The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.

Slides:



Advertisements
Similar presentations
Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
Advertisements

Front end test stand — WP2
H – Ion Source Development at RAL & FNAL PASI Meeting, RAL 3 rd April 2013 Scott Lawrie & Dan Faircloth (RAL) Dan Bollinger (FNAL)
RAL Front End Test Stand Overview, Status and Plans RAL 12 th January 2005 Alan Letchford, ISIS Injector Group.
ISIS Accelerator Division
The RAL Front End Test Stand David Findlay ISIS Accelerator Division Rutherford Appleton Laboratory Oxfordshire, UK STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
Ion Source Development at RAL Dan Faircloth Including the work of: Scott Lawrie, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
H. Haseroth July 26 – August 1, 2004 NuFact04, Osaka 1 The 3 MeV H - Test Stand at CERN - The first part of the SPL - H. Haseroth on behalf of the SPL.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
Sensitivity Key parameters: ― Degree of matter-antimatter symmetry violation →  ― Degree of mixing e- and  -neutrinos →  13 Neutrino Factory has highest.
ISIS, FETS and ASTeC David Findlay Head, Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC ASTeC 10 Years On, Thursday 13 October.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
UKNF OsC RAL – 21 & 22 June 2010 UKNF achievements & milestones J. Pozimski.
Solid Target R&D Programme Colliding the proton beam with a dense target is currently the only known way to produce enough muons for the neutrino factory.
Proposal for the continuation of the Front End Test Stand Accelerator peer review panel August 2011 Alan Letchford STFC, Rutherford Appleton Lab. On behalf.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael. A. Clarke-Gayther RAL / ASTeC.
M. A. Clarke-Gayther RAL/FETS/HIPPI UK-NF 16 th September 2008 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
Recent FETS Ion Source Measurements UK Neutrino Factory Plenary Meeting 8-9 June 2010 Rutherford Appleton Laboratory Dan Faircloth Faircloth.
Proton driver front end test stand Plans and organisation for 2004–05 David Findlay ISIS Accelerator Division STVLTVS EST QVI ACCELERATORIBVS CVRANDIS.
Proton Driver Status ISIS Accelerator Division John Thomason.
M W PooleASTeC Ten Years On Origins of ASTeC Mike Poole Former ASTeC Director.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
1US-UK Workshop, Jan 12-14, 2012 Working Group 4 - High Power Proton Accelerators: Achievements and Plans for Second PASI Workshop John Thomason & Steve.
NuFACT06, Irvine 27. August 2006 The Front End Test Stand (FETS) is a collaborative project, between CCLRC (ISIS & ASTeC) and UK universities (Imperial.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
ISIS operational update David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory / STFC DL-RAL Joint Accelerator Workshop, RAL.
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Alexander Aleksandrov Oak Ridge National Laboratory
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
M. A. Clarke-GaytherRAL/ASTeC/HIPPI SPG development Beam Chopper R & D for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther RAL / ASTeC.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
Developments of the FETS Ion Source Scott Lawrie.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
WP4-CHOPPER coordinated by A. Lombardi HIPPI yearly meeting, sep28-sep COSENERS HOUSE- Abington Hosted by CCLRC.
3 MeV test stand measurement plans A. Lombardi for the LINAC4 team 10/01/2013BCC MeV test stand measurements1.
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
F DOE Annual Program Review High Intensity Neutrino Source R&D in the Meson Detector Building Bob Webber & Giorgio Apollinari September 26, 2007.
Layout of the Front-End Test Stand Ajit Kurup UK Neutrino Factory Meeting 12 th January 2005.
M. A. Clarke-GaytherRAL/FETS/HIPPICARE-07 October 30 th 2007 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
FETS-HIPSTER A High-Flux Proton Irradiation Facility Steve Roberts (University of Oxford) Chris Densham (RAL), Alan Letchford (RAL), Juergen Pozimski (Imperial.
The ISIS Facility John Thomason Synchrotron Group Leader ISIS Department Rutherford Appleton Laboratory / STFC (With thanks to David Findlay) Fermilab,
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS ORBIS TERRARVM RAL Front End Test Stand — Context David Findlay Accelerator Division ISIS Department Rutherford.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI ISIS Developments David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
Understanding Extraction And Beam Transport In The ISIS H - Ion Source D. C. Faircloth, A.P Letchford, C. Gabor, S. Lawrie M. O. Whitehead and T. Wood.
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
M. A. Clarke-GaytherRAL/FETS/HIPPICARE-07 October 30 th 2007 Beam Chopper Development for Next Generation High Power Proton Drivers Michael A. Clarke-Gayther.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
ISIS operational update
UK Neutrino Factory Conceptual Design
The RAL Front End Test Stand
The RAL Front End Test Stand
Laser-based Beam Diagnostics for the RAL Front End Test Stand
Emanuele (ESS), Alessandro (CERN), Mikel (Tekniker), Hayley (ISIS)
Status of the Front End Test Stand April 2007.
1- Short pulse neutron source
H- Ion Source Development
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Simon Jolly UKNFIC Meeting 25th April 2008
Presentation transcript:

The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s House, Abingdon, 28–30 September 2005

2 2 RAL Front End Test Stand (FETS) Part of CCLRC’s generic R&D programme on high power proton accelerators Specifically, demonstration of some key technologies for the front ends of Spallation neutron sources Neutrino factories Waste transmuters Tritium production Energy amplifier

3 3 FETS is a collaborative effort amongst CCLRC RAL ISIS CCLRC ASTeC Intense Beams Group Dept. Physics, Imperial College, London Dept. Physics, University of Warwick Promotion of accelerator science in UK universities

4 4 FETS collaborators John Back, Giulia Bellodi, Mike Clarke-Gayther, Dan Faircloth, Graham Gosling, Stephen Jolly, Ajit Kurup, Alan Letchford, Eddie McCarron, Ben Pine, Dan Ciprian Plostinar, Jürgen Pozimski, Peter Savage, Mark Whitehead, Trevor Wood

5 5 FETS funding CCLRC, through ASTeC ISIS and ASTeC staff + hardware PPARC, through ASTeC UK university staff CCLRC, through Infrastructure Fund Reconfiguration of test stand area EU, through HIPPI programme

6 6 RFQ Chopper FETS main components: High brightness H — ion source Magnetic LEBT High current, high duty factor RFQ Very high speed beam chopper Comprehensive diagnostics RFQ Chopper

Building R8 — being reconfigured for FETS

FETS builds on experience from ISIS RFQ test stand

11 FETS specification 60 mA H —, 2 ms, 50 pps 75 keV 3-solenoid LEBT 3 MeV, 324 MHz RFQ 2 ns chopping Comprehensive diagnostics Test stand in practice

12 H — surface Penning ion source 35 mA, 200 µs (ISIS)  60 – 70 mA, 1 – 2 ms Increase largely achieved Separate Penning field Thermal modelling Electromagnetic modelling Extensive experimental work on dedicated ion source development rig

Good extraction over 1.75 ms arc at 50 pps

15 3-solenoid magnetic LEBT Design proceeding well Beam chopper [Other talks]

16 RFQ — 3 MeV, 324 MHz Ready availability of Toshiba E3740A 3 MW pulsed klystron (J-PARC) Electromagnetic DTL quadrupoles

17 RFQ beam dynamics at 324 MHz encouraging 3 MeV, 4 metre design 95% transmission, 80 kV electrode voltage Low voltage design  4-rod type possible 4-rod and 4-vane designs being investigated

4-rod RFQ has at least one operational advantage

20 Diagnostics Full suite of diagnostics to maximise the experimental capabilities Beam currents Emittances Energy spectra (magnetic + gas scattering spectrometers) Non-destructive laser/optical Residual gas ion spectroscopy

21 Possible beam halo monitor? Activate scandium annulus? 45 Sc(p,n) 45 Ti E thresh 2.8 MeV, 45 Ti t ½ 3 hours, 85% β + decay Low background 2.5 mA mean, 10 —5 halo, 100 seconds → 30 Bq Sc melts 1540°C

22 Radiation shielding 60 mA, 2 ms, 50 pps, 3 MeV into copper  2 – 3 × neutrons/second  ~100 mSv/hour at 1 metre Say lose 3%  ~1 mSv/hour at 2 metres ~1 metre concrete  ~1 µSv/hour C (graphite) or Al(-Si alloy) for beam dump? C: 13 C(p,n) threshold 3.00 MeV ( 13 C (1.1%)); 10-minute 13 N from 12 C (p,γ) Al-Si: (p,n) > 5 MeV; no activity from (p,γ)

23 Conclusions RAL Front End Test Stand will make an important contribution to HPPA R&D Good progress from RAL/ISIS, ASTeC, Warwick and Imperial Builds on experience gained with ISIS RFQ pre-injector upgrade First LEBT beam anticipated for 2006