Presentation transcript:

LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor

2 JKraus 21-Jul-2008LBT Q Eng/SW Review Highlights Johannes Schmidt, Max-Planck Institute for Astronomy, Physics thesis DIMM system designed, built, tested and installed Hardware: Robotic telescope mount for tracking Hartmann Mask Celestron 14” telescope and focuser CCD Camera Rack mount computer Software: CentOS GNU C++ Integration TCS GUI Prototype

3 JKraus 21-Jul-2008 LBT Q Eng/SW Review Progress Hardware DIMM hardware is mounted on the telescope, upper right, inside System Integration Fiber connection from DIMM to control server in lower treehouse DIMM server controls the hardware and communicates to a client running in Ptolemy Client communicates to TCS and reads data from the Data Dictionary TCS Data Dictionary Items defined and implemented Message string, Seeing number, Status, Time Operation Pointing of the mount A catalog of stars created for LBT for every sidereal hour Finds a star and tracks based on a mathematical model Calculates a “seeing” number Control remotely from control room

4 JKraus 21-Jul-2008LBT Q Eng/SW Review Open Issues Technical Writing data to TCS (Data Dictionary) Tracking Automatic operation Client side on Ptolemy may not be permanent home Data to Environmental GUI Bisque proprietary software Resource Only Johannes has experience running the software System needs more rigorous testing Need to define a path for maintenance and upgrades of hardware and software Documentation Code Completion Technical Reference Manual User Manual

5 JKraus 21-Jul-2008LBT Q Eng/SW Review Planning (Q3/2008) Writing data to Data Dictionary GUI Implementation for Observers Automation needs to be defined and tasked. Operators need experience using the DIMM Review Documentation

LBT Q Engineering Review 6 JKraus GUI Prototype 21-Jul-2008 Seeing Plot Status Message Memo Seeing Time Statistics