LBT Q1 2007 Engineering Review HBSC Hydrostatic Bearing System.

Slides:



Advertisements
Similar presentations
F AST T RACK REMOTE SWITCH WIRING SET UP FOR THE LIGHT BoardPlug Power strips relay Wiring Harness.
Advertisements

LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
1 LBT Q Eng/SW Review SHTR: Shutters. 2 Highlights (Q1/2009) Shutters have been working well, generally Shutters have been working well, generally.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli, Chris Biddick.
CNG Refuelling station. A company located in Cherasco (Italy), is among the world leaders in the field of designing and manufacturing of components and.
19 May 2015 AirGuard Protection System Protection units for compressed air.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
ITE PC v4.0 Chapter 1 1 Operating Systems Computer Networks– 2.
Networked HVAC Controller Bradley University Department of Electrical & Computer Engineering By: Ed Siok Advisor: Dr. Malinowski.
Multiprocessing Memory Management
Next Home Remote Controlled Cliqueur troubleshooting guide Start the slide show then click Next.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
Pressure Switches. New modulating and multi-stage furnaces are more complex and require that installation instructions and procedures be followed so that.
Dynamic Online Restaurant System. Successful projects  Have a clear objective  Have a scope that fits the objective  Relates to the standard organization.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Kern.
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Eng/SW Review ROT - Rotators. 4-Apr-2008LBT Q Eng/SW Review Highlights First BG rotator installed First BG rotator installed BG cable.
LBT Q Engineering Review MCSC Mount Control System.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
EHN1 Extension – Overhead Cranes Renovation R. Rinaldesi – EN/HE 27/11/2014.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Engineering and Software Review ENGG Engineering General.
LBT Q Eng/SW Review IIF – Instrument Interface Jose Borelli.
LBT Q Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications.
1 LBT Q Engineering Review ICS – Instrument Cooling System.
TRENTON Casing Filler Presentation
A wind tunnel for kids… Status Update October 27, 2011.
1 LBT Q Eng/SW Review PVM: Preventive Maintenance.
LBT Q Eng/SW Review TERC Tertiary Mirror Units Commissioning.
LBT Q Eng/SW Review HBSC Hydrostatic Bearing System Sargent/Howard.
1 LBT Q Eng/SW Review PLMG: Plumbing. 2 Highlights (Q2/2008) Have recently replaced worn contactors in the Primary Loop chillers Have recently replaced.
LBT Q Eng/SW Review MCSC – Mount Control System.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
1 LBT Q Eng/SW Review ICS – Instrument Cooling System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Engineering Review MCSC Mount Control System.
LBT Q Eng/SW Review SHTRShutters/Seals/Mechanisms.
LBT Q Engineering Review SAB Static Balancing.
Hydraulics is defined as the study of fluid behavior, at rest and in motion Properly designed piping with sound hydraulics can: - Greatly reduce maintenance.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
LBT Q Eng/SW Review MCSC – Mount Control System.
September Information Technology Division BCP Presented By Roy Gregory IT Security Manager.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
BY: Winston G. Smith Environmental Engineer UST/PCB & OPA Enforcement & Compliance Section EPA Region 4.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
LBT Q Eng/SW Review CIN/NIN -Computer and Network Infrastructure.
LBT Q Eng/SW Review DIMM – Differential Image Motion Monitor.
LBT Q Engineering Review PMCD. 21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.
LBT Q Engineering Review DAQ. 19-Apr-2007LBT Q Engineering Review Housekeeping System Requirements Interface directly to the Agilent 34970A.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone March 28, 2016.
LBT Q Engineering Review HBSC Hydrostatic Bearing System.
Possible italian contributions to the IAXO telescope structure M.Riva.
LBT Q Engineering Review Swing Arms (SWA). 10-Jul-2007LBT Q Engineering Review Highlights (Q2/2007) The right secondary arm is wired and the.
LBT Q Engineering Review Primary Mirror Cells.
CRTNT testing equipments introduction
IBBelle: Status & Plans
ABT-EC EYETS Activities 2nd reports
PRESENTATION ON AUTOMATION,PLC AND SCADA
Sr no Content 1 Stop check valve definition 2 How does a stop check valve work? 3 Stop check valve 4 Check.
IBBelle: Status Commissioning at MPP Transport to KEK
Memory Management Tasks
DfX and DFMEA.
Presentation transcript:

LBT Q Engineering Review HBSC Hydrostatic Bearing System

13-Apr-2007LBT Q Engineering Review Highlights (Q1/2007) Capillaries installed on 4 lateral pads Capillaries installed on 4 lateral pads Flexible hoses (safety risk and stiffness reducer) partially eliminated on left-rear laterals Flexible hoses (safety risk and stiffness reducer) partially eliminated on left-rear laterals “Apparent” reduction at left-rear of telescope “Apparent” reduction at left-rear of telescope Pressure transducers being relocated to pads Pressure transducers being relocated to pads Initial measurements of lift, and C-ring runout completed Initial measurements of lift, and C-ring runout completed VoltsDC under contract and modifying code to correct stow-pin control VoltsDC under contract and modifying code to correct stow-pin control

13-Apr-2007LBT Q Engineering Review Radial Pad As Designed Modified

13-Apr-2007LBT Q Engineering Review

13-Apr-2007LBT Q Engineering Review

13-Apr-2007LBT Q Engineering Review Open Issues Technical Technical Control scheme not understood/unknown Control scheme not understood/unknown Schedule Schedule *Issue* or None *Issue* or None Financial Financial None None Resource Resource Mountain support pacing operation Mountain support pacing operation Luciano Miglietta not available for support Luciano Miglietta not available for support Network and Firewall communications issues unresolved Network and Firewall communications issues unresolved

13-Apr-2007LBT Q Engineering Review Progress (Q1/2007) Contracted with VoltsDC to modify PLC code and correct Stow Pin issues Contracted with VoltsDC to modify PLC code and correct Stow Pin issues Completed capillary installation of 2 more lateral pads Completed capillary installation of 2 more lateral pads Hardware and capillaries on hand for installation Hardware and capillaries on hand for installation Completed initial measurements of lift and jitter. Completed initial measurements of lift and jitter.

13-Apr-2007LBT Q Engineering Review Planning (Q2/2007) Continue capillary installation of laterals, followed by radials and azimuth Continue capillary installation of laterals, followed by radials and azimuth replace hoses with hard pipe replace hoses with hard pipe systematic measurement of lift systematic measurement of lift VoltsDC will install updated PLC code ~2 weeks. VoltsDC will install updated PLC code ~2 weeks.

13-Apr-2007LBT Q Engineering Review PLC Programming Goals Communication problem between LBTO computer and HBS-PLC Communication problem between LBTO computer and HBS-PLC Test and debug WinCC Engineering override code on LBTO Computer Test and debug WinCC Engineering override code on LBTO Computer Cannot read the status of the stow pins and stow pin proximity switches when in local or remote mode on the SCP. Cannot read the status of the stow pins and stow pin proximity switches when in local or remote mode on the SCP. PLC does not properly command the stow pins to move. PLC does not properly command the stow pins to move. PLC needs to ignore stow pin SCP commands when the SCP is in remote mode. PLC needs to ignore stow pin SCP commands when the SCP is in remote mode.

13-Apr-2007LBT Q Engineering Review Hydraulic Goals Cut the oil flow, cooling and power to the bearings by more than half. Cut the oil flow, cooling and power to the bearings by more than half. Improve the static stiffness of the bearings by at least 10% Improve the static stiffness of the bearings by at least 10% Reduce system pressure from 120 to 95 bar. Reduce system pressure from 120 to 95 bar. Improve the dynamic stiffness of the Lateral bearing by about 500%. Improve the dynamic stiffness of the Lateral bearing by about 500%. Moving the capillaries to the pad and resizing. Moving the capillaries to the pad and resizing. Eliminating the internal oil return groves. Eliminating the internal oil return groves. Relocating the return hole. Relocating the return hole.

13-Apr-2007LBT Q Engineering Review