Overview of Ramp Development Giulio Stancari E-835 Collaboration Meeting Torino, May 7 1999.

Slides:



Advertisements
Similar presentations
Results of Deceleration Studies Giulio Stancari E-835 Meeting 23 October 1999.
Advertisements

Electron Cooling in the Accumulator McGinnis Electron Cooling in the Accumulator Dave McGinnis.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Run 2 PMG 2/16/06 - McGinnis Run II PMG Stacking Rapid Response Team Report Dave McGinnis February 16, 2006.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
FFAG Concepts and Studies David Neuffer Fermilab.
Proton beams for the East Area The beams and their slow extraction By : Rende Steerenberg PS/OP.
Yichao Jing 11/11/2010. Outline Introduction Linear lattice design and basic parameters Combined function magnets study and feasibility Nonlinear dynamics.
S.J. Brooks RAL, Chilton, OX11 0QX, UK Options for a Multi-GeV Ring Ramping field synchrotron provides fixed tunes and small.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Storage Rings Group Meeting Steve Werkema 24 March 2010.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
F Antiproton Source Apertures Steve Werkema DOE Tevatron Operations Review March 22, 2006.
Overview Run-6 - RHIC Vadim Ptitsyn C-AD, BNL. V.Ptitsyn RHIC Spin Workshop 2006 RHIC Run-6 Timeline  1 Feb – Start of the Run-6. Start of the cooldown.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
CASA Collider Design Review Retreat HERA The Only Lepton-Hadron Collider Ever Been Built Worldwide Yuhong Zhang February 24, 2010.
RHIC Status: Startup Run 12 V. Schoefer RHIC Spin Collaboration Meeting 1/13/12.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
Harold G. Kirk Brookhaven National Laboratory Progress in Quad Ring Coolers Ring Cooler Workshop UCLA March 7-8, 2002.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Containing a.
AP2 Line & Debuncher Studies Status Keith Gollwitzer Antiproton Source January 9, 2006 Many people involved with providing the hardware and software that.
Proton Source 1/12/07 E Prebys 1 Proton Delivery Because MiniBooNE is off.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Prospects for RHIC Low-Energy Operations Todd Satogata (W. Fischer, T. Roser, A. Fedotov, N. Tsoupas, M. Brennan, C. Montag, and others) “Can We Discover.
First Demonstration of Optics Measurement and Correction during Acceleration Chuyu Liu Collider Accelerator Department, BNL.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
FFAG’ J. Pasternak, IC London/RAL Proton acceleration using FFAGs J. Pasternak, Imperial College, London / RAL.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Compensation of Detector Solenoid G.H. Wei, V.S. Morozov, Fanglei Lin JLEIC Collaboration Meeting Spring, 2016.
Lecture 4 Longitudinal Dynamics I Professor Emmanuel Tsesmelis Directorate Office, CERN Department of Physics, University of Oxford ACAS School for Accelerator.
Workshop on Accelerator R&D for Ultimate Storage Rings – Oct Nov.1 – Huairou, Beijing, China A compact low emittance lattice with superbends for.
Analysis of Garren’s 27-Jul-2011 Hybrid Synchrotron Lattice J. Scott Berg Brookhaven National Laboratory Advanced Accelerator Group Meeting February 2,
Professor Philip Burrows John Adams Institute for Accelerator Science Oxford University ACAS School for Accelerator Physics January 2014 Longitudinal Dynamics.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Antiproton Acceptance Steve Werkema DOE Review February 24, 2004.
Antiproton Acceptance Steve Werkema February 8, 2005.
FFAG 4-Bend Injection Line into EMMA C. Johnstone, Fermilab EMMA phone conference July 24, 2007.
Weekly Pbar Report 10/26 → 11/2. Stacking This Week …
Resonance Compensation Raymond WASEF S.Gilardoni, A.Huschauer, D.Schoerling Acknowledgments M.Delrieux, J.C.Dumont, H.Genoud, C.Hernalsteens and all PS.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Off-axis injection lattice design studies of HEPS storage ring
J-PARC main ring lattice An overview
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Beam-beam effects in eRHIC and MeRHIC
Large Booster and Collider Ring
Coupling Correction at the Australian Synchrotron
Jeffrey Eldred, Sasha Valishev
Multiturn extraction for PS2
Nonlinear Field Quality Checks
Progress of SPPC lattice design
LHC (SSC) Byung Yunn CASA.
Collider Ring Optics & Related Issues
Multi-Turn Extraction for PS2 Preliminary considerations
Electron Rings Eduard Pozdeyev.
A Design Study of a Compressor ring for
Negative Momentum Compaction lattice options for PS2
Negative Momentum Compaction lattice options for PS2
Multipole Limit Survey of FFQ and Large-beta Dipole
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
JLEIC Weekly R&D Meeting
Compensation of Detector Solenoids
Multipole Limit Survey of Large-beta Dipoles
Upgrade on Compensation of Detector Solenoid effects
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
Presentation transcript:

Overview of Ramp Development Giulio Stancari E-835 Collaboration Meeting Torino, May

Ramps  t (new) : to go with the deceleration ramp, so that E-835 phase II runs above transition, consequently avoiding beam losses due to transition crossing. For each beam momentum, it can be obtained manipulating the lattice (mostly quad currents). Bend-bus: since the dipole kicks are fixed, it is a function of momentum only. Instead of calculating it, we will start from the E-835 ramp, which should still work. RF frequency: deceleration is performed with beam on central orbit. Defines momentum. Magnets were scaled accordingly. Time: defines pace of deceleration (about 20 MeV/s). They are tables with two columns: independent variable POFTT (related to beam momentum) and set value for each of about 100 devices. For E-835, 64 entries above transition (14 primary points).

Accumulator Magnets

SKEW QUADS: SQ100 and SQ607 SEXTUPOLES: SEX3, 7, 9, 10 and 12 OCTUPOLES: OCT10 and 12 SKEW SEXTUPOLES: to be installed this summer.

Considerations on  t Ramp It has to start from  t = 6.7 (value at 8 GeV) To facilitate energy calculation for E-835, lattice should be constant in data-taking region. Transition energy should be well below the  0 resonance (for instance,  t = 5.3 corresponds to M - 5  ). In order for the stochastic cooling to work properly, the mixing factor M has to be within a certain range ( approximately 5 < M < 20). A good choice is  t = 4.8 at the low end of the ramp.

Lattice Constraints Tunes must be constant, to avoid crossing resonant lines. Betatron phase advance between transverse cooling pick-ups and kickers close to an odd multiple of 90 degrees. Low dispersion (< 0.1 m) at A-30 and A-50; high dispersion (> 9 m) at A-60 and A-30 (for momentum cooling). Beta function as small as possible; in straight sections,  > 5 m (for transverse cooling pick-ups) and  < 8 m (for aperture). Chromaticity should be small (to keep tunes far from resonant lines) and positive (for longitudinal stability). Six-fold symmetry!

Ramp Development Scheme Measured lattice at 8 GeV (Feb 1999). Calculation of ramps (in progress) using arbitrary starting point: - to demonstrate feasibility of “snowplowing  t down” with given lattice constraints; - to determine procedure for going from one point to the next. During ramp development with beam (this summer): - measure lattice at one ramp point; - compare and correct prediction; - calculate next point; - go there; - repeat at next point.

Commissioning Plan (as of May 3) May Jun 15: 8 GeV Lattice (reverse protons, normal polarity) Jun Jun 22: AP-2, Debuncher, D-to-A line Jun Jul 13: Stochastic Cooling (switch to forward protons, reverse polarity) Jul Aug 3: Proton Stacking Aug 4 -- Aug 10: Shutdown (install skew sextupoles and AP-2 line modifications) Aug Oct 14: Ramp Development Oct Nov 4: Shutdown (Deb. Band I & II) Nov 5 -- Nov 18: Deb. Band I & II Nov ?: E-835 Run