– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.

Slides:



Advertisements
Similar presentations
Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
Saturday 7ish – refill for RP set-up 9:15 Going for Roman pot alignment. Stefano is coming. 12:10 TOTEM: Alignment of horizontal RPs B2 finished, short.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
:30 meetingEBH 1  4:14 lost cryo conditions in Sector 34/45 due to communication problem  6:30 Faulty IT network switch identified  access.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
04:01 Injection kicker timing problems B2  Injection pre-pulse shifted, causing BETS to inhibit beam injection. 144 bunches on TDI.  Run without ROF.A81B2.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Saturday 14:10 Cryogenics back [26 hours 40 minutes] Pre-cycle 15:30 Beam 2 in  Interlock on TCLIB.6R2.B1. Alessandro Masi found a broken sensor, it would.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
LHC Status Tue Morning 22-Aug
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Wednesday September 14th
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Monday 11/07: Recovery Plenty of accesses.
Saturday 30th June - Sunday: Rocky !
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Bernhard Holzer, Joerg Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Thursday 10th May - morning
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 36 plan Todo’s: And also: 12+b injection.
Week 35 – Technical Stop and Restart
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Friday 15th February - morning
Tuesday – Morning and Evening
Another Immortal Fill….
Tuesday
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots – If time left over night: second ramp with pilots. Open primary collimators at flat top for manual chroma measure at collision – Check BPMS. 3 nominals. Interlocking with bump and scraping BPMS – TCSG. Measure beam position w 12 nominals. Call Jorg. If position changed, check TCSG alignment – Ramp into collision 2 – 3 nominals (< 3e11) for Roman Pot alignment. In principle only Totem alignment, max 5 hours alignment. Finish fill with Betatron loss maps with resonance crossing Asynch dump tests LHC 8:30 meeting 29/06/2012 LHC Status Mon Morning 2-July Bernhard Holzer, Jan Uythoven Plan for restart after Technical Stop

Plan for start-up with beam – Fill with 3 nominal bunches for loss maps (<3e11 p) Betatron loss maps at the end of the squeeze with separated beams (using the ADT on bunch 1 and 2) Possibly repeat betatron loss maps in physics (resonance) if not enough beam was left in the alignment fill. Negative off-momentum in physics (Roman pots IN) Sunday – 02:00 No beam in the machines for the leap second – Repeat another fill for asynch dump tests with Roman Pots in if there was not enough beam left after RP set-up – injection loss maps with ADT method at injection – can also be done during the intensity ramp up – If things go extremely well already start the intensity ramp up LHC 8:30 meeting 29/06/2012

Intensity ramp-up – 84 bunches: 2 hours Stable Beams – 480 bunches: 6 hours Stable Beams for ATLAS (but don’t refill) – 840 bunches + 12 non colliding: Production fill – 1380 bunches: Production fill LHC 8:30 meeting 29/06/2012 ✔ ✔

Fri Late / Night 19:50h starting a test-cycle ramp and squeeze ALFA movement tests... -> problematic station A7L1 20:00h trip of RQX.L8 at about 1500 A 20:25h switch closure problem on RCS.A23B2. Access needed 21:44h repeating the ramp on RQX.L8 -> trip at 1100 A... problem of temperature on the current lead... (Quench ! ) investigating on site (i.e. in tunnel) exchannging cards... error moves with the card error located at a cable 23:03h problem in trimming the RF frequency -> fixed by Greg 04:43h RQX.L8circuit back in business 04:44h ice on a He valve... checked by cryo... to be followed up

Sat Morning 06:09h Unable to change the beam mode; “With Greg's help via telephone (he was at the airport) we managed to fix the problem which prevented us from changing the beam mode (the library junit.jar was missing in the LSA library folder).” 06:54h injection probe beam !! at present: XPOC latched for beam 1 and beam 2 after programmed dump.

10:00 First Ramp with 2 probes: loosing most of the beam on the ramp Decide to call the RF, as more losses when freq. modulation on Themis (RF) – Beam Phase Loop: A subset of the beam phase loop persistent settings were apparently set to zero when the module was re-initialized after the technical stop. We are suspecting that some controls changes during the week had adverse consequences. As a result we were effectively running with the beam phase loop open. This explains the debunching issues at flat bottom and during the ramp. LHC 8:30 meeting 01/07/2012 Sat Morning

Two pilot ramps with large losses Themis (RF) – Beam Phase Loop: A subset of the beam phase loop persistent settings were apparently set to zero when the module was re-initialized after the technical stop. We are suspecting that some controls changes during the week had adverse consequences. As a result we were effectively running with the beam phase loop open. This explains the debunching issues at flat bottom and during the ramp. LHC 8:30 meeting 01/07/2012

Themis (RF) Continued – Since the settings were lost, Daniel inserted temporary settings so that the LHC program could continue. These settings are NOT optimal for high bunch intensity operation, but should not interfere with the initial intensity ramp-up. We are hoping that the controls experts will be able to recover the persistent data. Otherwise, some time will be necessary to reset the beam phase loop on Sunday/Monday. No debunching was observed in the next injection. – Shortly before the above steps were completed, all four cavities of module 1B1 started oscillating. After our investigation, we once again found that even though the settings that had been adjusted during the RF startup yesterday were correct in FESA, they had been overwritten in the actual hardware. This is a bit concerning since it seems that running the sequencer was sufficient to introduce this error. We will also follow this up with the controls experts. Everything seemed a lot better afterwards. Ramp 3 bunches for RP alignment was OK Optimised settings put back Sunday morning LHC 8:30 meeting 01/07/2012

Manual chroma in second pilot ramp Vertical chroma seems ok Horizontal (close to) negative Better repeat some time with better tune signals LHC 8:30 meeting 01/07/2012

Checks required after interventions during TS – Scrape bunch and check when reading lost = IL triggered: At 2e10: perfect – Bump the beam and check when interlock triggers At 3.0 +/- 0.1 mm: perfect – Check orbit reading with 50 ns trains, done with 12 bunches, relative to TCSG / TCDQ retraction OK...but dumped beam on first 12 bunch injection and first pilot injection – OK afterwards... Seems like a bad reading LHC 8:30 meeting 01/07/ :30h Check of interlock BPMS in IP6 Sat Late

23:10 Totem starting alignment... needed 2 hours. Also moved Alpha in Moved RP out for dump for leap second at 02:00 04:00 Ramped for loss maps with Roman Pots in – Collisions to perform loss maps. We carried out betatron loss maps in both planes, both beams (B1V lost very much intensity when crossing the resonance). We then did the OFF momentum loss maps (with very low intensity left in B1) and the beams were dumped by the unmaskable BLMs – One more ramp this morning for loss maps (see later) LHC 8:30 meeting 01/07/ :03 Start ramp 3 bunches for Totem alignment Sat Late

The recovery took about 2h as the communication with many systems was affected and we had to reboot the consoles and many control systems – A few minutes before 2am all the accelerators were stopped. At 1 second before 2am the leap second was inserted. The 1400 or so Linux Servers, Consoles and Front Ends + the LynxOS Front Ends correctly inserted it. – Some problems coming back – finally all worked out LHC 8:30 meeting 01/07/2012 Sat Night 02:00 Leap second

Sun Morning 07:00h EDF problem, 2 RF modules, 5 sectors (S12, S23, S67, S78, S81) and dipoles of ALICE and LHCb. 08:40h injection delayed: As a consequence of the electrical glitch...many collimators seem to have steps lost. 10:09h Lost power converter RPTF.SR3.RQ4.LR3 (at injection) -> piquet “ short circuit on electronic” 10:09h Injection probe beam 16:32h cogging problem, cannot inject beam 2 -> re-synchronisation 17:05h finally: ramp

Sun Late 17:50h loss maps in Squeeze & asynchronous dump with RP “in” 20:00h “again problem with the RF beam 2 cogging” 21:00h loss maps at injection... with / without injectio protection collimators

Sun Night 23:00hinjection for first intensity step (84 bunches) large inj. oscillations 23:42h “ B2 dumped at injection due to problem on MKB. fault was triggered by a wrong acquisition of 2 vacuum gauges” 00:25hinjection physics beam 01:00hsqueeze / adjust / collisions

Sun Night 03:50hdump & pre-cycle 04:52hinjection... with some problems... filling scheme has not updated in DIP Beams dumped by BPM in P6. It looks like a false trigger. 06:08h480 bunches injected ramp / squeeze / adjust & stable beams