CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Detector Control and Safety System for the Electromagnetic Calorimeter.

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

André Augustinus 16 June 2003 DCS Workshop Safety.
The CMS Detector Paoti Chang National Taiwan University
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
The Detector Control System for the ATLAS SemiConductor Tracker
G. Dissertori ETH Zürich ECAL ESR - DCS 1 ECAL Detector Control System G. Dissertori Electronics System Review, Oct 9, 2003 Status report Trigger/DAQ.
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
PSD8 September 2008, Glasgow.P R Hobson, Brunel University 1 Avalanche Photodiodes and Vacuum Phototriodes for the Electromagnetic Calorimeter of the CMS.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
The CMS Electromagnetic Calorimeter Roger Rusack The University of Minnesota On behalf of the CMS ECAL collaboration.
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
CMS ECAL Elba May 2006 R M Brown - RAL 1 The Status of the CMS Electromagnetic Calorimeter R M Brown On behalf of the CMS ECAL Group.
Calibration of the CMS Electromagnetic Calorimeter with first LHC data
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
I. Vankov, NEC’2003, September ‘03, Varna HV PS System NEC’2003, September 03, VARNA CMS HCAL High Voltage Power Supply System Dimitrov L.(*), Kunov B.(*),
1 US CMS DOE/NSF Review: May 8-10, WBS 4.0 The Electromagnetic Calorimeter Roger Rusack The University of Minnesota US-CMS L2 ECAL Manager.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
G. Dissertori ETH Zürich ECAL Cooling Review - DCS 1 ECAL Detector Control System G. Dissertori ECAL Cooling Review, Nov 4, 2004 Status report.
LHC The Large Hadron Collider (LHC) is an accelerator with 27 km circumference. Being built on the France- Switzerland border west of Geneva. It will start.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Jessica Leonard, U. Wisconsin, December 19, 2006 Preliminary Exam - 1 H->  Jessica Leonard University of Wisconsin - Madison Preliminary Examination.
1 P.Rebecchi (CERN) “Monitoring of radiation damage of PbWO 4 crystals under strong Cs 137  irradiation in GIF-ECAL” “Advanced Technology and Particle.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
First CMS Results with LHC Beam
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
G. Dissertori ETH Zürich ECAL - DCS 1 ECAL G. Dissertori DCS Coordination Board, Nov 10, 2004 Status report Trigger/DAQ project  DCS.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
Paolo Rumerio, CERN On behalf of the CMS Electromagnetic Calorimeter Group CALOR 2006 Chicago, June 5 th – 9 th, 2006 Commissioning of the CMS Electromagnetic.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
A discrete event system: the CMS Tracker interlock Icaleps 2005 Icaleps 2005 Andromachi Tsirou, CERN The CMS Tracker interlock system The CMS Tracker and.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
CMS ELECTROMAGNETIC CALORIMETER Jean-Pierre Ernenwein OVERVIEW 6th international conference on advanced technology and particle physics Villa Olmo, Como,
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
2004 LHC DAYS IN SPLIT- October 8 th 2004 L. Dobrzynski - LLR CMS - ECAL Test beam results Ludwik Dobrzynski On behalf of ECAL CMS LLR- Ecole polytechnique.
A. Parenti 1 RT 2007, Batavia IL The CMS Muon System and its Performance in the Cosmic Challenge RT2007 conference, Batavia IL, USA May 03, 2007 Andrea.
Calorimeter Mu2e Development electronics Front-end Review
Technical Design for the Mu3e Detector
IOP HEPP Conference Upgrading the CMS Tracker for SLHC Mark Pesaresi Imperial College, London.
Results achieved so far to improve the RPC rate capability
Resolution Studies of the CMS ECAL in the 2003 Test Beam
Overview Detector details Crystals Photo-detectors
CMS-ECAL DCS Prototype
CMS-ECAL Front-End monitoring Matteo Marone
CMS ECAL Calibration and Test Beam Results
The IFR Online Detector Control at the BaBar experiment at SLAC
Project Presentations August 5th, 2004
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
ELECTROMAGNETIC CALORIMETER
Presentation transcript:

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Detector Control and Safety System for the Electromagnetic Calorimeter of CMS Design Requirements for the CMS ECAL Specifications of the ECAL DCS Detailed specifications of the ECAL Safety System ECAL SS prototype - Test-beam results Predrag Milenovic CMS Belgrade Group

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Large Hadron Collider CMS ATLAS ALICE LHC: 27 km Circum., ~100m underground CERN

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Compact Muon Solenoid MUON BARREL CALORIMETERS Silicon Microstrips Pixels ECAL Scintillating PbWO4 crystals Cathode Strip Chambers (CSC) Resistive Plate Chambers (RPC) Drift Tube Chambers (DT) Resistive Plate Chambers (RPC) SUPERCONDUCTING COIL IRON YOKE TRACKER MUON ENDCAPS HCAL Plastic scintillator/brass sandwich

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey ECAL design criteria Physics goal Physics goal - The discovery of the Higgs at the LHC H→ γγ The favourable channel for low mass Higgs search: H→ γγ Design criteria: High energy (and angular) resolution: Barrel: Stochastic term (a): 2.7%, Constant term (b): 0.5%, Noise term (c): 150 – 220 MeV Hermetic, granular Compact, operated inside a 4T magnetic field. Challenging radiation environment with an integrated dose:  neutrons/cm 2 and 1 kGy at  = 0 to 2×10 14 neutrons/cm 2 and 50 kGy at  2.6. Fast response for 40 MHz bunch crossing rate.

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Choices, Constraints, Challenges Crystals – PbWO 4 –Short X 0 and R M –Fast light output (80% in 25ns) –Low light yield –Temp. sensitivity – -2.2%/ O C Photodetectors – APDs,VPTs –Gain – 50(10). –QE – 420 nm –Temp. sensitivity – -2.4%/ O C Constraints: –Very hostile radiation environment at LHC; –4T solenoidal magnetic field of CMS; –Low room-temperature scintillation yield of PbWO 4 ; –Temperature dependence of crystal light yield and APD response. Need to stabilise crystal volume temperature to 0.1 o C

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Temperature Stability Issue All 0.25  electronics runs at 2.5V A/channel 1 A/board Radiation hard regulator has a drop out voltage of 1.5V Total heat power dissipated in the whole calorimeter ~300 kW Crystal light yield decreases by 2.2%/ o C & APD gain decreases by 2.3%/ O C. Removing all excess heat is critical for the stable operation of the detector. Systems of crucial importance for the ECAL: Cooling system & Cooling system & Detector Slow Control System Detector Control System (DCS)

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey ECAL DCS Design Objectives: temperature stabilityExact monitoring of the crystal and APD temperature stability (18.0 o C ± 0.1 o C) air humidityMeasurement of the air humidity in the supermodule Safety system for automatic FE electronics disconnectionSafety system for automatic FE electronics disconnection (due to cooling problems, overheating of electronics, water leakage, over-voltage/over-current in FE) Development of the control software (sensors, HV, LV, cooling, safety…) Foreseen Difficulties: Sensors ~100m away from the readout electronics, not accessible, large radiation dose present in ECAL DCS Subsystems (independent on the DAQ): –Precision Temperature Monitoring (PTM) –Humidity Monitoring (HM) – Collaboration of research groups: ETHZ, Protvino and Belgrade ECAL Safety System (ESS) ECAL Safety System (ESS)

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Full system autonomy in all aspects; Independent, continuous temp. monitoring of the ECAL VFE + FE environment in both ECAL SM + EE; Precision : 0.2 o C Archiving of temp. data and system information for analysis of the detector status and ESS performance; Reliable hardwired interlocks with ECAL HV and LV Power Supply systems; External Alarm Interfaces with ECAL Cooling system, Water leakage detection system, as well as interfaces with general CMS DSS and LHC TCR; Prompt reaction on any external alarm or critical change of temperature inside the ECAL by issuing, in a proper time sequence, Warnings and Alarms to: 1. HV System Crates (hardwired interlocks), 2. LV System Crates (hardwired interlocks), 3. System Operator (soft PVSS Warning and Alarm messages); Radiation tolerance in accordance with CMS radiation dose specifications; Maximum possible level of robustness, reliability, safety and maintainability; ECAL Safety System

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Schematic layout Three interconnected system layers: ESS FE Layer Temperature conversion and channel multiplexing - ESS FE Layer, ESS PLC Layer Data acquisition, data processing and interlock generating - ESS PLC Layer, ESS Soft Layer System monitoring and system control - ESS Soft Layer Several external interfaces to: ECAL Low Voltage, ECAL High Voltage and ECAL Cooling systems, Input from Water leakage detection system CMS Detector Safety System (DSS), LHC Technical Control Room (TCR).

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey ESS Sensor Location SMD, 470 Ohms In total SMD, 470 Ohms NTC NTC thermistors (EPCOS) positioned in pairs at each measurement point ( “twin” sensors ). Sensor 1 Sensor 2 Connector Screw hole 8 / EB SM 8 / EE quadrant Sensors to be calibrated to relative precision of 0.1 o C with calibration setup developed by Belgrade group PSI irradiation PSI irradiation: Sensors irradiated to 4-5 times EE dose – EPCOS sensors behaved perfectly

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey FE Electronic components Rad-tolerant Max4582:  TTL/CMOS compatible  Temperature Range  0°C - 70°C  On-resistance  150 Ohms at 5V  Off-leakage current  1nA at 25°C  Low Distortion  Low crosstalk NTC 680 Ohms Resistant Bridge Front-End ASIC: IBM 0. m % spares ordered (with LHC cryo group) Bi-directional three-level programmable Internal Current Source (1  A, 10  A and 100  A), Differential Amplifier, gain = 50 (adjustable), input range: -50mV – 50mV, output range: 0 - 5V, Analog switches, 8 measurement modes of the chip, controlled by the Ck0, Ck1 and Ck2 bits, Removes ASIC voltage offsets, thermocouple effects, power supply & ambient temperature dependencies RBFE ASIC

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey FE Electronic components Custom-made MUX + ‘RBFE’ test board, irradiated at PSI: No problem, irradiated at ~ 10 6 x CMS balcony flux, and about 300 x CMS balcony dose  Tests in Belgrade: very satisfactory, could basically clock at 1 ms with 2x better resolution.  Has current generator at 500 μA  Need only (power, signal) 5V Programmable Microcontroller test board, irradiated at PSI: No problem, irradiated at ~ 10 6 x CMS balcony flux, and about 300 x CMS balcony dose  Purpose :  Control of MUXs and RBFE setup, Control of the communication (RS485), does ADC  Has watchdog timer, automatic RESET in case of blocking  Possibility to send remote RESET  Memory checksum sent: Control against SEU

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey FE Layer – ESS Unit Modular systemESS Units Modular system - Independent ESS Units Redundant readout Redundant readout - 4 SM or one Endcap 12 in total units needed for (EE+EB+EB+EE) Radiation tolerant Radiation tolerant can sustain radiation levels orders of magnitudes higher than those expected on the CMS balconies Redundant architecture - maximum reliability Redundant architecture - maximum reliability - minimum possible loss of temp. information from the inside of ECAL Reliability analysis Reliability analysis (for 4 designs) This layout with 8 RBFEs/4SM has smallest prob. to loose large number of modules in case of component failure Functional layout of ESS Unit in control of four ECAL Super Modules

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey H4-Beamline, CERN ECAL Test Beam Real-life testReal-life test of "almost" complete integrated system: –Readout: –Readout: (PbWO 4 +APDs+VFE(100xFPPA or 50xMGPA)+FE(L1,3μs)) –Slow Control (DCS) and Monitoring: LV, HV and Laser monitoring Cooling and temperature stability DCS subsystems: PTM, HM and ECAL SS –Online/Offline software Validation of pre-calibration strategy (reproducibility and transferability to CMS in-situ) Evaluation of effective detector performance (linearity, resolution, noise, stability) with new electronics design

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Energy (GeV) Energy Resolution(%) ECAL Test-beam results with final electronics Resolution(mm) Energy (GeV) 1 mm Position 0.6% at 50 GeV mm at 50 GeV. Target calorimetry resolution achieved with new electronics design!

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey ECAL Test-beam results with final electronics In situ:Fast intercalibration based on  symmetry in energy flow 2% in few hours Energy/momentum of isolated electron from W→ e in 2 months Energy/momentum of isolated electron from W→ e in 2 months Absolute energy scale from Z ee Absolute energy scale from Z → e + e - Test Beam LY Labo LY corr  = 4.05% Test Beam LY – Labo LY corr Lab4 % Relative channel calibration can be obtained from Lab with a precision of 4 % We cannot calibrate every crystal with an electron beam. Obtain a first calibration point from component data: crystal light yield, APD & PA gain.

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey RS 485 connection ESS test-beam setup with SM0 SM0

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey ESS test-beam results with SM0 ECAL SS (FE + Interface) PCBCalibration curve for one ESS sensor Noise dependence on RBFE position (ΔL ~ 40m) Noise distributions ~0.04°C ~0.025°C

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey ESS test-beam results with SM0

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Oscillations of temperature of the air inside and outside of the SM0 are correlated! Cooling problems ! Cooling water temp. too high -> ESS interlock ! -> LV off ! Cooling problem solved ! LV On ! Cooling problems ! LV On ! ESS interlock ! System performance satisfactory !!! ESS test-beam results – Example

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Back-up slides

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Three interconnected system layers: ESS FE Layer Temperature conversion and channel multiplexing - ESS FE Layer, ESS PLC Layer Data acquisition, data processing and interlock generating - ESS PLC Layer, ESS Soft Layer System monitoring and system control - ESS Soft Layer Several external interfaces to: ECAL Low Voltage, ECAL High Voltage and ECAL Cooling systems, Input from Water leakage detection system CMS Detector Safety System (DSS), LHC Technical Control Room (TCR). Schematic layout RS485

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey  TSS FE is modular system made of ESS Units as independent modules, all identical  Each TSS unit has its own, independent and redundant power supply; redundant readout  Each TSS unit provides redundant readout for four SM or one Endcap. There are 12 in total ( ) units needed for (EE+EHB+EHB+EE) There will be at least 3-5 spare TSS units (about spare entries in total);  TSS units can be interconnected in order to be controlled in parallel by the same PLC Control Signals --> possibility for parallel readout of several EB Super Modules and reduces the cabling between the Counting Room and the ESS Racks on the balconies; Redundant architecturemaximum reliability  Redundant architecture of the ESS readout unit : provide maximum reliability, so that, in the case of malfunction of any internal electronic components, the unit still works properly with minimum possible loss of temperature information from the inside of ECAL  All the electronic components of ESS FE Units have been shown (recent tests at PSI) that they can sustain radiation levels orders of magnitudes higher than those expected on the balconies... ESS FE Layer

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey FE Layer – ESS Rack Rack Layout of ECAL SS on CMS Blaconies Panel Layout of ECAL SS Unit

CMS ECAL DCS, Belgrade Group Four Seas Conference, 5-10 September 2004, Istanbul, Turkey Conclusions and Outlook