IHEP-02 1.3 GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,

Slides:



Advertisements
Similar presentations
Ultrasonic washer and HPR The 3nd IHEP-KEK SC collaboration meeting Ultrasonic Washer and HPR device for 9-cell 1.3GHz Cavity Zhongquan.Li, Jiyuan Zhai,
Advertisements

Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
9-cell Nb cavity seminar Dec.01, 2009 Facilities for 9-cell Nb cavities.
Progress of SRF and ERL at Peking University Lu Xiangyang Institute of Heavy Ion Physics Peking University.
9-cell Cavity R&D Progress and Test Plan GAO Jie ( 高杰 ) ZHAI Jiyuan ( 翟纪元 ) YU Jing ( 玉静 ) LI Zhongquan ( 李中泉 ) ZHAO Tongxian ( 赵同宪 ) GU Jun ( 谷俊 ) HOU.
201 MHz NC RF Cavity R&D for Muon Cooling Channels
1.3 GHz SRF Cavity R&D Plan Jiyuan Zhai ILC Group, IHEP 3 rd IHEP-KEK 1.3 GHz SRF Meeting, 7 Dec 2010, Beijing.
Elliptical SRF Cavities Mike Foley. Fermilab Feb 13-14, 2007DOE SCRF Review2 Elliptical SRF Cavities PREVIEW OF PRESENTATION –Brief review of established.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
Activities of Superconducting RF Accelerators at Nanjing University Sun An Proton Linear Accelerator Institute Institute of Energy Sciences, Nanjing University.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
The design of elliptical cavities Gabriele Costanza.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
201 MHz Cavity Fabrication Update Derun Li Lawrence Berkeley National Lab MICE CM24 at RAL, UK June 1, 2009.
SCRF Lab and IHEP Jianping Dai On behalf of the SCRF facilities team First Mini-Workshop on IHEP 1.3GHz Superconducting RF project, June 10-11,
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Design of a 9-cell Cavity Test Cryomodule for ILC in China IHEP-TIPC ILC Cryomodule R&D Group Institute of High Energy Physics (IHEP), CAS Technical Institute.
KEK Status Report Kirk 04/Mar/20151LCC 5th SCRF Meeting.
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
1.3GHz Input Coupler for ILC
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
Advances in Large Grain Resonators Activities of DESY, W.C. Heraeus and RI material and fabrication aspects preparation and RF test results W. Singer,
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
IHEP 1.3 GHz 9-cell Cavity R&D Status and Plan GAO Jie, ZHAI Jiyuan, YU Jing, LI Zhongquan, ZHAO Tongxian, ZHANG Jingru Institute of High Energy Physics,
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
The Third IHEP-KEK 1.3GHz SRF Technology Collaboration Meeting J.Gao IHEP Dec. 7-8, 2010.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
ALCPG2011, 3/19- 23, SRF Group Institute of Heavy Ion Physics, Peking University ALCPG /3/19-23, Eugene, Oregon, USA RF superconducting Cavity.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
ILC 07 May 30-June 3, 2007 N.Solyak 1 MULTIPACTORING SIMULATIONS IN CAVITIES AND HOM COUPLERS Nikolay Solyak, Ivan Gonin, Jiajian Li Fermilab.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
Cavity and Cryomodule Progress at RRCAT Satish Joshi Raja Ramanna Centre for Advanced Technology, Indore, India.
7th SRF Materials Workshop FRIB SRF Cavities 7/16/12 Chris Compton.
Andrew BurrillFall 2011 Project X Collaboration Meeting 650 MHz Developments at JLAB Andrew Burrill for the JLab Team.
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
CERN – Zanon discussions
ILC10 Beijing Global Design Effort
ILC R&D Board Meeting: SRF Cavities Status and Plans
ILC-SCRF Test Facilities considerations
Peng Sha Institute of High Energy Physics, CAS
Activities of Cavity Fabrication Facility at KEK
Fabrication of Nb and Cu SPL cavities and required tools CERN status
ELLIPTICAL SCRF CAVITIES
Effort Torwards Improving Large Scale Production for SC Cavities
SC spoke cavity for China-ADS 3~10MeV injector
Double Quarter Wave Crab Cavity
Cost reduction activities in cavity fabrication at MHI
HWR Cavities for China ADS
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Recent VT Results in the STF-2 cavities
Recent SCRF Activities in IHEP
Progress in Asia Hitoshi Hayano,KEK,
Quality control study with single-cell cavities
ADS Accelerator Program in China
IHEP Cryomodule Status
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
CEPC Main Ring Cavity Design with HOM Couplers
IHEP ILC Cavity Status Jiyuan Zhai (IHEP)
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
Cavity Degradation Experience at S1-Global
Peng SHA, On behalf of CEPC SRF group
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie, ZHAO Tongxian, ZHAI Jiyuan, LI Zhongquan, LI Dazhang, LIU Zhenchao Institute of High Energy Physics, Chinese Academy of Sciences CHEN Jinzhe, QIAO Jianqiang Beijing Hejieli Science and Technology Development Co. Ltd. YUAN Hong, YU Huai, WANG Jinxue Beijing Institute of Aviation Materials

OUTLINE Backgound of the IHEP 9-cell cavity IHEP-02 R&D goal and schedule IHEP-02 Fabrication Procedure HOM coupler

BACKGROUND  IHEP-01: Low-Loss Type 9-cell Cavity with Bare Tubes (VT)  IHEP-02: Low-Loss Type 9-cell Cavity with Full End Groups (VT&HT) IHEP-01 First Vertical Test Result Of IHEP-01 20MV/m

IHEP-02 R&D GOAL, SCHEDULE IHEP-02 with full end groups for the horizontal test Achieve the requirement of ILC  25-35MV/m for the vertical test  MV/m for the horizontal test IHEP Fabrication IHEP Surface treatment IHEP Vertical test Other Lab weld helium vessel IHEP assemble and HT IHEP

OUTLINE Backgound of the IHEP 9-cell cavity IHEP-02 R&D goal and schedule IHEP-02 Fabrication Procedure HOM coupler

Large Grain Niobium Sheets The cavity material disks from Ningxia OTIC (Nov., 2008) inspection, CP, annealing ultrasonic and eddy current scanning tests mechanical behavior sample test at room temp. and 4K RRR measurement We do that when we made the IHEP-01

Nb sheets thickness measurement The problem : uneven thickness like the above sketch map(1) will lead to large crack, the Uniform thickness maybe good, but we think uneven thickness like the good cketch map(2) may be better. 1: NOT GOOD 2: GOOD

IHEP-02 Progress O C, 3Hours Heating and cooling speed : 300 O C/H 4: After annealing, we deep drawing the half cell again. 1: deep drawing 2: trimming After trimming, Waiting for measurement Some half cells 3: Annealing after first trimming

Comparing of the twice deep drawing 37# # # # # # # # #0.10 4# Half cell No. After the first deep drawing After the second deep drawing Standard deviation

IHEP-02 Progress The half cells Frequency measurement of the half cell length, iris and equator diameter measurement

The measurement data Cell No. Freq.Q MHz Cell No. Average / mm Standard deviation / mm Cell No. Averag e / mm Standard deviation / mm Iris wall thickness Iris diameterFrequency of the half cell

IHEP-02 Progress  Equator roundness reshaping  20 μm chemical polishing of half cells, ultrasonic cleaning, rinsing, 3 μm chemical polishing at iris area, Rinsing,  EBW. New Fixtures for cell equator roundness equator roundness reshaping

equator roundness reshaping result 37# # # # # # # # # #0.04 No. Before reshaping after reshaping Standard deviation

IHEP-02 Progress Dumbell without stiffening ringDumbell with stiffening ring

stiffening rings forming

OUTLINE Backgound of the IHEP 9-cell cavity IHEP-02 R&D goal and schedule IHEP-02 Fabrication Procedure HOM coupler

IHEP-01 Mode; Freq. --- R/Q Boundary conditions: Electric-Electric & Magnetic-Magnetic

IHEP 01 Q E CALCULATION TM010 : 1.3GHz , Q e 2.88e+010 TE111 : Freq GHz , GHz Q e : 4.24e+004 , 7.85e+004 TM110 : 1.87GHz , Q e 1.37e+004 TM011 : 2.16GHz Q e : 2.97e+004 CST Model Lines per wavelength55 Lower mesh limit15 Mesh line ratio limit10 LL cavity with Tesla HOM coupler

HOM coupler material Nb StickRRR300 D60 , L500 5 couplers housing Nb sheetRRR300200×150×8.86 Inner conductors 5 Tesla HOM couplers

IHEP-02 next plan HOM coupler fabrication will be speed up. End groups fabrication Cavity Welding IHEP-02 will be finished at early 2011

Summary The multi-cell cavity is one of the key components for 1.3 GHz SRF technology R&D of IHEP. We have developed effective methods, procedures, tools and facilities to fabricate and tune the 9-cell cavity. The IHEP-01 finished fabrication and EBW, surface treated at IHEP and tested at KEK STF in July MV/m. It will be test at kek again in early The IHEP-02 will finish in early 2011, surface treated at IHEP and test in middle 2011.

Thanks for your attention