TD Help for Shutdown 2015 Preliminary, will be updated July 6, 2015 – October 5, 2015.

Slides:



Advertisements
Similar presentations
Door Guards Generally speaking … Know the building floor plan, what areas are public and what areas are not. Know the building floor plan, what areas.
Advertisements

How To Use The Podium Touch Panel. Volume Up Volume Down Volume Mute Microphone On/Off Power Off / Exit The touch panel can operate by touching anywhere.
Lock Out Tag Out UNIVERSITY of N ORTHERN C OLORADO.
Total Loss Monitor Report All experimenters meeting 5/12/14 A. Leveling.
Main Injector Gap clearing kickers Phil Adamson (#) AEM 14th March 2011.
Proton Source Workshop Booster Downtime Wednesday, December 8, 2010 T. Sullivan.
ODH Fans and Work Planning Protecting Against the Big Event 10 Questions Before Starting a Job at C-AD Photo of the Week Collider-Accelerator Department.
Lock-Out/Tag-out.  What is lock-out/tag-out (LOTO)?  The proper procedure for installing locks and tags.  The proper procedure for removing locks and.
Take 5 for Safety Conduct of Operations – Control of Equipment and
Session04: Business Writing Dr. Mark H. Mortensen Sections 211 and 212 M & W2:00 to 3:15 3:30 to 4:45 Manning School of Business.
The Menstrual Cycle Dave Crowley, 2007.
Lockout Tagout Tryout (LOTO). The purpose of the Lockout Tagout Program is to protect you. Rain for Rent incidents include employees being sprayed with.
Chapter 5: The Organization of Congress.  Both the House and the Senate depend on committees  Thousands of bills proposed each session.  Important.
1 Stony Brook Update: T.K. Hemmick for the Tent Crew.
Trindel Insurance Fund
LOCKOUT TAGOUT (LOTO) Awareness Training Program 1 Updated 6/29/04 by SN.
Control of Hazardous Energy (Lockout/Tagout) 29 CFR
Welcome Stephen Spencer; CEMP Director of Safety Emergency Manager Wilson County Schools
PIP Update Aug 6 th Agenda Summary Update – Current Activities/Updates – New Tuner Test Result: Reid & Slabaugh – Anode Supplies: Crawford.
FREEDOM 2 LEARN LAPTOP USE WITH CLASS. WELCOME TO LAPTOP 101  Here’s what you need to know to use the laptops with your class. Please follow the instructions.
Shutdown 2012 ES&H Friday April 27, 2012J. Anderson Jr. Page 1 Draft Schedule Beam off to Experiments 0000 Monday April 30 th Linac continues operations.
09/28/07Shutdown’07 Week 8 F.G. Garcia1 MTA beam line installation Weekly Report September 28, 2007 Period covered: September 24 th September 28 th (Week.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
NUMI NuMI Internal Review July 12, 2001 Infrastructure: Radiation Safety Page 1 Technical Components NuMI Beamline Radiation Safety Issues Radiation Safety.
All Experimenters’ Meeting November 03, 2014 Photo by Greg Vogel.
All Experimenters’ Meeting February 09, Accelerator Operation Summary Calendar Week # 06 NuMI Weekly Integrated Intensity 6.69 E18 protons Beam.
How to be a Leader Harrison Huskies are learning to be leaders every day!
Shutdown Summer 10 4-week. Who Main Injector Duration Mike Frett/John Featherstone Remove Sand From MI40 penetrations Install when finished (PLUS) 4w.
Mechanical Integrity Training. Lesson Objectives  Describe MI Training Required  Describe How to Conduct Training  Describe Requirements for Maintaining.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Project Parkway Structure Goal 1: Increase Academic Achievement and Engagement for All Students Focus Area 1 Focus Area 2 Focus Area 3 Steering Committee.
Nature & Nurture Influencing operator retention..
08/31/07Shutdown’07 Week 4 F.G. Garcia1 MTA beam line installation Weekly Report August 31, 2007 Period covered: August 24 th to August 31 st (Week 4)
Bell Work In your opinion, what is the most difficult part of working in a group and why?
Lockout/tagout (LOTO) is a technique used to prevent energy from being released during the servicing of equipment. This is accomplished by placing locks.
TD Help for Shutdown 2012 Preliminary, will be updated April 18, 2012.
All Exp Mtg Apr 21, 2008 NuMI-MINOS Status Report – Alec Habig FAR DETECTOR: 99.7% live time (wall clock) 99.9% (pot weighted) Annual hoist inspection.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
EPICS EPICS Collaboration Meeting Argonne June 2006 IOC Redundancy: Redundancy Monitor Task EPICS Meeting - Redundancy Argonne, June 16, 2006 Matthias.
All Experimenters’ Meeting January 26, Accelerator Operation Summary Calendar Week # 03 NuMI Weekly Integrated Intensity 2.74 E18 protons Beam.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
2.1 Organizational Requirements Objectives Develop better understanding of what a successful organization expects from its workers Identify how motivation.
Friday July 27, 2007 Page 1 Shutdown 2007 ES&H Enclosure Access  Linac Remains Operational until August 13 th  Booster RWP’s and enclosure access keys.
All Experimenters’ Meeting October 20, 2014 Photo by Greg Vogel.
Karl Williams Mechanical Engineer AD/MS Fluids Group Absorber RAW Cooling Systems.
All Experimenters’ Meeting December 8, 2014 Photo by Greg Vogel.
Fermilab AD E/E Support Department Fermilab’s Experience in Applying OSHA and NFPA 70E Requirements in Accelerator Power Supply Systems NFPA 70E Standard.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
I Am Humberto Barrera. My Nice House I want a house that has 6 bedrooms,3 bathrooms,2 living rooms, and 1 garage I want a house that has 6 bedrooms,3.
MANAGING CONFLICT.
An introduction to… Lockout Tagout. Aim Every year thousands of workers get killed or injured while performing repairs or maintenance on industrial equipment.
Friday July 16, 2010 John Anderson Page 1 Shutdown 2010 ES&H Enclosure Access  Linac Remains on enclosure interlock key series. RWP’s in.
网上报账系统包括以下业务: 日常报销 差旅费报销 借款业务 1. 填写报销内容 2. 选择支付方式 (或冲销借款) 3. 提交预约单 4. 打印预约单并同分类粘 贴好的发票一起送至财务 处 预约报销步骤: 网上报账系统 薪酬发放管理系统 财务查询系统 1.
FESS - OPS SHUTDOWN UPDATE. ELECTRICAL Feeder 46A Cable tie in - COMP. A0,C0, E0 CRYO Transformers & Switchgear - Not Complete Master Substation - COMP.
09:00 Meeting Shutdown Update June 29 th 2015 Cons Gattuso AD Shutdown Manager.
PIP Shutdown Status 9/17/2014. RIL/Linac Jobs L1 Transformer ◦Rigging complete ◦Electrical work started ◦Turn on this coming weekend Laser notcher flange.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
PIP Update May Agenda Summary Update – Activities – Budget – Plans Update Slides – Solid StateTom – ModulatorsRene – High Power Ferrite Testing.
MI/RR Shutdown 2012 Dec Gev Lines/Injection region: Staging equipment, cleaning and prepping new part to start vacuum work. Preparing to modify the.
10/3/2014 Proton Source Update. RIL Update Source B is back in place and under vacuum It will be baked over the weekend It will be started early next.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Lock Out Tag Out (LOTO).
Better to Lockout/Tagout Than to Luck Out!
ASSIGNMENT NO.-2.
در تجزیه و تحلیل شغل باید به 3 سوال اساسی پاسخ دهیم Job analysis تعریف کارشکافی، مطالعه و ثبت جنبه های مشخص و اساسی هر یک از مشاغل عبارتست از مراحلی.
Batch Parties Changes.
Operations/Control room organization during commissioning
Around the room Orders of operations.
Implementing MIS & EBT Together The Vermont Decision
Laboratory Do’s and Don’ts
Presentation transcript:

TD Help for Shutdown 2015 Preliminary, will be updated July 6, 2015 – October 5, 2015

Who ~6 People from TD from July 6 th to October 5 th Most will work on TSP to IP project –One person assigned to LCW group

Who & What TSP2IP Mechanical ADSylejmani SaliCrew LeaderTSP2IP TDJohnson SeanMechanical TechnicianTSP2IPDrill Crew TDDormann PeterMechanical TechnicianTSP2IPChip inspector and cleaner TDKaminskas LarryMechanical TechnicianTSP2IPShielding and Stands TDJones RobertMechanical TechnicianTSP2IPShielding and Stands TDFlannigan TimothyMechanical TechnicianTSP2IPShielding and Stands LCW Support ADSlazyk RobertMechanical SupervisorAd Ops Maintenance TDOstrom WayneMechanicalTechnicianAd Ops Maintenance

Who Dave Augustine (ALL) Ext: 4451 Pager (630) Oliver Kiemschies (TD) Ext: 3925 Cell (630) Consolato Gattuso Ext: Bob Slazyk (LCW) Ext: 2422 Pager (630)

Where MI/RR for most work but all accelerators in access (eventually) There WILL be permanent shutdown keys (i.e. keys that you don’t have to turn in at the end of the day) for most Leaders will organize (more information later). Otherwise (however) keys will come from the MCR

Location of the MCR

Layout of MCR <- Keys MI & Booster LOTO -> <- NuMI LOTO Usually RWP’s are next where keys are. At the beginning of this shutdown, the RWP’s will be in the room next to the MCR, along with RSO’s

LOTO (will be job lock boxes)

When Meeting with Bill Dymond Wednesday Will find out from Bob Slazyk

Good Luck! Stay Safe! This presentation can be found at: