PETRA III, A New High Brilliant Light Source At DESY

Slides:



Advertisements
Similar presentations
Dr. Zafer Nergiz Nigde University THE STATUS OF TURKISH LIGHT SOURCE.
Advertisements

A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
K. Balewski (DESY)IWBS Conceptual Design of the PETRA III Orbit Feedback K. Balewski, H.T Duhme, J. Klute, I. Krouptchenkov, R. Neumann, G. K. Sahoo,
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
M. Bieler, M. Ebert, L. Fröhlich, J. Keil, J. Klute, G. Kube, G. K. Sahoo, R. Wanzenberg, DESY, Hamburg, Germany Abstract Acknowledgment Commissioning.
SESAME Synchrotron Light for Experimental Science and Applications in the Middle East JSPS Asien Science Seminar Synchrotron Radiation Science Dieter Einfeld.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Conventional Facilities Advisory Committee May 8 - 9, 2007 Satoshi Ozaki Director,
Technical Challenges and Concerns S. Sharma and R. Alforque, R. Beuman, C. Foerster, E. Haas, E. Hu, P. Montanez, P. Mortazavi, S. Pjerov, J. Skaritka,
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
E. Karantzoulis - BESSY, June Elettra2.0-The next generation Emanuel Karantzoulis Circumference m 12 fold symmetry Energy 2 (& 2.4 GeV.
Simulation and Experimental Results of SSRF Top-up Operation Haohu Li, Manzhou Zhang SSRF Top-up Workshop, Melbourne
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: Accelerator System Overview NSLS II Advisory Committees October 18/19, 2006 Satoshi Ozaki.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Insertion Devices: Wigglers and Undulators Session 6 Insertion Devices Group 11/1/12.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
1 BINP Tau-Charm Project 3 February 2010, KEK, Tsukuba E.Levichev For the BINP C-Tau team.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS II: the Accelerator System Briefing Experimental Facilities Advisory Committee May 10, 2007 Satoshi Ozaki Director,
Accelerator Vacuum Systems at DESY M.Seidel, DESY Workshop on Vacuum Systems of Synchrotron Light Sources Barcelona,
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
PEP-X Ultra Low Emittance Storage Ring Design at SLAC Lattice Design and Optimization Min-Huey Wang SLAC National Accelerator Laboratory With contributions.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
PETRA III - Betrieb 2015 | July, 2015 | 1 PDE Magnet PETRA III. PETRA III Team DESY Meeting mit MEA
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
ESLS-RF Trieste, September 29-30, Åke Andersson RF systems for the MAX IV rings Åke Andersson On behalf of the MAX-lab RF team.
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
Low Emittance Rings 2014 Workshop INFN-LNF, 18. September 2014 Low Emittance Studies at 3 GeV at PETRA III Joachim Keil DESY.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Observations of Electron Cloud Phenomena at PETRA III Presentation at the ECLOUD 2012 workshop Rainer Wanzenberg ECLOUD 2012 June 5-8, 2012 Hotel Hermitage.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation Status of the RF Systems and Taiwan Photon Source
Report Technical Director Storage-Ring-Installation Completed
Off-axis injection lattice design studies of HEPS storage ring
PETRA III at DESY Hamburg/Germany
PETRA III, Status and Upgrade
PETRA IV accelerator overview.
Diamond Light Source Status and Future Challanges
Orbit Control For Diamond Light Source
Test of Optical Stochastic Cooling in CESR
SLS-2 – Ugrade of the Swiss Light Source
Low Emittance Rings 2014 Workshop
PETRA III. Machine development Satellite bunch clearing
Coupling Correction at the Australian Synchrotron
Recent Studies of Injection System at
First Look at Nonlinear Dynamics in the Electron Collider Ring
The SPEAR3 Upgrade Project at SLAC
The SPEAR3 Upgrade Project at SLAC
PETRA IV Lattice Studies
An overview the ASTRID2 storage ring and its RF system
Positron vs. Electron Beam Behavior
CEPC Injector Damping Ring
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
Advanced Research Electron Accelerator Laboratory
Study on Emittance Reduction with a Robinson Wiggler in HEPS
M. E. Biagini, LNF-INFN SuperB IRC Meeting Frascati, Nov , 2007
Proposal for a CESR Damping Ring Test Facility
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

PETRA III, A New High Brilliant Light Source At DESY 30.09.2009 PETRA III Balewski - MPE 1

PETRA III Balewski - MPE Outline Objectives & Key parameters Conversion of PETRA II into PETRA III Commissioning Results Summary 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Projects & Plans XFEL VUV FEL DORIS III Laser Institute of Hamburg University PETRA III 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Parameters: circumference: 2304 m energy: 6 GeV emittance: 1 nmrad emittance coup.: 1% (10 pmrad!) current: 100 (200) mA # bunches 40 / 960 - straight sections: 9 - undulators: 14 undulator length: 2, 5, 10 (20) m supplement to X-FEL  cost effective! Cost effective; total budget 150 M€; reason for just 13 beam lines 30.09.2009 PETRA III Balewski - MPE

PETRA III Modernization & refurbishment New coils New cooling New power supplies, new control system, new vacuum system,... 30.09.2009 PETRA III Balewski - MPE

Installation in old octants Installation of refurbished dipoles Including vacuum chamber… Installation of new water pipes Installation of Quadrupoles, Sextupoles & Vacuum chambers Start: 19.11 … Installation finished middle of 2008 19 juli tunnel leer; 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Layout of the new hall At the outer perimeter preparation labs and infrastructure installations are foreseen PETRA III will provide 9 straight sections for insertion devices. 5 of them will be equipped with 2 canted undulators each, resulting in 14 independent beamlines The ring tunnel and the experimental floor are founded on a 1 m thick slab of concrete to minimize vibrations. For vibrational decoupling, the builiding superstructere rests on 20 m long sleeved piles 20 m deep 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE New Experimental Hall 30.09.2009 PETRA III Balewski - MPE

Building of the concrete slab PETRA III Balewski - MPE 30.09.2009 PETRA III Balewski - MPE 9

PETRA III Balewski - MPE New Experimental Hall Middle of 2007 … Middle of 2008 … 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE PETRA III new experimental hall # undulators: 5 x 2m (canted) + 3 x 5 m + 1 x 10 m = 14 9 straights: 5 x 2 + 3 x 1 + 1 = 14 undulators angular offset: 5mrad undulator length: 2 times 2m beam separation at shielding wall: ~15cm  independent beam shutters and safety systems 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Aufbau DBA Zelle (# 8) Dipol girder (DTLU / DTRU) 2m Undulator (#10) Model Apple II Undulator L = 5 m Quadrupol Girder (QTLU / QTRU) 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Undulators Undulator PU 8 & 9 Undulator PU 10 8 of 14 Undulators have been installed 30.09.2009 PETRA III Balewski - MPE

Optics & experimental hutches 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE PETRA III: ex = 1 nmrad ex = 6 nmrad @ 6 GeV (PETRA II low emittance lattice) ex = 4.5 nmrad @ 6 GeV (PETRA II low emittance lattice & new octant) Possibilities: designing new optics with existing magnet hardware (TME) (B) designing new optics with new magnet hardware (FODO 90°shorter dipols) (C) designing new optics with existing magnet hardware and use of damping wigglers (A) 30.09.2009 PETRA III Balewski - MPE

PETRA III :damping wiggler ex: 4.5  1 nmrad Collaboration with BINP Damping wiggler sections Damping wigglers B = 1.5 T l = 0.2 m h = 0.025 m Ltot = 80 m (2x40m) 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Damping Wigglers End plate Pole Non-magnetic spacer Long. magnet Power pro Wiggler 40 kW für 200 mA 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Wiggler Section 440 kW @ 200 mA, ec=36 keV Opening angle: 5 mrad horizontal, 0.085 mrad vertical l= 4.5 m; P≈ 90 kW Power pro Wiggler 40 kW für 200 mA l= 0.8 m; P≈ 26 kW l= 6 m; P≈ 120 kW 30.09.2009 PETRA III Balewski - MPE

Damping Wiggler Sections PETRA III Balewski - MPE Both sections completely installed. All wigglers moved in Reguläre Zellen im Norden 30.09.2009 PETRA III Balewski - MPE

Damping Wiggler Sections PETRA III Balewski - MPE 4.5 m long Absorber 4.5 m long Absorber 6 m long Absorber 6 m long Absorber 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Transferline First beam through transferline on 24.03 Optics about correct, i.e. measured profiles agree with theoretical within 10% 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Stored beam Beam was stored on April 13 (one bunch with 20 µA i.e. about 109 e+) RF – phase right and orbit empirically corrected in the new octant First orbit measurement 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE First Light on April 30 First light on April 30: Undulator PU 9 (OL 142m) Single bunch 0.5 mA Gap closed to 10 mm (foreseen 9.5) No effect on machine (orbit / tune) Beam centred with horizontal and vertical Bumps Power up to 8W Screen monitor at 17.5 m Picture at screen monitor at 28 m With corrections Screen monitor at 28m 30.09.2009 PETRA III Balewski - MPE

PETRA III current limitations Multibunch instabilities are a problem: Situation PETRA II longitudinal horizontal vertical Ithres (mA) 7 6 1/t (Hz) 35 50 60 Zeff 3.6 MΩ 45 MΩ/m 54 MΩ/m PETRA III: 12 instead of 16 cav. & larger long. (radiation) damping → powerful broadband (BW≥ 60MHz) feedback neccessary 30.09.2009 PETRA III Balewski - MPE

Status Multibunch Feedback Installation complete Electronics housed in special climatized huts PETRA II MB-Feedback reinstalled to ease commisioning Feedback hut Hall east old Feedback kicker Cavities for longitudinal feedback new Feedback kicker Timing System 30.09.2009 PETRA III Balewski - MPE

Current limitations multibunch Design: 100 mA 70 bunches: 67 mA 960 bunches: 60 mA 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE emittance gefittete horizontale Strahlfleckgroesse: 42.7mu (1sigma-Breite) Annahme: - beta_x = 1.6m - Dx = 1.3cm - Delta(p)/p = 1.3E-3 => emittanz_x = 0.96 nm rad (GROBABSCHAETZUNG) lousy lifetime for I = 1.4 mA => t = 1.5h 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Orbit stability goal ex = 1nmrad coupling 1% Low  insertion High  insertion (m) (m) Amplification factor Horizontal 1.19 34.6 17.25 19.84 141 70.24 Vertical 4.0 6.3 34.08 2.37 4.9 26.20 Stab. Requirement 0.1 * σ →Sub micron orbit stability !! ESRF: 10 µm hor. and 3 µm vert. 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Status orbit feedback air coils installed in tunnel installation of electronics in climatized huts Klimatisierte hütten 30.09.2009 PETRA III Balewski - MPE

Orbit stability (preliminary results) Micrometer scale!! Feedback off on 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Summary Parameter Design Achieved Energy (GeV) 6 ex (nm rad) 1 ey (pm rad) 10 < 50 Current (mA) 100 67 Orbit stability 10% of beam size Work in progress # undulators 14 8 10 more weeks for commissioning until December 21-st User operation starting in February next year 30.09.2009 PETRA III Balewski - MPE

PETRA III Balewski - MPE Thank you for your Attention! 30.09.2009 PETRA III Balewski - MPE