GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA.

Slides:



Advertisements
Similar presentations
© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
Advertisements

Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
GEO Work Plan Symposium 2011 Days 2 & 3 Presentation of ID-02 Catalyzing Resources for GEOSS Implementation for Plenary Session.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
© GEO Secretariat The Group on Earth Observations – Status and Post 2015 Osamu Ochiai GEO Secretariat 41 st CGMS Tsukuba, Japan 8-12 July 2013.
GEO Strategic Plan : Implementing GEOSS
The CEOS Constellations Status and Way Forward SIT September 2006.
Session 9. New activities André Obregón, Rapporteur GEO Work Plan Symposium Geneva, 5-7 May 2015.
© GEO Secretariat 2.4 Monitoring and Evaluation Activities Craig Larlee / John Adamec Co-Chairs, M&E Working Group GEO 2015 Work Plan Symposium 5—7 May.
Session 8. GEOSS requirements, functions, architecture Session Feedback Presenter: Max Craglia.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
2016 Transitional GEO Work Programme Discussion & CONSOLIDATION Session 10, 2015 GEO Work Plan Symposium Geneva, 7 May 2015 Alan Edwards (IPWG) Giovanni.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
Critical Role of ICT in Parliament Fulfill legislative, oversight, and representative responsibilities Achieve the goals of transparency, openness, accessibility,
GEO Strategic Plan : Implementing GEOSS AN UPDATE GEO WORK PLAN SYMPOSIUM 05 MAY 2015 GENEVA, SWITZERLAND.
Report of the Science and Technology Committee GEO Plenary VIII Istanbul, Turkey 16 November 2011.
6. Strategic Plan : Implementing GEOSS Validating the way forward: Review of feedback from Plenary.
6th GEO Capacity Building Committee Meeting Hanover, Germany 13 to 14 February 2008 CB-07-01a Marta ANGOLOTI INM Spain.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
GEO Strategic Plan : Implementing GEOSS and GEO Work Programme 2016 Report from GEO Workplan Symposium WGISS#39 TSUKUBA (JAPAN), MAY 2015.
GEO Implementation Plan 2025 Barbara Ryan & Espen Volden GEO Secretariat SIT Workshop Agenda Item 15 CEOS SIT Technical Workshop CNES, Montpellier, France.
7 th GEO Capacity Building Committee Meeting Tashkent, Uzbekistan 3-4 June 2008 CB-07-01a Task report Marta ANGOLOTI AEMET Spain.
THE GEO GLOBAL CAPACITY BUILDING SYMPOSIUM Seville (Spain) September 10 & 11, 2007.
© GEO Secretariat GEO Work Plan 2nd GEOSS Science and Technology Stakeholder Workshop "GEOSS: Supporting Science for the Millennium Development.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Plenary Discussion of Framework for Engagement GEO XI Plenary Geneva, November, 2014.
WGISS-39, Tsukuba, Japan, May 11-15, 2015 GEO Community Portals Ken McDonald/NOAA CWIC Session, WGISS–39 May 13, 2015.
CEO Team SEO SIT Technical Workshop 25 – Agenda #16 EUMETSAT 17 th to 18 th September 2015 Committee on Earth Observation Satellites CEOS in the future.
GEOSS Mid-Term Evaluation Detailed Framework. Issues with Plan Clear Direction on Scoping Data Issues- Made explicit so as not to raise expectations or.
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
GEO Strategic Plan : Implementing GEOSS IMPLEMENTATION PLAN WORKING GROUP GEO EXECUTIVE COMMITTEE MARCH 2015 GENEVA, SWITZERLAND.
ST-09-01: Catalyzing Research and Development (R&D) Funding for GEOSS Florence Béroud, EC Jérome Bequignon, ESA Kathy Fontaine, US ST Kick-off Meeting.
Slide: 1 CEOS SIT Technical Workshop |Caltech, Pasadena, California, USA| September 2013 CEOS Work Plan Section 6.1 G Dyke CEOS ad hoc Working Group.
M ODULE 6 PART 1: Planning and Stakeholder Management GLOBAL FUND GRANT CONSOLIDATION WORKSHOP DATE.
Committee on Earth Observation Satellites Ivan Petiteville, ESA Plenary Agenda Item # th CEOS Plenary Kyoto International Conference Center Kyoto,
WGISS Response to CEOS Actions Assigned to WGISS Richard Moreno CNES – WGISS chair WGISS-40 Harwell – United Kingdom 28 th September 2015 Committee on.
Report of the 6 th GEOSS Evaluation Presentation to GEO-XII 11 November 2015 John Adamec Co-Chair GEO Monitoring & Evaluation Working Group.
GEO Summit 2015 Ministers engagement. Discussion document.
Committee on Earth Observation Satellites CEO Team 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015 CEOS and GEO.
GEO Implementation Boards Considerations and Lessons Learned (Document 8) Max Craglia (EC) Co-chair of the Infrastructure Implementation Board (IIB) On.
HUMANITARIAN RESPONSE MONITORING. HOW TO USE THIS PRESENTATION This presentation contains a complete overview of all aspects of Response Monitoring Presenting.
Committee on Earth Observation Satellites CEO Team Plenary Agenda Item #13b 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6.
GEO Engagement with Stakeholders Update to GEO-XII Plenary GEO-XII Plenary November 2015 Mexico City, Mexico.
GEO Implementation Mechanisms Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
IFLA: International Advocacy Programme. Address the information gap of library workers at community, national and regional levels Build capacity among.
GEO 2016 Work Programme Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
WP6 – Monitoring and Evaluation 17th November 2014 Rome.
Reporting, Monitoring and Evaluation Giovanni Rum, Chao Xing GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Work Plan Work Plan Management (Document 21)
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
GEO Strategic Plan : Implementing GEOSS Douglas Cripe GEO Work Programme Symposium 2-4 May 2016, Geneva.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
GEO Programme Board Status and key messages Tim Haigh Programme Board co-chair.
Reporting, Monitoring and Evaluation
Foundational Task prioritization: Outcomes of PB meeting
4th Assessment of Progress Against the GEOSS 2015 Strategic Targets
Summary of the Outcomes of the 1st AfriGEOSS Steering Committee Meeting Humbulani Mudau DST, South Africa 1st AfriGEOSS Symposium 27 – 29 April 2016.
Giovanni Rum, GEO Secretariat GEO Work Programme Symposium
Summary GEOSS Subgroup Teleconference
Subgroup 2 - Foundational Tasks structure review and recommendations for the WP Francisco Chavez (POGO, lead), Ivan Petiteville (CEOS), David.
Programme Board 6th Meeting May 2017 Craig Larlee
GEOSS Data Sharing Principles
GEO Programme Board Report
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Oceans and Society: Blue Planet
Overview of working draft v. 29 January 2018
Presentation transcript:

GEO Work Programme 2016 WGISS#40 HARWELL (UKSA) 28 SEP - 02 OCT 2015 MIRKO ALBANI, ESA

GEO Work Programme Framework

Work Programme Structure 1.GEO Foundational Tasks 2.GEO Flagships 3.GEO Initiatives 4.GEO Community activities 5.Resources summary Implementation Mechanisms

GEO Work Programme - Implementation mechanisms (1) GEO Community Activities : allow stakeholders to cooperate flexibly in a bottom-up fashion and with a low initiation cost. GEO Community Activities may define user needs, explore or demonstrate technical possibilities or agree on specific protocols. GEO Initiatives : develop and implement prototype services according to GEO priorities. They allow Members and Participating Organizations to coordinate their actions and contributions towards a common objective within an agreed, yet flexible framework. GEO Initiatives may, for example, demonstrate the technical feasibility through pilot products or consolidate a user need.

GEO Work Programme - Implementation mechanisms (2) GEO Flagships: develop and implement pilot or pre-operational services according to GEO priorities. They allow Members and Participating Organizations to spin- up an operational service serving common needs. GEO Flagships may operate for as long as they are able to generate sufficient impact to attract support for their activities. Once they reach a mature, operational stage, they may be taken up by user institutions (e.g. GEO Participating Organizations), for their continued operation over the long term. GEO Foundational Tasks: enable GEO to implement selected, often enabling, tasks to achieve GEO Strategic Objectives and Targets. These include coordination actions, gap analyses, the implementation of technical elements for accessing GEOSS, and other routine operations of the GEO Secretariat.

GEO Work Programme - Deadlines August 24-31Finalize version v3 August 31Version 3.0 of Work Programme, send out to GEO Principals for review and confirmation of contributions (DEADLINE FOR REPLIES: 23 September) August 31 – September 20 Actively seeking lacking contributions for FT; Actively seeking additional contributions for Flagships / Initiatives Sept. 20 – 29Finalize version v4 September 29Distribute Version 4.0 of Work Programme, as a GEO-XII Plenary document; Until November 11Continue actively seeking contributions.

GEO Foundational Tasks Implements or supports GEO Core Function Clear relevance to Strategic Objectives Detailed description in Work Programme Resourced from GEO Trust Fund, Member- or PO- commitments Central to GEO‘s own activities Usually strong GEOSEC role Often in the „Advocate“ or „Engage“ Area of Action.  GEO Portal, Data Sharing Principles, Frequency Protection, …

GEO Foundational Tasks - GEOSS Development & CGI Ops

GEO Foundational Tasks - Community Development & Secretariat Ops

GEO Flagships Substantial, mature activity of global or regional scope; Aims to provide information service or product pre-operationally or as pilot; Flagship Implementation Plan Multi-national stakeholder group; Alignment with political priorities; Clear relevance to GEO’s Strategic Objectives.  GFOI, GEO-GLAM, GEO-BoN, …

GEO Flagships

GEO Initiatives Activity of global or regional scope; Aims to develop or demonstrate prototype information service or product; Implementation Plan, Multi-national stakeholder group, Clear relevance to GEO’s Strategic Objectives  Blue Planet, Cold Regions, Great Lakes, …

GEO Initiatives

GEO Community Activities Objective shared by a group of interested partners, Multi-national stakeholder group or scope, Relevance to GEO’s Strategic Objectives  Global Land Cover, Urban Observations, EO for Mineral Resources, …

GEO Community Activities

Key differences: Purpose FlagshipPilot or pre-operational service (common GEO priority) InitiativePrototype service (common GEO priority) Community Activity Test or demonstrate applications (shared interest of specific community Foundational Task Implement selected, often enabling functions

Key differences: Originator FlagshipMembers, Participating Organizations InitiativeMembers, Participating Organizations Community Activity GEO Community Foundational Task GEOSEC

Key differences: Steering and oversight FlagshipDedicated Steering Board InitiativeDedicated Steering Board Community Activity Foundational Task GEO Programme Board

Key differences: Reporting to GEO FlagshipCoordinator InitiativeCoordinator Community Activity GEOSEC to best knowledge Foundational Task GEOSEC Mandatory Contributions to GEO Activities Report

Work Programmes Generally 3-year Work Programmes Work Programme 2016 (transitional) Work Programme Work Programme Work Programme

WGISS Contribution to GEO Workplan 2016 Actions: 1)Review GEO 2016 workplan activities to identify possible contributions from WGISS (e.g. Data Stewardship Best Practices, Data Discovery/Access systems, Technology, Water Portal, etc) –Target Date Mid October 2)Define contributions (schedule, effort, etc) and inform GEO Secretariat for updating Workplan –Target date End October, TBC with Osamu

What‘s new? GEO Work PlanGEO Work Programme Overview on ongoing activities Report on progress and plans Presents planned actions for adoption by Task and componentsby Implementation Mechanism GEO CommunityMember/PO interest, requirements for achieving GEO Targets, community wisdom List of Task participantsSpecified contributions by Plenaryby Plenary following Programme Board recommendation Prepared by GEOSEC community poll Prepared by GEOSEC with GEO Programme Board Nature Input Commitment Acceptance Process Structure