Project Information Meeting / Open House Wednesday, September 17, :00 – 8:00 PM Agenda 6:00 to 6:30 View Project Displays 6:30 – Presentation and Q&A 1 Project Team Julie Campero, Project Management Nicholas Grgich, Design Brianna Ceglia, Environmental Planning Connie Ganong, Biology Dennis Calloway, Landscape Architecture RocQuel Johnson, Public Information
Project Purpose Repair slide to prevent further damage to roadway. 2 Project Scope Construct a 186-foot long, 14-foot tall retaining wall. Construct a concrete barrier to replace guardrail. Reconstruct damaged shoulder pavement. Replace light pole and drainage system.
Project Location 3
Typical Cross Section 4
Project Layout 5
Simulations – View From Mattis Ct. 6
Planting Plan 7
Biology – Protecting Species Resource Agency Consultation Alameda Whipsnake California Red-Legged Frog Nesting birds Preparing Contract Document Prior to Construction Start During Construction 8
Project Schedule and Cost Begin Construction and Tree Removal: Late 2015 End Construction: Late 2016 Plant Establishment: 1 year after construction Construction Cost: $5.1 million 9
Public Outreach Website Stakeholder Notices US Postal Mail Notices RocQuel Johnson, Caltrans District 4 Public Information Office
11 Questions?
SR 13 Projects 12