Ageing tests of VCSELs in non-hermetic 85/85 condition Ageing tests of VCSELs in non-hermetic 85/85 condition S. Hou, 2014/08/26 Academia Sinica.

Slides:



Advertisements
Similar presentations
PHOTONIS USA Resistive Glass Capillary Inlet Tubes
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
IEEE10/NSS R. Kass N A. Adair, W. Fernando, K.K. Gan, H.P. Kagan, R.D. Kass, H. Merritt, J. Moore, A. Nagarkar, S. Smith, M. Strang The Ohio State.
sTGC for ATLAS Small Wheel upgrade
Dielectro-Rheological Device (DRD)
VERTEX 2002 Experience with Parallel Optical Link for the CDF Silicon Detector S. Hou for the DOIM group Academia Sinica, Taiwan.
University of Pennsylvania Basic Electronics Things to be covered: What is electricity Voltage, Current, Resistance Ohm’s Law Capacitors, Inductors Semiconductors.
Studies of Small Scintillating Cells with Modified Geometries Alexander Dyshkant for NICADD at NIU.
Die Attach Process Development Using B-stageable Epoxies Elgin F Bravo May 11th 2001 Advisors Dr. R. Chung Randall Walberg SJSU NSC.
Embedded Programming and Robotics Lesson 8 Light Sensors and Temperature/Humidity Light Sensors1.
Chapter 1 Quick review over Electronics and Electric Components Prepared By : Elec Solv.
VCSEL Failures in ATLAS T. Flick, University of Wuppertal TWEPP 2010 Aachen,
SCANNER THOUGHTS AND DESIGNS NN Group Dmitriy Beznosko| Stony Brook.
Comparison of Field Emission Behaviors of Graphite, Vitreous Carbon and Diamond Powders S. H. Lee, K. R. Lee, K. Y. Eun Thin Film Technology Research Center,
DPF 2013 R. Kass 1 P. Buchholz, M. Ziolkowski Universität Siegen OUTLINE Lessons learned… IBL/nSQP opto-board overview assembly experience radiation hardness.
R. KassIEEE05/Puerto Rico N Radiation-Hard Optical Link for the ATLAS Pixel Detector Richard Kass The Ohio State University W. Fernando, K.K. Gan,
Superconducting Cavities Development at Fermi National Accelerator Laboratory Dmitri Denisov DIET Federation Roundtable, Washington DC, April
Current ILC work at Fermilab Electrical Engineering Dept.
DOIM Parallel Optical Link s: TX/RX S. Hou, R.S. Lu 19-Dec-2003, Lake Geneva.
in non-hermetic 85/85 condition
19 Oct NIKHEF update 3 lines of attack: 1)Heating (Mod 30) 3 days at 45 C, 4 days at 48 C Q1: Change in geometry, gas tightness, gain? Q2: Effect.
FPIX_flip_chip_test module calibration tests November 14 th 2012.
Measuring the Current and Voltage of a 820 Ω Resistor Setting for Multimeter = 200 mA DC Measure Voltage in 2 V increments up to 20 V.
Temperature dependence of sensor leakage current Contents Introduction Measurement Result Summary Junkichi Asai (RIKEN BNL Research Center) (Hiroki kanoh.
Michal Szelezniak – LBL-IPHC meeting – 3-5 October 2007 MimoStar2 Current test results at LBL Update on recent tests of MimoStar2 sensors performed at.
JPL’s Commercial Off-The-Shelf (COTS) Program
S.Hou, Academia Sinica Taiwan. 2Outline Optical links for ATLAS Laser-driver  fiber  PIN-driver LHC modules in service Rad-hard requirement for LHC/SLHC.
Ray Thompson Manchester Xmas Meeting 20/21 Dec 06 Ray Thompson, Julian Freeston, Andy Elvin WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise.
Ray Thompson Calice meeting UCL 6 Mar 06 WP4 aims: look at Mechanical/Thermal/ Assembly issues effort weighted to latter end of period Glue Assembly WP4.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
GEM Industrialisation Plans with Korea CMS Minkyoo Choi, Inkyu Park, Minsang Ryu Univ. of Seoul Hyunsoo Kim Chonbuk National Univ.
AOC Performance Death rates – Channel distribution & FEA Decrease in optical power with time Summary.
Sils ATLAS Meeting 18-9 October 2003 Mechanics for the Barrel SCT.
SCT/Pixel Off-detector VCSELs
Ray Thompson Calice meeting Mar 07 Ray Thompson WP4 aims: look at Mechanical/Thermal/ Assembly issues Utilise Atlas SCT experience effort weighted to latter.
Honeywell Advanced Photonics Development Overview ATLAS Meeting January 7, 1999 John Lehman Honeywell Technology Center
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
University of Pennsylvania Basic Electronics Things to be covered: What is electricity Voltage, Current, Resistance Ohm’s Law Capacitors, Inductors Semiconductors.
New Small Wheel muon trigger optical module New Small Wheel muon trigger optical module S. Hou 2014/08/29 Academia Sinica.
22 Aug Ageing studies: the Miracle HV training.
PIN current degradation Versus 3 MeV proton fluence 3 MeV proton (a)(b) (c)(d) Study of radiation damage in VCSELs and PINs for the optical links of the.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
1 Preparation to test the Versatile Link in a point to point configuration 1.Versatile Link WP 1.1: test the Versatile Link in a point to point (p2p) configuration.
Cesar Lugo November 7, 2002 Progress Report (October , 2002) Observed how the eye diagram was affected by changing the bias current of the VCSEL.
Vacuum Studies of LHCb Vertex Locator Sensors Gwenaëlle Lefeuvre, Ray Mountain, Marina Artuso Department of Physics, Syracuse University Abstract : The.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
AIDA 1 Mezzanine board Resistors and capacitors near the ASiCs have now been relocated to the underside of the PCB. Cooling pads have been extended.
Mathias Reinecke CALICE week - Manchester Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
Radiation hardness of the 1550 nm edge emitting laser for the optical links of the CDF silicon tracker S. Hou 15-Jun-2004.
High-speed Light Peak optical link for high energy applications
Practical advices for using TCT (mostly for Particulars setups)
LL133RR1-64P1-OY1 Technical data sheet Supplier : LG Display, Ltd.
sTGC Router Optical Transceiver options
LL078RS1-64P1-OY1 Technical data sheet Supplier : LG Display, Ltd.
Date of download: 10/17/2017 Copyright © ASME. All rights reserved.
LL178RS1-63P1-OY1 Technical data sheet Supplier : LG Display, Ltd.
ob-fpc: Flexible printed circuits for the alice tracker
CYRIC beam Line (actual setup)
LL081RR1-63P1-OY1 Technical data sheet Supplier : LG Display, Ltd.
FNAL Production Experience
VCSEL drivers in ATLAS Optical links
Sensor probing (Summary)
Passitivation Location
MEG II実験 液体キセノン検出器の建設状況
Presentation transcript:

Ageing tests of VCSELs in non-hermetic 85/85 condition Ageing tests of VCSELs in non-hermetic 85/85 condition S. Hou, 2014/08/26 Academia Sinica

2 Sample preparation −VCSELs of various manufacturers Die/Wire bonds by FOCI robot VCSEL dies on an 10×10 cm 2 PCB −TOSA of TrueLight assembled on PCB, no latch assembly

3 Bare Die VCSEL, forward bias uniformity −Multimeter P/N voltage

4 DC light power measurements −V-I-L scan by a LabView setup VCSELs covered by a large (10 × 10 mm 2 ) GaAs PIN, Mechanical alignment is required NI 6024E PCMCIA to an XP notebook −Power meter measurement

5 DC bias to VCSELS −DC bias by Agilent E3631A, Keithley 2304A current kept at ~ 5 mA/ch −Bias at 1.65 V, 1.75 V, 2.0 V, to VCSELs channel current measured, bundled.

6 DC bias current uniformity

7 85/85 chamber −Temperature stable at 0.1 o C −Humidity stable at 0.2% RH −Cooled to 30/55 before opening, to prevent condensation Burn periods conducted 30/50 : 118 hrs 85/85 : 12 hrs 85/85 : 94 hrs 85/85 : 275 hrs 85/85 : 316 hrs 85/85 : 363 hrs Continuing..

8 Reference samples −Not in oven, to examine the systematics of DAQ −Join afterwards, DAQ with test samples 1F45 1F59 1F58

9 Reference samples −Not in oven, to examine the systematics of DAQ −Join afterwards, DAQ with test samples 1F45 1F59 1F58

10 Reference samples −FINISAR Gb −board 2, two 4x1 arrays VCSELS are not centered at PIN Mechanical alignment is an issue

11 TOSA samples are robust in 85/85 TrueLight TOSA 1F Gb 1F58 10 Gb 1F59 10 Gb No obvious loss After ~700 hr 85/85 Bad electric contact Boards were poorly prepared, ch8 light recovered 1F45 1F58 1F59

12 Oxide 000, 008, 051 degradation TSD-000, after 10 ch lost 6, after ~400 85/85 ch closer to PIN center near PIN edge Not sure what cause degradation,, For channels near PIN center could be the PIN geometrical Not observed in other brands

13 Oxide 000, 008, 051 degradation TSD-008, after 10 ch lost 2, after ~ /85 ch closer to PIN center near PIN edge

14 Oxide 000, 008, 051 degradation TSD-051, after 10 ch lost 2, after ~ /85 ch closer to PIN center near PIN edge

15 Non-hermetic 751 degradation TSD-751, lost one ch in bonding? one more in early test? Total loss of 10 chs after /50 Very fragile Could ther be other damage mechanism?

16 Oclaro degradation Oclaro, badly degraded after /50 ch closer to PIN center near PIN edge

17 FINISAR array degradation Only 1 of 8, showing large degradation, the rest are consistent with small degradation, in /85

18 Avago degradation All 10 are consistent with small degradation, in /85 ch closer to PIN center near PIN edge