Mod 133 - Entry Capacity Transfers Transmission Work Stream, 5 April 2007.

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Bid Bonds 23 January What is a Bid Bond? Stepping stone to full performance bond (or letters of credit). Value is based on cost of running the.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Entry Capacity Substitution Transmission Workstream – 6 th August 2009.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Moving the QSEC and AMSEC Auctions National Grid NTS, Transmission Workstream.
The Treatment of “Spare / Sterilised” Capacity – follow up Draft for discussion purposes only.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Transfer & Trades Special Transmission Workstream
RMTTSEC – Rolling Monthly Trade and Transfer System Entry Capacity Auction Transmission Workstream, 2 April 2009.
The Entry Capacity Transfer & Trade Methodology Statement Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
Transfer & Trades Special Transmission Workstream
Entry Capacity Substitution Workshop 7 – 10 th February 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Entry Capacity Substitution Workshop 9 – 7 th July 2009 DRAFT PRESENTATION.
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Classification: Statoil Internal Status: Draft Mod 156/156a Questions regarding the proposals…
Update on Entry Capacity Substitution Transmission Workstream 6 th March 2008 Summary of consultation responses.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Ofgem Open Letter – Next Steps Transmission Workstream
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Review of Entry Capacity and the Appropriate Allocation of Financial Risk Review Group th Sept 2008.
Moving the QSEC and AMSEC Auctions Update. 2  Presented proposal at October Workstream  Questions / suggestions received, mainly around  Over & Under.
Initial Thoughts on the Release of Non Obligated NTS System Entry Capacity Transmission Workstream 3 rd April 2008.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
September 2008 QSEC auction - Allocations Transmission Workstream
Entry Capacity Substitution Workshop 4 9 th July 2008 Entry Capacity Substitution Methodology Statement: Discussion Paper.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Assignment of NTS Entry Capacity – Questions relating to High level Business Rules Assignment Workstream, 7th April 2009.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Assignment of NTS Entry Capacity Review Group 221, 10th December 2008.
Transfers and Trades Special Transmission Workstream
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Entry Capacity Overrun price calculation
Transmission Workstream, 01 October 2009
Non-approved draft Transmission Workstream, 6th December 2007
Transmission Workgroup 4th October 2012
Introduction of Code Contingency Guidelines Document
Transmission Workstream, 2nd March 06
Removal of a Users ability to allow Quarterly NTS Entry Capacity to lapse Chris Shanley.
Capacity Methodology Statements: Impact of Mod 452
COR1072 Enduring Transfer and Trade Arrangements
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
QSEC auction timetable
Modification 501 slides for Workgroup
Introduction of Code Contingency Guidelines Document
Transmission Workstream – Partial Assignment
Review of Trade and Transfer Winter 09/10
Entry Overrun Calculation
Richard Fairholme E.ON UK
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
IECR Incremental Step Size
Modification 0043 – Limitation on offering for sale unsold capacity
Entry Capacity Transfers - Constrained Period
Gemini Contingency Guidelines
Presentation transcript:

Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007

Introduction  Mod 133 was deferred at the March Mod Panel. We understand the issues to be a lack of clarity on how unsold entry capacity would be offered in the AMTSEC auction rounds and the operation of the 90% rule.  We have reflected on mod 133 and & would like industry input on a number of key topics before we revise the mod.  Our intention is to have a workable solution in place to transfer capacity for this winter.  We welcome your comments today & would also appreciate any written comments on this topic by Wednesday 11 April, all comments should be sent to:

Issues – Complexity (1)  Discussions have indicated that complexity of mod 133 is a major issue for industry, this is driven by:  Application of the 90% rule  Holding the auction over 4 rounds  Lack of clarity of the Exchange Rate methodology  National Grid NTS believes that this level of complexity arises from our requirement to provide fixed Exchange Rates ex-ante

Issues – Complexity (2)  For Discussion – do we need to publish ex-ante Exchange Rates  If we did not have to provide them National Grid NTS believe it could have the following benefits:  result in a single round auction  shorten pre auction processes  ensure the maximum amount of bids are satisfied in the shortest available period of time

Timeline – as currently drafted 1: AMSEC results or Mod implementation date 2 2. AMTSEC registration process initiated 3. Shippers registered/NG calculate Ex Rates : Publication of auction details via invitation Auction held Business days 2 6. Allocations provided to Users 1 7: Auction information to all users 2 8. For round 2, Return to step 2 & repeat steps until all unsold capacity transferred or 4 auction rounds completed Total number of days = 45

Timeline – for 1 round auction 1: AMSEC results or Mod implementation date 2 2. AMTSEC registration process initiated 3. Shippers registered 122 4: Publication of auction details via invitation 7 5. Auction held Business days Allocations provided to Users 7: Auction information to all users 2 Total number of days = 39

Issues – Bid Evaluation  Mod 133 as currently drafted translates all bids into a common bid stack based on a common unit price determined by: Bid Quantity * Bid Price * Exchange Rate  For Discussion - would this still be appropriate if we did not have to provide ex-ante Exchange Rates?  Suggestion – we form the bid stack based only on bid price (but also apply a minimum quantity), this would ensure that capacity is transferred to where it is valued most

Issues – Application Fee For Discussion – should the application fee:  be a one off fee applicable to all participants irrespective of which recipient ASEP the User bids at  be targeted on a per ASEP basis i.e. all bidders at a specific recipient ASEP will pay an application fee based on the costs attributable to that ASEP

Issues – Transitional Arrangements  Current drafting requires the AMTSEC auction to be initiated from the implementation date of mod 133, there is no provision within the mod if this date falls during the running of another auction  For Discussion – the transitional arrangements to be amended to reflect that National Grid NTS will initiate the AMTSEC auction within 2 business days of implementation of this proposal unless:  This date falls within the running of the QSEC auction  This date falls within the running of an RMSEC auction  Should the first AMTSEC only cover winter 07/08??