Nuclear Infrastructure Council Technical Meeting - February 10/11, 2016 Prof. Tim Abram Steve Threlfall.

Slides:



Advertisements
Similar presentations
BAE SYSTEMS - 21 Jan 04 Why Grid? Engineering New ways of doing business Business Enabling new business Product.
Advertisements

1 Proprietary and Confidential New Jersey Clean Air Council Public Hearing April 1, 2009 Jeff Halfinger Babcock & Wilcox.
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
1 KRB-A (Grundremmingen, Germany). 2 Type:Boiling Water Reactor Power: 250 MW(e) Started in 1966, shut down in 1977 First commercial power reactor in.
ASME SMR ROADMAP (STP-NU-072)
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
Construction Industry Efforts and Capabilities to Support PBES Deployment. William G. Duguay J.D. Abrams, L.P.
AREVA NP EUROTRANS WP1.5 Technical Meeting Task – ETD Safety approach Safety approach for EFIT: Deliverable 1.21 Stockholm, May Sophie.
EU Energy Strategy
Spent Nuclear Fuel Timothy Pairitz. Nuclear Power 101 Uranium-235 is enriched from 0.7% to 3-5%. Enriched fuel is converted to a uranium oxide powder.
1 | Program Name or Ancillary Texteere.energy.gov Offshore Wind Energy Overview Patrick Gilman Environmental & Siting Specialist Wind and Water Power Program.
United States-Canada Regulatory Cooperation Council United States-Canada Regulatory Cooperation Council January 30, 2012 Washington D.C
 A nuclear reactor produces and controls the release of energy from splitting the atoms of certain elements. In a nuclear power reactor, the energy released.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
1 © 2013 Westinghouse Electric Company LLC. All Rights Reserved Westinghouse Non-Proprietary Class 3 David Cliff UK Licensing Manager AP1000 Westinghouse.
BNFL/Westinghouse’s Perspective on the Nuclear Hydrogen Economy Dr PJA Howarth Head of Group Science Strategy.
“ Second Moscow International Nonproliferation Conference PLUTONIUM UTILIZATION IN REACTOR FUEL A. Zrodnikov Director General State Scientific Center of.
Can Egypt share the Construction of Power Reactors as Korea ?
PRESENTATION. INDUSTRIAL International Clients demand response and construction efficiency and are looking to review their business investments to give.
Journées "Ports & Environnement” Clean Energy Management in Ports EFFORTS results Le Havre – March 10th, 2010.
How they work and what happened at Fukushima Daiichi Plant.
Chapter 4 Nuclear Energy. Objectives Describe how nuclear fuel is produced. List the environmental concerns associated with nuclear power. Analyze the.
CANDU Fuel Options: Practical Adaptability Jerry Hopwood Vice President, Marketing & Product Development World Nuclear Association, Annual Symposium September.
1 The Future of Nuclear Energy Hydrogen and Electricity Production Charles W. Forsberg Oak Ridge National Laboratory Oak Ridge, Tennessee Tel: (865)
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Engineering Deans Institute 2015 The Future of Nuclear Energy Dr. Terry A. Michalske Laboratory Director April 13, 2015.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
Technologies of Climate Change Mitigation Climate Parliament Forum, May 26, 2011 Prof. Dr. Thomas Bruckner Institute for Infrastructure and Resources Management.
Overview of Distributed Generation Applications June 16, 2003 Harrisburg, PA Joel Bluestein Energy and Environmental Analysis, Inc.
4/2003 Rev 2 I.4.7 – slide 1 of 48 Session I.4.7 Part I Review of Fundamentals Module 4Sources of Radiation Session 7Nuclear Reactors IAEA Post Graduate.
Atoms for Peace +50 Andy White – President & CEO, GE Nuclear Energy.
Nuclear Fuel Cycle.  According to World Nuclear Association:  The nuclear fuel cycle is the series of industrial processes which involve the production.
Standards: Paving the way for innovation Glenn Tubrett Program Manager, Energy and Utilities Canadian Standards Association.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Reiner W. Kuhr Executive Consultant University of Calgary November 2, 2006 PBMR Oil Sands Applications.
© 2012 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
Physics Design of 600 MWth HTR & 5 MWth Nuclear Power Pack Brahmananda Chakraborty Bhabha Atomic Research Centre, India.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
1 Impact of Revised 10 CFR 50.46(b) ECCS Acceptance Criteria 2009 Regulatory Information Conference Rockville, MD March 12, 2009 Mitch Nissley Westinghouse.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
Natural Convection as a Passive Safety Design in Nuclear Reactors
Briefing on the Pebble Bed Modular Reactor Portfolio Committee on Public Enterprises 18 February Top Secret - 1.
I & C.
Nuclear Power Reactors
Teknologi Pusat Data 12 Data Center Site Infrastructure Tier Standard: Topology Ida Nurhaida, ST., MT. FASILKOM Teknik Informatika.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
U-Battery - A Local Modular Energy Source 26 January 2016 Paul Harding U-Battery.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
NEI SMR UK Summit 20 th October 2015 Paul Harding U-Battery.
LOW PRESSURE REACTORS. Muhammad Umair Bukhari
Heat Network Demonstration SBRI: policy context & objectives for the competition Natalie Miles Heat Strategy and Policy (Heat Networks)
Nuclear Battery Battery.  Reactor –Core Metallic fuel core (U-10%Zr) –Reactivity control Movable reflectors –Shutdown system Shutdown rod and reflectors.
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
DEVELOPMENT AND MAINTENANCE OF THE TECHNICAL AND SCIENTIFIC KNOWLEDGE BASE NECESSARY FOR TSO.
Technical External Management Requirements Technology Complexity Interfaces Reliability / Performance Quality Planning Controlling Funding / Resources.
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
Collaborative Research in
NEI Perspectives on Small Modular Reactors
Session Name: Lessons Learned from Mega Projects
Panel Session 3 Small Modular Reactors Chairman: Prof Johan Slabber.
GNI Advanced Reactors Safeguards Analysis & Findings
NuScale Micro-Reactor Technology
Small Modular Reactors: T’s & C’s
Presentation transcript:

Nuclear Infrastructure Council Technical Meeting - February 10/11, 2016 Prof. Tim Abram Steve Threlfall

2 The Energy Trilemma

U-Battery: Technology and Fuel Reactor Building footprint projected to be equivalent to penalty area on soccer pitch. TRISO fuel was first developed in the UK and has a long and successful history of development and deployment. Discussions have taken place with several international vendors including BWXT. TRISO fuel provides damage resistance to temperatures of 1600˚C – well above worse case scenarios. This fuel type is at a high level of Technology Readiness and underpins our safety case. 3 High Temperature Gas Reactor technology, with each reactor rated at 10MW(th) & 4MW(e). Up to 20% U-235 enriched accident tolerant TRISO fuel, embedded within Prismatic Block type fuel. Helium primary coolant transferring heat via intermediate heat exchanger to a nitrogen Closed Brayton Cycle secondary. Reactor outlet temperature of 750˚C. Cycle efficiency of >40% when producing electricity through gas turbine-alternator.

4 U-Battery: Inherently Safe U-Battery’s HTGR technology was selected based on its ability to deliver inherent safety and high fault tolerance, in line with the NRC’s Final Policy Statement on the Regulation of Advanced Reactors [1]. U-Battery’s safety features follow a tiered approach: 1)High negative temperature coefficient of reactivity, meaning the reactor will naturally shut itself down under even severe beyond-design-basis situations. 2)Retaining the highest risk to safety at its source, keeping fission products within the TRISO fuel due to resilience to beyond 1600˚C (unique to TRISO-fuelled HTGRs). 3)Entirely passive post-trip cooling, independent of coolant availability, even under LOCA conditions (a capability not available to LWRs). 4)Long system response times, simple system design, and a neutronically transparent single-phase coolant, requiring the minimum of operator input during normal and accident conditions. 5)Simple reactor and safety system design, using natural circulation to maintain acceptable temperatures during emergency conditions, through passively safe design. 6)Multiple barriers to radionuclide emission, including the multiple layers of the TRISO fuel, fuel location within a fuel element assembly, the primary circuit boundary, robustly protected reinforced concrete active cells, and the reactor building itself. [1] Nuclear Regulator Commission, 10 CFR Part 50, NRC–2008–0237, Policy Statement on the Regulation of Advanced Reactors

5 U-Battery: Designed Secure U-Battery is designed to be secure, and proliferation resistant, with the intention to have minimal-to- no on-site security requirements. This is based on several security and protection measures: 1)TRISO fuel is particularly proliferation resistant. Per Idaho Nuclear Laboratory: 2)Fuel handling, manipulation and removal is only possible using purpose built fuel handling equipment, none of which is stored permanently on-site. 3)Access to the areas containing used fuel is only possible via technically complex interface with through-pilecap plugs, requiring heavy specialist shielded equipment. 4)Access to the pilecap and active areas will only be possible via multiple physical barriers, with a range of access requirements potentially available, including remote authorisation. 5)No fresh fuel will be stored on site, with delivery occurring via the same secure means as the transport of any enriched nuclear fuels. “Because the fuel is very diluted by the fuel element graphite and because of the technical difficulty to retrieve materials from within the refractory fuel coatings, unirradiated TRISO fuel can provide a significant technical barrier to diversion…. Furthermore… the high burn-up of the TRISO used nuclear fuel make it particularly unsuitable for use in weapons.”

6 Technology Readiness Levels System Group Sub-System / Major EquipmentTRL Primary System Reactor Pressure VesselMedium Core Mechanical DesignLow Primary Gas DuctMedium Intermediate Heat ExchangerMedium Primary Gas CirculatorHigh Secondary System RecuperatorHigh Pre-CoolerHigh Power Conversion Systems Gas TurbineMedium Compressor(s)Medium Intercooler(s)High AlternatorHigh Start-Up MotorHigh Tertiary Systems Cooling Tower(s)High Tertiary Coolant PumpsHigh System Group Sub-SystemTRL Auxiliary Systems Ancillary Cooling SystemsMedium Coolant Make-Up SystemsMedium Building ServicesHigh Start-Up and Shutdown-SystemsHigh Fuel Route Systems Dry Store Cell(s)Medium Flasking FacilityMedium Fuelling MachineLow FlasksMedium Reactor and Control Rod Servicing EquipmentLow Control and Safety Systems Electronic Control SystemMedium Control Room and Control EquipmentMedium Fire Detection and Suppression (FDS) SystemsHigh Building Security SystemsHigh

It is anticipated that the tasks required to deliver U-Battery will dominantly involve the development and deployment of existing technologies. HTGRs have a long history, and several current technology demonstrations, and can be considered well-developed and of relatively high maturity. There are areas of low TRL, but overall: – Critical component TRL is strong (TRISO fuel, vessels, turbines). – The focus is on the application of engineering solutions, not original R&D. – Primary areas for development are core design, control systems, and fuel solutions. Currently completing Product Breakdown Structure and refining cost estimate. Establishing commercial off-the-shelf components, developing supply chain, and the critical developmental path. 7 Technology Readiness Levels

Leading Members Project Development Leading MembersSupporting Organisations

Phase to £16M. Basic design. Refinement of cost estimate. Preliminary regulatory submissions. Phases 2 and to £18M design and licensing. £100M hardware. Detailed design. Procurement and manufacture. Licensing application and approval. Construction, installation, testing, commissioning. Operation. 9 Phasing of Project

Work streamLead Partner 1. Security/Non-proliferation assurance.Amec Foster Wheeler 2. Fuel supply.URENCO 3. Fresh and spent fuel cartridge transport licensing.Atkins 4. Reactor design and fuel codes.Amec Foster Wheeler 5. Cost estimate confirmation.Amec Foster Wheeler 6. Spent fuel cartridge handling at installation.Cammell Laird 7. Spent fuel management strategy.NNL 8. Turbine/Generator set.Atkins 9. Gas/Gas heat exchanger.Amec Foster Wheeler 10. Building layout/modularisation/ constructability/integration/programme acceleration. Laing O’Rourke 10 Key Work Designated Leads

11 U-Battery as part of a balanced mix

12 The markets and applications vary by country. In UK and many other countries, the main market is for embedded generation at industrial sites, such as URENCO’s enrichment plant. Many sites can make use of the cogeneration capability. Such deployment avoids grid connection costs. In Canada, there are hundreds of remote communities that are not connected to a national grid where electricity would be produced. This is true, also, for many parts of the developing world where it would obviate the need to build a national grid. Elsewhere the application might be for desalination. In the nuclear industry, U-Batteries could be always on emergency generators for large nuclear power plants Projected Markets

13 U-Battery compares favourably to other low-carbon technologies and is lower than offshore wind in 2020

Potential Locations at Capenhurst

Licensing Design and Construction All small and micro-modular reactor vendors whether LWR or other technologies recognise the need for appropriate licensing. NRC’s progressive approach towards this will encourage vendors development efforts. The areas that U-Battery would benefit from a dialogue with regulators are: – how probabilistic safety targets are to be met. – views on safety and security when applied to micro-modular reactors, particularly around the issue of small staff complements and limited security presence. – Fuel cycle options – such as on-site or away-from-site spent fuel storage - will impact the final layout. – In order to address heat only, electricity only and co-generation options, it will be necessary to vary the secondary and tertiary circuits. It will be important to understand each regulators acceptance of these different configurations. 15

Conclusion Technology is deliverable – Development not Research. The market is there. Financing is simpler than large reactors because capital cost is lower and the construction period is much shorter. However, much of the competition is with diesel or CCGT so we create an organisation that allows customers to buy power. An appropriate licensing regime in individual countries is needed. The dream would be for international collaborative licensing, recognising work done in other jurisdictions with comparable safety standards. 16