Lead from the front Texas Nodal 1 Texas Nodal EDS Market Trials Approach Wednesday, November 29, 2006.

Slides:



Advertisements
Similar presentations
1 Market Trials Outage Scheduling Qualifications Weekly Update February 18, 2010.
Advertisements

June 26, 2008 TAC Texas Nodal Market Implementation: Program Update Jerry Sullivan.
October 22, 2007 TPTF Meeting Early Delivery Systems Status Update and Forecast Daryl Cote/John Webb/John Hall.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
03/22/07 TPTF meeting ICCP Quality Codes Bill Blevins/Frank Kendall.
Texas Nodal 1 Nodal Telemetry Outreach and Recent Changes to Focused Input Testing (FIT) NATF Sep 29, 2009 Stacy Bridges, ERCOT.
Lead from the front Texas Nodal 1 TPTF Update for TAC November 29, 2007 Trip Doggett.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
1Texas Nodal Texas Nodal Market Trials and Data Verification ROS Meeting By Steve Grendel, ERCOT Thursday, 01/11/2007.
1 1 TPTF Review of Nodal Program Schedule Readiness to Send Schedule to TAC January 13, 2009.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
September 8, 2008 TPTF Nodal Core Projects Updates Nodal Project Managers.
TPTF Meeting Texas Nodal Program Update Market Readiness Metrics Update Chris Wilkinson PMO.
Lead from the front Texas Nodal 1 Registration and RARF Update to TPTF August 27, 2007.
1 Nodal Single Entry Model (SEM) Go-Live WMS Update May 18, 2009.
EDS 1 Early Delivery Systems Testing Preparation WebEx Meeting Jonathan Pulcini - EDS 1 John Webb - EDS 1 Ken Kasparian - EDS 3 Bill Blevins - EMS Frank.
Lead from the front Texas Nodal 1 TPTF Update for TAC October 5, 2007 Trip Doggett.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
January 15, 2008 Monthly Board of Directors Meeting Texas Nodal Market Implementation Program Update Jerry Sullivan.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
Network Model Management System (NMMS)
Lead from the front Texas Nodal 1 TPTF Update for TAC March 30, 2007 Trip Doggett.
EDS 2 Early Delivery Systems Release 3 – Workshop August 16, 2007.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call May 30, 2008.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call June 20, 2008.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
Lead from the front Texas Nodal 1 Texas Nodal EDS 3 Early Delivery System Plan TPTF April 02, 2007.
Lead from the front Texas Nodal 1 Texas Nodal Market Implementation Program Implementation Scenarios September 6, 2006.
Lead from the front Texas Nodal 1 Texas Nodal EDS 3 Early Delivery System Plan TPTF April 24, 2007.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Lead from the front Texas Nodal 1 Registration Update to TPTF Patrick Coon / Matt Mereness August 13 th, 2007.
Resource Registration Update Dana Showalter Patrick Coon March 4, 2008.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
Lead from the front Texas Nodal 1 Texas Nodal EDS 4 Early Delivery System Plan TPTF May 22 nd, 2007.
Lead from the front Texas Nodal 1 Reduction of MMS Vendor Effort for TPTF January 8, 2008 Murray Nixon Sai Moorty.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call April 25, 2008.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
April 1, 2008 TPTF Texas Nodal Market Implementation Program Update Jerry Sullivan.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
October 2, 2008 TAC Texas Nodal Market Implementation: Program Update Ron Hinsley.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
1Texas Nodal NATF Readiness Update Vikki Gates May 4, 2010.
June 5, 2008 TAC Texas Nodal Market Implementation Program Update Jerry Sullivan.
Lead from the front Texas Nodal 1 EDS Market Call Weekly Update Feb 06, 2009.
ROS Meeting – 06/12/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 06/12/08.
Lead from the front Texas Nodal 1 Texas Nodal Registration meeting- RARF Question &Answer Matt Mereness August 9 th, 2007.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
1 Market Trials Update NATF January 5, 2010.
EDS 3 Release 5 SCED Testing Update - TPTF Daryl Cote August 28, 2007.
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
1 Readiness Scorecard – Market Readiness Series Brandon McElfresh Nodal Readiness and Transition January 28, 2010.
EDS 2 Early Delivery Systems Approach March 2007.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
Market Trials Update NATF March 2,
Texas Nodal Program Current Schedule and Recent Changes
Presentation transcript:

Lead from the front Texas Nodal 1 Texas Nodal EDS Market Trials Approach Wednesday, November 29, 2006

Lead from the front Texas Nodal 2 Agenda Market Trials Objectives High Level Schedule EDS Phases EDS Timeline / Detailed Drill Down EDS Detailed Planning –Define Transition Plan Traceability Matrix –Detail Market Trial Phases and Test Areas –Create Entrance / Exit Criteria Checklists –Define Test Cycles, MP Segmentation, and Test Calendars –Outline Market Trials reporting requirements Next Steps –Market Trials Approach comments and approval –Detail out specific sections and review with TPTF –Tentative Schedule

Lead from the front Texas Nodal 3 Objective of market trials The objective of market trials is to confirm through a series of structured and unstructured tests that: “stable and accurate operations of the SCADA, Network Security Analysis, Transmission Constraint Management, SCED, LFC, DAM, RUC, and real time settlement system can be declared” as outlined in the Nodal Transition Plan.

Lead from the front Texas Nodal 4 Approach aligns with the Nodal Timeline

Lead from the front Texas Nodal 5 Market Trials Phases EDS 1 – Data and Telemetry EDS 2 – State Estimator, Network Security Analysis EDS 3 – Real Time Market Operations EDS 4 – Day Ahead Market Operations

Lead from the front Texas Nodal 6 EDS - Market Trials Timeline EDS 3 Jul 08 Dec 08 Sep 08Aug 08Mar 08Feb 08Jan 08May 08Jun 08Dec 07Oct 08Nov 08Apr 08 Cycle 1 LMP w Controls ACE DR Testing Compliance 1 hr EECP Comment Period ACE – 2 weeks (5.4.8 (2) Compare existing with new ACE results LMP Market Readiness Criteria MET 12/01/08 Realtime Markets GO LIVE ` 12/08/08 Forward Markets GO LIVE Zonal Markets Shutdown GO/NO GO Nov 07 Market Operations Sandbox & ERCOT UAT Market Trials Start Resource Registration All QSEs – Real Time Parallel Operations AS Qualification 3/31/08 Single Entry Model GO LIVE Reasonable LMPs 24x7 support All available MPs Reasonableness criteria met 6 months Oct 07 EDS 4 Feedback 168 hour test complete 168 Hour Test – 4 weeks to complete; 4 week feedback-fix 168 hour trial Go-Live & Transition Jul 07Sep 07Aug 07 May 07Jun 07 ICCP / Telemetry Validation SE Validation SCED testing cycles, voluntary per QSE scripted for 30 days Thereafter all QSEs participate in real time parallel operations EDS 2 EDS 1 Market Operations Sandbox & ERCOT UAT EDS 4 - Day Ahead Operations Limited 24x7 supportFull 24x7 support Market Operations Functional Testing

Lead from the front Texas Nodal 7 Market Trials Timeline and the detailed Market Trials Plan

Lead from the front Texas Nodal 8 EDS Detailed Planning Overview Define Transition Plan Traceability Matrix Detail Market Trial Phases and Test Areas Create Entrance / Exit Criteria Checklists Define test cycles, MP segmentation, and test calendar Additional Areas

Lead from the front Texas Nodal 9 EDS Detailed Planning EDSDescriptionTransition Plan Requirement Operations / SoSAMarket Trials tasksMP Interventions Notes 1Telemetry & ICCP Validation 5.4.1(2) ERCOT shall develop procedures for setup and data implementation requirements applicable to TSP’s and QSE’s. ERCOT shall with the assistance of TSP’s and QSE’s: (a) Verify that all data and telemetry requirements Specified in the nodal Protocols Section 3.10, Network Operations Modeling and Telemetry, Have been met and that all Data submittals are complete and represent an accurate model of the ERCOT System; - S.UC1.OP6: Update QSE Provider Information (EMS Operation) - S.UC1.OP7: Use Revised Data (EMS Operation) - S.UC1.OP8: Use Telemetry Data (EMS Operation) - S.UC2.OP1: Update RT Generation/Transmission Data (EMS Operation) - S.UC2.OP2: Update Transmission Ratings (EMS Operation) ICCP information TO the field (external): - S.UC2.OP4: Send Base Points - M.UC12.OP1: Clear RT Market (I know Base Points are communicated to QSE’s via ICCP, will need to check which other ones do) All telemetry (SCADA/ICCP) points checked out (programmatically or manually) 100 % Status Report at the end of this activity must indicate that 100 % of all points have been tested and verified Require Professional Engineers Seal from Entities to assure accuracy of data. Can be required from QSE’s/TSP’s due to issues of public safety and public interest Alarm Functionality Revalidated SCADA/ICCP enhancement to detect Forced Outage of equipment Real Time Weather Telemetry revalidated Dynamic Rating telemetry Validate all Transmission Element Limits and Constraints Check TSP’s calculation Transmission Element Ratings that are likely to be active in SCED Telemetry Criteria Developed (protocol ) Define and implement business processes to repair errors – Preliminary MP Interface Specs – Final Interface Specs This is a joint ERCOT and Market Participant task. Will require a EDS type functionality from TSP/QSE QSE/TSP personnel can SIMULATE analog/digital changes on their EDS and ERCOT EDS will be able to accomplish point-to-point check out with ERCOT operators Explore programmatic way to validate – this approach can be used later for periodic verification. 2Network Model Validation SE Solution 3Real-time Market Operations 4Day ahead Market Operations Define Transition Plan Traceability Matrix

Lead from the front Texas Nodal 10 Transition Plan Traceability Matrix Example Transition Plan Detail: 5.4.1(2a) ERCOT shall develop procedures for setup and data implementation requirements applicable to TSPs and QSEs. ERCOT shall with the assistance of TSPs and QSEs: Verify that all data and telemetry requirements specified in the nodal Protocols Section 3.10, Network Operations Modeling and Telemetry, have been met and that all data submittals are complete and represent an accurate model of the ERCOT System

Lead from the front Texas Nodal 11 Transition Plan Traceability Matrix Example (cont.) Requirement: ERCOT shall verify that all data and telemetry requirements have been met and that all data submittals are complete and represent an accurate model of the ERCOT System ERCOT Tasks: Define data and telemetry verification plan based on NP 3.10 Verify that all submittals are complete and represent an accurate model of the ERCOT system MP Tasks: Review data and telemetry verification section of Market Trials Handbook TSPs and QSEs assist ERCOT with data and telemetry verification Comments: NP-Section 3.10, Network Operations Modeling and Telemetry Requires NMMS to complete ITEST and in pre-production Issue an EDS 1 RFP to verify that NMMS systems and processes meet section 3.10 of the ERCOT protocols > Each requirement will be further detailed in the EDS Detailed Market Trials Test Plan

Lead from the front Texas Nodal 12 EDS Detailed Planning Detail Market Trial Phases and Test Areas –Define the set of functionality for each EDS phase based on the transition plan, business requirements, SoSA documentation, etc. –Identify EDS phase for all functionality based on comprehensive release plan and project schedule. –Define testing scenarios and test plan outlines

Lead from the front Texas Nodal 13 EDS Detailed Planning Create Entrance / Exit Criteria Checklists

Lead from the front Texas Nodal 14 EDS Detailed Planning Define test cycles, MP segmentation, and test calendar –Testing cycles will be used to optimize the trials schedule and reduce resource conflicts by focusing on specific market areas with a reduced number of participants. –Participants will be logically segmented into appropriate cycles. –A weekly test calendar will be used to focus weekly activities. Multiple cycles may be scheduled in a single week or over multiple weeks.

Lead from the front Texas Nodal 15 EDS Detailed Planning Additional Areas Outline Market Trials reporting requirements Define Market Trials data requirements Finalize Market Trial Phase critical inputs –Interface documentation –Requirements signoff –Design signoff –Market Operations Sandbox timelines

Lead from the front Texas Nodal 16 Next Steps Request comments on Market Trials Approach by 12/6/06 Return for approval in January Begin EDS detailed planning providing opportunities for comments as follows: –Review Transition Plan Traceability MatrixTBD –EDS 1 to 4 Detailed Plan – Drafts for commentTBD –EDS 1 Detailed Plan – Final SignoffTBD –EDS 2 Detailed Plan – Final SignoffTBD –EDS 3 Detailed Plan – Final Signoff3/30/2007 –EDS 3 Market Trials Handbook – Final Signoff6/29/2007 –EDS 4 Detailed Plan – Final Signoff9/28/2007 –EDS 4 Market Trials Handbook – Final Signoff12/31/2007

Lead from the front Texas Nodal 17 Questions?

Lead from the front Texas Nodal 18

Lead from the front Texas Nodal 19 Transducer (kWh) RTU Analog Status Accumulator Equipment Statuses Scaling TSP & QSE EMS SCADA ICCP ERCOT SCADA Phone Lines ICCP Link One-line Displays Mapping to network model ERCOT Quality codes PT CT QSE/TSP data accuracy assurance points by PE seal ERCOT data accuracy assurance points by PE seal A C B D E F G HIK M L SCADA Telemetry Schematic SegmentCertification RequirementNotes A to HTo be certified by MPs H to ITo be certified by TBD (3rd Party ?) I to NTo be certified by ERCOT – PE Seal and verified by System Operators J Quality codes posted by TSP N ERCOT EDS scope