03-May-2007GIST 26: Abingdon GGSPS status Andy Smith RAL.

Slides:



Advertisements
Similar presentations
Academic Database at DMU. Outline History and Context Discussion Please ask questions as we go along.
Advertisements

1 MODAPS - Land Processing Status Robert Wolfe and Ed Masuoka Code 619, NASA GSFC Sadashiva Devadiga Sigma Space MODIS Science Team Meeting April 15-17,
GERB Operations: Status Report J. Rufus GIST 26 Coseners House, RAL. 3 rd May 2007 © Imperial College London.
GIST 19: GGSPS Planning GGSPS Development & Review Planning Andy Smith GGSPS software project manager.
Project Plan The Development Plan The project plan is one of the first formal documents produced by the project team. It describes  How the project will.
Plans for interim data release J E Russell (Imperial)
GERB2-GERB 1 transition: discussion item J E Russell Imperial College, London
ASPERA-3 April. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 4_25/ Page 1 Monthly Status Report Report due 4/25/01 Schedule statused.
What if you suspect a security incident or software vulnerability? What if you suspect a security incident at your site? DON’T PANIC Immediately inform:
AGATA Pre-processing team report AGATA Week, July 2008.
Network and Transfer WG Metrics Area Meeting Shawn McKee, Marian Babik Network and Transfer Metrics Kick-off Meeting 26 h November 2014.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.
Jean-Yves Nief CC-IN2P3, Lyon HEPiX-HEPNT, Fermilab October 22nd – 25th, 2002.
Level 1.5 Processing Issues Martin Bates RAL. Level 1.5 Processing Issues Geolocation –Current Status –TSOL Jitter (CSOL-TSOL) correction –Longterm TSOL.
Level 1.5 Processing Updates Martin Bates, RAL GIST th December, 2005.
© Imperial College LondonPage 1 Operations Report/ Operational Calibration Strategy GIST 19, RAL 28th August 2003 J A Hanafin.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 Commissioning update B.C.Stewart RAL.
Data Release Requirements, decisions and plans. What we need New machine Implement (and test) all proposed changes from current Provide data quality summary,
Cormac Neeson Space Engineering and Technology GERB Project Status 22/03/2004.
STEREO Science Center Status Report William Thompson NASA Goddard Space Flight Center STEREO SWG April 2008 Meudon, France.
GERB-2 V999 Unfiltering Nicolas Clerbaux & RMIB GERB Team. GIST 24, Imperial College, London 15 december 2005.
GIST May 2007 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-26 meeting.
February 5, 2009 Technical Advisory Committee Meeting Texas Nodal Program Implementation: Program Update Trip Doggett.
GIST 23 DWD, 27-29th Apr 2005 GGSPS development and operations Andy Smith RAL.
MSG, GERB calibration and data status May ‘07 J E Russell Imperial College, London
GIST th -16 th Dec B.Stewart RAL Mirror Anomaly Review Board Update.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
19th GIST 27 th -29 th August 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Battery issues Operations during eclipse Stray light NOT bearing life test.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
GIST October 2006 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-25 meeting.
1 TDTWG Update to RMS Tuesday February 3, Primary Activities Elections 2.ERCOT System Outages and Failures 3.MarkeTrak Performance 4.Discussed.
© Imperial College LondonPage 1 Calibration Commissioning Report GIST 19 RAL, 27th August 2003 GERB Instrument Team & Operations Team.
GIST-24 Meeting December MSG PROGRAMME STATUS Presentation to the GIST-24 meeting.
RMIB involvement in the Geostationary Earth Radiation Budget (GERB) and Climate Monitoring SAF projects Nicolas Clerbaux Remote sensing from Space Division.
Level 1.5 Geolocation Martin Bates, RAL GIST th December, 2005.
Request for Service (RFS) Process and Metrics Update June 24, 2008.
Geolocation Tuning and Status Geolocation Accuracy of Available Data Problems –E-W, N-S Centering –Discrepancies Comparing with RGP –Axis Misalignments.
Product status and timeline Andy Smith RAL. User products The GGSPS provides user access to the following products: Level 1.5 NANRG, ARG Level 2 ARG (and.
18 th GIST Meeting 14 th –16 th May 2003 Ground Segment (GGSPS) Report 1 GERB Ground Segment B.C.Stewart RAL.
Science Operation Readiness Review ICESat SIPS (I-SIPS) Status N0v 30, 2001 David Hancock ICESat Science Ground System Manager
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
GIST th -29 th Apr B.Stewart RAL In-orbit Mirror Performance.
2004/11/10GIST 22, Brussels, LMD, M. Viollier1 POLDER, CERES, GERB flux comparisons and information on AMMA and MeghaTropiques Michel Viollier Laboratoire.
CM-SAF Board Meeting, Helsinki, September 2006 CM-SAF TOA radiation status report D. Caprion Royal Meteorological Institute of Belgium.
CM-SAF Board Meeting, Offenbach, April 2006 CM-SAF TOA radiation status report D. Caprion Royal Meteorological Institute of Belgium.
SSC Support for Sim #3 Archived MOC Data Products, and distributed via web. –Level-0 telemetry files organized by year and month –SPICE orbit and attitude.
18th GIST 14 th -16 th May 2003 E Sawyer RAL Status of GERB1,2,3 and 4 Descan mirror bearing life tests Battery issues Operations during eclipse.
GIST, Boulder, 31/03/2004 RMIB GERB Processing: overview and status S. Dewitte Royal Meteorological Institute of Belgium.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
Level 1.5 Processing Updates Martin Bates, RAL GIST th April, 2005.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
GIST-19 Meeting August MSG-1 - PROGRAMME STATUS Presentation to the GIST-19 meeting.
15th CAA Cross-calibration workshop CIS archiving activities report University College of London 2012, April
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Status of Sentinel-3 activities at EUMETSAT SIT-31 Agenda Item # 13 ESA/ESRIN, Frascati, Italy 19 th -20 th April 2016 Committee on Earth Observation Satellites.
NOAA GPRC Report Fangfang Yu and Fred Wu 05 March 2012.
Market Trials Update NATF March 2,
Validation status overivew
Validation status overivew
16th CAA Cross-calibration Workshop
Cluster Active Archive – Wideband data BM2 mode
GSICS Coordination Center (GCC) Report
Solar Orbiter Instrument Testing by MOC-SOC
Rob Roebeling and Peter Miu
Rob Roebeling, Viju John, Frank Ruethrich, Tim Hewison EUMETSAT
Chapter 11 – Project Dashboard
Rob Roebeling and Peter Miu
GSICS Coordination Center (GCC) Report
TAG Agenda – April 6th 2006 Minutes from last TAG meeting – 13.45
XRN Nov 19 Release - Status Update
Presentation transcript:

03-May-2007GIST 26: Abingdon GGSPS status Andy Smith RAL

03-May-2007GIST 26: Abingdon Outline Edition 1 release and reprocessing Operations: GERB-1 and 2 archive stats, problems Progress on new development Future work

03-May-2007GIST 26: Abingdon Reprocessing & release Status at last GIST meeting: L2 ARG June 2006 to present released L1.5 NANRG reprocessing proceeding slowly Concerns about QA effort and delay to release

03-May-2007GIST 26: Abingdon Reprocessing & release Reprocessing L reprocessing & QA completed Jan 07 Met new timescale agreed at last GIST Release of the L1.5 NANRG Oct 2005 to present released Jan : rolling release – needs L1.5 geo data from RMIB L2 reprocessing “Wash-up” tasks: re-order of missed L0 data for to give more complete Edition 2 data set

03-May-2007GIST 26: Abingdon Edition 1 data available All L1.5 data reprocessed: 2 years’ data available 18 months’ L2 ARG data available for download ProductAvailableRemaining L2 ARG28-Mar – June Oct-2005 – (today – 40d) Oct 04 – Oct 05 L15 NANRG 16-Feb – June Oct-2005 – (today – 40d) Oct 04 – Oct 05

03-May-2007GIST 26: Abingdon Special data sets Excluded from Ed01, available separately via GGSPS web pages L2 ARG Feb-March 2004 (clear-sky warm-up) L th Feb 2004 (pre TSOL jitter) Both above include Ernesto’s Feb 04 validation period Ops team only: L2 solar eclipses March, Sept 2006 L2 data affected by counting data (several periods)

Ops: G2 archive stats Mon% L0% L0 normal % L1.5 Ed01 Outages Oct MSG off 14.6%, sunblock 16%, nightly sun avoidance Nov Data corruption 6%, ROM, stray light Dec Counting data x2 Jan Counting data x2 Feb Sun avoidance, leased line, stray light Mar Data corruption 8.8%, sun avoidance, auto-sunblock x4, sunblock during corrupt. Apr Leased line x2 6.5%, RAL power, sun av, auto-sunblock x4

03-May-2007GIST 26: Abingdon Ed01 data coverage Reduced Ed01 data coverage: Mirror events: counting data (~1 day) Direct stray light close to midnight (hours) High % of corrupt/missed packets (hrs/days) Quartz Filter anomaly (1 or 2 products) Mirror pointing anomaly (1 product) Sensor swaps (1 product) Products picked up in QA are “pulled” from Edition 1 (GERB-1 products not pulled – no data released)

03-May-2007GIST 26: Abingdon Ops: G1 archive stats Mon% L0% L0 Norm % L1.5Outages Oct61.90-Data corrupt 36.2%, ROM 1.7% Nov96.70-ROM 2.3%, EUM maintenance Dec95.00-PGS Antenna 4.97% Jan Feb SAFE after 12-Feb, leased line 1.5% (re-ordered since) Mar99.30-PGS antenna 0.7% Apr RAL power, leased line x2 >5%

03-May-2007GIST 26: Abingdon Ops: problems Problems affecting L0 data and NRT processing: Satellite off & instrument data corruption PGS antenna, EUM maintenance RAL power & local network RAL-EUMETSAT leased line –high impact, only partially under our control: –can be intermittent, packet %ages don’t reflect number of affected products –move to SFTP over internet may solve this (and may introduce new problems)

03-May-2007GIST 26: Abingdon Operations GERB-2 catalogue database L0 table large, performance problems Created difficulties in processing backlogs of data after outages Tables split into current/historic to reduce impact Software: Corrupt data and intermittent line breaks revealed new data handling bugs

03-May-2007GIST 26: Abingdon New development Oct - April Oct – Feb: reprocessing Feb – Apr: ongoing Release & (dual) Ops work… Initial planning of Linux port, bid submitted Ported system needed for GERB-3, but funding constraints may require work completed much sooner SFTP of L0 data from EUMETSAT to RAL TSOL jitter data in GERB packet

03-May-2007GIST 26: Abingdon Future work SFTP of L0 data & TSOL jitter data in GERB packet – ~4 months to complete Linux port: ~1 staff year Possible L1.5 processing improvements: MB talk Further product releases: L2 BARG etc Level 2 Monthly Means