Dennis Glass Compliance Analyst III January 21, 2016 PRC-005-6 Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Talk with.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Underfrequency Load Shedding Report
Selecting the Right Network Access Protection (NAP) Architecture Infrastructure Planning and Design Published: June 2008 Updated: November 2011.
Keshav Sarin Manager, Compliance Risk Analysis
Account Opening. Introduction Process of opening accounts still very similar Disclosure statement required Written approval/disapproval.
Transition from Q1- 8th to Q1- 9th edition
CIP Cyber Security – Security Management Controls
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Planning for Certification in Plan your project In this presentation we present the tasks that must be completed in order to achieve certification.
Project Cyber Security Order 706 January 10, 2012 Most of the material presented has been compiled from NERC webinars and drafting team meetings.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
WECC and NERC Protection Criteria and Standards
Reliability Standards Update
Software Compliance: Are we there yet? Looking back and moving forward.
Audit & Compliance Tips Jagan Mandavilli Senior Compliance Engineer.
COMPLYING WITH HIPAA BUSINESS ASSOCIATE REQUIREMENTS Quick, Cost Effective Solutions for HIPAA Compliance: Business Associate Agreements.
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
Selecting the Right Network Access Protection Architecture
1 Arizona Corporation Commission BTA Workshop Presenter: Steven Cobb May 23, 2008.
ISO 14001:2004, Environmental Management System
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
Primacy Revision Application The Arsenic Rule. Major Points Components of Primacy Revision Application Attorney General’s Statement Special Primacy Requirements.
April 23 rd OWG UFLS Survey & Power Factor Review.
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Assessing Compliance. 2 NERC Compliance Workshop 11/02/07 Documentation of Compliance with NERC Reliability Standards Jeff Whitmer.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
1 Texas Regional Entity 2008 Budget Update May 16, 2007.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed draft.
SCFAH r1 Title: Working Draft “Ad-Hoc Recommendation to SC on 3GPP2 Future” Source: 3GPP2 Future Ad Hoc Abstract: This is the draft baseline.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
Maintaining Network Health. Active Directory Certificate Services Public Key Infrastructure (PKI) Provides assurance that you are communicating with the.
System Analysis (Part 3) System Control and Review System Maintenance.
Reliability Assurance Initiative (RAI) 101 Ben Christensen Senior Compliance Risk Analyst, Cyber Security.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
Date CIP Standards Update Chris Humphreys Texas RE CIP Compliance.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
This presentation remains the property of The Pensions Regulator. The content of these slides should not be reproduced without express permission. Automatic.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
By: Texas RE Enforcement April 25, 2013 Guidance on Requirements for PRC-005 Mitigation Plans Talk with Texas RE April 25, 2013.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
Lead from the front Texas Nodal 1 Registration Market Call Mar 27, 2009.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
NERC Project PRC-005 FERC Order No. 803 Directive ​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
NERC Standards Update Colleen Frosch ROS Meeting January 7, 2016.
2011 ReliabilityFirst 693 Compliance Audit Process for 6 Year Audit Cycle Entities Glenn Kaht Senior Consultant - Compliance ReliabilityFirst Corporation.
SCFAH Title: Draft Baseline Ad-Hoc Recommendation to SC on 3GPP2 Future ver2 Source: J. Brownley, Ad-Hoc Chair Abstract: This is a proposed.
State of Georgia Release Management Training
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
DEVELOPMENT OF UNIFORM CONTRACTING AND PROCUREMENT POLICIES  Procurement Reform Task Force Recommendation #7  Approach  Key Initiatives  “Go Forward”
Transition Plan Network Operations Model Change Requests 5/26/2010.
TRANSMISSION & INTERCONNECTION PLANNING T&D BUSINESS UNIT 1 Directional Overcurrent Relay Specification WECC TSS January 23,2013 Amos Ang.
Here you will find information about the requirements and due dates for our semester-long online portfolio project. Online Portfolio Assignment Sheet You.
R equirements of I SO There are eight clauses in ISO 9001:2000.  Clause 1- Scope  Clause 2- normative reference  Clause 3 – Terms and definitions.
New Mexico’s Nonpoint Source Management Program and Plan Revision.
Remedial Action Scheme Workshop RAS Workshop May 9, 2016.
Extended Reserve Technical Requirements Schedule (TRS) Presenters: Justin Blass, Project Manager Gillian Rodger, Power System Analysis Kevin Wronski, Compliance.
NOGRR-169 OWG discussion Bill Blevins June 28, 2017.
PRESENTATION TO THE PORTFOLIO COMMITTEE
Standards Subject to Future Enforcement 2017
PRC Implementation Plan and Summary of Devices
Renting Homes (Wales) Act 2016
Water Quality Credit Trading
Strategic Alternatives and Contingency Planning
EMA Board Nominations.
Compliance of Voluntary Organisations
Coordinate Operations Standard
Compliance of Voluntary Organisations
Presentation transcript:

Dennis Glass Compliance Analyst III January 21, 2016 PRC Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance Talk with Texas RE January 21, 2016

2 Effective Date Talk with Texas RE January 21, 2016 Enforcement Date of Standard: January 1, 2016

3 Key Changes Talk with Texas RE January 21, 2016 Nine changes from PRC to PRC-005-6: Requirements now apply to BES dispersed power producing resources Special Protection System and SPS now Remedial Action Scheme and RAS Automatic Reclosing now included in maintenance programs Sudden Pressure Relaying now included in maintenance programs Added supervisory relays, voltage sensing devices, and associated control circuitry to Automatic Reclosing

4 Implementation Plan – Overview Talk with Texas RE January 21, 2016 The PRC Implementation Plan addresses: The implementation of changes relating to maintenance and testing of Automatic Reclosing and Sudden Pressure Relay devices The phased implementation approach included in PRC ‐ 005 ‐ 2 will remain as ‐ is and is carried forward and incorporated by reference This implementation plan replaces all previous PRC-005 implementation plans PRC ‐ 005 ‐ 2(i) will remain in effect until entities are required to be compliant with R1, R2, and R5 of PRC ‐ 005 ‐ 6 under this implementation plan

5 Implementation Plan – Considerations Talk with Texas RE January 21, 2016 The Implementation Plan considers the following: PRC ‐ 005 ‐ 6 establishes minimum maintenance activities and maximum allowable maintenance intervals for Protection System, Automatic Reclosing, and Sudden Pressure Relaying Components The maintenance activities may not be presently performed by some registered entities and the established maximum allowable intervals may be shorter than those currently in use by some entities The implementation schedule carries forward and incorporates by reference the implementation schedules contained in all previous PRC-005 implementation schedules

6 Implementation Plan – General Talk with Texas RE January 21, 2016 General Considerations: Each entity shall maintain documentation to demonstrate compliance with PRC ‐ 005 ‐ 1.1b, PRC ‐ 008 ‐ 0, PRC ‐ 011 ‐ 0, and PRC ‐ 017 ‐ 0 until that entity meets all of the requirements of PRC ‐ 005 ‐ 6 in accordance with this implementation plan Each registered entity must be prepared to identify whether its applicable Protection System, Automatic Reclosing, and Sudden Pressure Relaying Components were last maintained according to PRC ‐ 005 ‐ 6, or PRC ‐ 005 ‐ 1.1b, PRC ‐ 008 ‐ 0, PRC ‐ 011 ‐ 0, PRC ‐ 017 ‐ 0, or a combination thereof  Complete the PRC-005 Spreadsheet Template that is provided with the engagement notification package

7 Resources Talk with Texas RE January 21, 2016 FAQ, plans, timelines, and reference documents: PRC Implementation Plan  PRC R3 and R4 Implementation Timelines  PRC Supplementary Reference and FAQ  plementary_Reference_clean_ _2.pdf plementary_Reference_clean_ _2.pdf PRC-005-2(i) Implementation Plan (Update)  PRC Implementation Plan 

8 Questions? Talk with Texas RE January 21, 2016