Dataset Usability IMC Annual Meeting 2011, EIMC
NIS Time Line IMC Annual Meeting 2011, EIMC
EML Congruency Checker Version 0.1 Checks: 1. Data URL is valid 2. Display data from the URL 3. Database table can be generated 4. Data can be loaded into the database table 5. Compare number of rows loaded to number specified in metadata
IMC Annual Meeting 2011, EIMC PASTA Ready? Data can be read and processed automatically from its EML Metadata
IMC Annual Meeting 2011, EIMC PASTA Ready? Error-free Metadata-data congruence Complete Metadata Error-free data PASTA ready ? 2011: any EML data package
Error-free Metadata-data congruence Complete Metadata Error-free data PASTA ready ? 2014PASTA production system 2012PASTA functional prototype 2011First checks of congruence <=2011Any EML data package Synthesis: QA/QC, Std Attributes, Units Evaluation: Abstract, Methods Discovery: Keywords, Coverage Checks must be defined case-by- case First: Structural Second: Scientific
IMC Annual Meeting 2011, EIMC ECC v0.1 – Behavior Error-free Metadata- data congruence Error- free data ECC V0.1
ECC v0.1 – Current Capability IMC Annual Meeting 2011, EIMC
ECC v0.1 – Results Summary IMC Annual Meeting 2011, EIMC
ECC v0.1 – Summary 2 IMC Annual Meeting 2011, EIMC
ECC v0.1 – Summary 3 IMC Annual Meeting 2011, EIMC
IMC to do... IMC Annual Meeting 2011, EIMC Metadata Upgrade to EML 2.1 URL delivers only data (e.g., no HTML) “Physical” metadata are correct (delimiters, header/footer lines, missing value codes) ?? standardize our EML ?? Data No jagged tables Data typed as described
Breakouts – choose 1 Creating workflow-aware datasets (Wade) Uses and policies for reports (Margaret) EML dataset clinic - reports, fixes and examples (Gastil)
ECC v0.2 Plans IMC Annual Meeting 2011, EIMC
SynthesisQA/QC Std Attributes Units EvaluationAbstract Methods DiscoveryKeywords Coverage 2014PASTA production system 2012PASTA functional prototype 2011First checks of congruence <=2011Any EML data package