WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT COOPERATION THE KEY TO SUCCESS.

Slides:



Advertisements
Similar presentations
TOTAL QUALITY MANAGEMENT (TQM) Increasing Productivity.
Advertisements

DAY ONE - STEP ONE - Preparation Pure Crete is added to a water truck with a spray bar located at the rear of the truck at a ratio of one gallon to 2000.
PUBLIC WORKS Pavement Preservation Program. 231 MILES TOTAL 184 MILES SURFACED 47 MILES GRAVEL Clatsop County Overview Three Districts: District 1 Astoria.
Teaming Up. Teams A group of people working together to accomplish a task.
2014 Chip Seal Training Contract Administration Issues.
Position Opening Page 1 Job Classification: Wash Plant Operator/Maintenance Opening Date: October 27, 2014 Location: 67 th Ave Closing Date: November 7,
BEST PRACTICE OPERATION OF HEAVY EQUIPMENT BEST PRACTICE TRAINING METHODS TO ACHIEVE SAFE OPERATION.
Counties33,12444%Paved16,03648% Federal21,90629%Gravel10,70032% Cities10,79914%Local Access6,38819% ODOT8,04911% Other State6141% Totals74,49333,124 Oregon.
Comal County Chip Sealing June 26, 2007.
2014 Chip Seal Training ODOT Specifications
Module 4-2 : Joint Sealing
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Chipseal Construction Section 37.2 Seal Coats.  Proper surface preparation  Use of right asphalt binder, asphaltic/polymer modified emulsion and clean.
Class 24 Case: Edgcomb Metals.
Position Opening Page 1 Job Classification: Mobile Equipment Operator I-II Opening Date: October 27, 2014 Location: 67th Ave Closing Date: November 7,
It’s Not My Job…..But It Is!. Asking the Hard Questions Have we become complacent? Have we sold NARFE as worthwhile to join? Does our structure encourage.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
YOUR GOVERNING BODY: EFFICIENT AND EFFECTIVE?
Pavement Maintenance II Part 1a: SurfaceTreatments Idaho Roads Scholar Program.
Project Work and Administration
FIRST Training Resource – Volunteers Lead Team Queuing Regional or Championship.
Chapter 7 Administration of the Fire Department
Trucking Logistics Trucking Logistics Route Optimization A Presentation By: Andy Anastasio Jr. on behalf of Gateway Community College.
CE 515 Railroad Engineering Unit-Train Operations Special Freight and Package Services Source: Armstrong Ch 14 & 16 “Transportation exists to conquer space.
AIR FORCE LEADERSHIP.
Miguel Martinez Tractor Trailer Driving. What they do?  Load and unload cargo  Drive long distances  Report to a dispatcher any incidents encountered.
Leadership Playbook. “I. “ TOGETHER EVERYONE ACHIEVES MORE” -----Author Unknown What Makes a Great Team? 1. Knowledge 2. Cooperation 3. Flexibility 4.
LHTAC1 LOCAL HIGHWAY JURISDICTION EFFICIENCY  Add Reporting/Performance measures to the Road and Street Finance Report  Undertake a study to evaluate.
Planning, First Aid and Working Conditions Section C of the Forest Activities Code.
 Describe TSS Classification Series  Key Points of TSS Concept  Describe Cross Bargaining  Describe How TSS is used in MnDOT District One ◦ Winter.
Preparing and Planning to Manage
Be more effective at “planning the work and working the plan” Project Management Tips.
Breakout Session # 807 Dolly Fernandez, Chief, Contracting Services Div Rodger Evans, Chief, Design & Construction Western Div National Park Service,
Colorado Rocky Mountain Chapter of Solid Waste Association of North America SWANA Annual Conference Friday, October 3, 2008.
Single Minute Exchange of Die OR Quick Changeover
Surface Treatment of Countyline Road Alachua County Board of County Commissioners September 23, 2008.
The Keys To Success In The Business World By: JFK-102B3W24 JFK-103B1W160.
Actual Costs to fix roads at Fort Peck Reservation 2008 National Tribal Transportation Conference November 12, 2008 Oklahoma City, OK.
Haul Truck Backs into T65 Dozer. Front view of Dozer 2.
Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance.
How to Find Funding and Plan for International Fieldwork April 8, 2005 Cynthia Buckley Center for Innovation, Creativity and Capital Dept. of Sociology.
AN INTRODUCTION Managing Change in Healthcare IT Implementations Sherrilynne Fuller, Center for Public Health Informatics School of Public Health, University.
General HP LaserJet/DeskJet Printer Maintenance Training 4 Provided by: 4 Ed Quillian 4 For: 4 Harris PC-Technicians, EIT Dept.
Free Space Optical Communications Senior Design Project Fall 2011 TEAM AWESOME.
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
TEAMING UP. TEAM A group of people working together to accomplish a task.
04/01/2016 The PGT program – how is it implemented? Supported by trained coaches and internal consultants Initiator Seminars Initiator Seminars meetings.
A REVOLUTION IN ROAD BUILDING
PROGRAM MANAGEMENT MODULE 2 Dr. Nicole Fitzhugh Professional School Counselor Berwyn Heights Elementary.
Loaders and Stagehands Guidelines for.  Complete UMP hiring paperwork  Complete Job Description / Qualifications form  Watch this presentation in its.
1 Emergency Preparedness for Utilities Presented by: Chris Saunders Team Manager, Annapolis Sewer Service Area Anne Arundel County Bureau of Utilities.
Work Zone Traffic Control Gravel Roads. Work Zone Traffic Control Gravel Roads Challenging Facilities to Complete WZTC on Typically are low to very low.
Local Distribution Site (LDS) Regional Distribution Site (RDS) County Drop Site (CDS) Staff Roles.
How to Run a Good Troop Meeting Troop 644 Marysville, OH.
MNM Fatal Powered Haulage Accident Powered Haulage Accident September 15, 2009 (Arkansas) September 15, 2009 (Arkansas) Sand & Gravel Operation.
Tehama County Public Works Department “ National Public Works Week” Board of Supervisors Presentation May 10, 2016 Gary B. Antone, PE, PLS Director.
Deschutes county road department otta seal gravel road conversion pilot project December 7, 2016 oaces chip seal workshop.
Leadership Play Book.
Social Media & Communications Lauren Taylor – Dardanelle High School
Oregon Mileage County Mileage
JACKSON COUNTY Chip Seal Program
CONSTRUCTION METHODS & TECHNOLOGY
WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT
Deep Crack Sealing with Chipseal
التدريب الرياضى إعداد الدكتور طارق صلاح.
The 11 Leadership Principles
SOFT SKILLS.
UTILIZING GRINDINGS ON RURAL ROADS:
DRIVERS ROLES AND RESPONSIBILITIES
CITY OF WINDOM POSITION DESCRIPTION Position Title:
Presentation transcript:

WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT COOPERATION THE KEY TO SUCCESS

COOPERATION Goals – Combine Linn County and Benton County into one chip seal team. – Share needed personnel and equipment. – Complete both county chip seal programs in a timely manner. – Gain experience and knowledge while accomplishing common goals.

Combining Forces Expectations – That the two counties would work in harmony. Respect for one another Respect each other’s equipment Open lines of communication Follow proper lines of authority

Personnel and Equipment Personnel – 35 people on Peoria Road Project (largest project) 23 Linn County 12 Benton County

2013 CHIP SEAL PROJECT

2013 CREW

Personnel and Equipment Equipment – 25 Pieces of equipment 17 Linn County 8 Benton County – 2 chip spreaders (one for backup) – 4 rollers (2 pneumatic, 2 steel drum) – 3 sweepers – 1 loader – 15 trucks

Peoria Road miles x 30 feet wide = 287,790 sq./yds. – To be chip sealed, swept, fog sealed, and center line striped in 5 days 16 super tankers of 32 tons per tanker 3.5 super tankers of CRS truck loads of 3/8”-#10 crushed rock – 1 truck loaded every 3.42 minutes (for 8 hours)

2013 CHIP SEAL SCHEDULE

The Way It Happened Day 1: Chip sealed 8.18 miles Day 2: Swept first half and chip sealed second half – 8.17 miles (Total miles) Day 3: Fog sealed first half while second half was being swept. Marked center line on first half. Day 4: Started moving equipment. Striped first half while second half was fog sealed and center line was marked behind fog seal. Day 5: Finished striping center line and fog lines.

How did it happen? The project was well planned The two crews became one team Everyone was well trained and professional Everyone gave 100% There were good lines of communication There were very few mechanical failures The contracted distributor drivers and delivery drivers did a good job The road was clean and properly prepared and we had clean rock and good emulsion

Summary The two crews became one team. Both counties had the personnel and equipment they needed for their projects. Both counties completed their projects on or ahead of time. Personnel were able to exchange ideas and experiences. The project was a complete success and we intend to work together again next year.