OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements.

Slides:



Advertisements
Similar presentations
Market Solution 1 Definitions Market Solution A Market Solution exists when at least three unaffiliated Resources, with capacity available, submit bids.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
PRR 692 APPEAL PRESENTED BY: Constellation NewEnergy DATE: November 2, 2006.
ERCOT Load Forecast Uncertainty V2 August 2, 2006.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
Loads Acting as a Resource Relationships with QSEs and LSEs
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
ERCOT WHOLESALE MARKET OPERATIONS MODULE 2. 2 Essential Concepts Ancillary Services Congestion Management Topics.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
PRS - RPRS Task Force Status Summary - August 14, PRS RPRS Task Force Status Summary Prepared for WMS and PRS August 2006.
QSE Managers Working Group Meeting Notes 7 November, 2008 Report to WMS 19 November, 2008 David Detelich - Chairperson.
RPRS ERCOT System Wide Insufficiency Charge Presented at the Technical Advisory Committee June 1, 2006.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Report to TAC August In Brief Working Group Reports Working Group Reports CMWG CMWG DSWG (No report) DSWG (No report) MCWG MCWG MWG (No report)
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
1 ERCOT Wholesale Settlement Module 3. 2 BENA iq = -1 * (Σ (RI iz + LI iz + URC iz + MISD iz + MISR iz ) z + TCRPAY Bei + Σ CSC Bei ) * LRS iq Can you.
GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
Updated Cost/Benefit Analysis for PRR 567 Multi-Part A/S Bidding PRS January Meeting January 19, 2006.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher February 22, 2005.
RMR Task Force Decision Points for ERCOT Technical Advisory Committee April 3, 2003.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Application of High Sustainable Limit With PRR 666/676 WMS November 15, 2006 Ino Gonzalez ERCOT Settlements.
Unit-Specific Bid Limits based on Modified Generic Cost.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
RPRS TF and QSE Managers Report to PRS 1)Procurement (QSE Managers) 2)Cost Allocation (RPRS Task Force) –PRR 674 –PRR 676 –PRR 678.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
1 RPRS Market the issue of capacity inadequacy solved by the Local Congestion procurements ERCOT Feb 19, 2004.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
ERCOT Monthly Operational Overview (July 2012) August 15, 2012.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
ERCOT Wholesale Market Basics Module 3 Settlement.
COPS – ERCOT PROJECTS UPDATE WHOLESALE MARKET DEVELOPMENT Paula Feuerbacher October 20, 2004.
RPRS Settlement Examples Market Support Services March 30, 2005 March 14, 2006 Presented by ERCOT Art Deller Bill Kettlewell.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
QSE Managers Working Group Meeting Notes 9 June, 2009 Report to WMS 17 June, 2009 David Detelich - Chairperson.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
QSE Managers Working Group Report to WMS September 19, 2007.
2004 CSCs & Zones. Goals for 2004 Increase ERCOT market efficiency Reduce out-of-merit energy and capacity deployments Reduce uplift of local congestion.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
December 8, 2006 PUCT DR Workshop Status of LaaR Participation in RPRS.
WMS Meeting- February 13, 2013 Day-Ahead Market (DAM) Analysis of Feb. 6 Ancillary Service Prices ERCOT- Matt Mereness (DAM/CRR Manager) IMM- Dan Jones.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Alerts & Reserves. December, Objectives Maintain reliability –Ensure that adequate reserves are available Market Clearing Price of Energy is synchronized.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
Ancillary Services Replacement
RPRS March 23, 2006 Presented by ERCOT Art Deller Bill Kettlewell
TAC Report to the ERCOT Board
General Overview Of Resource Costs
Market Notice Regarding Off-line Units
Review of Abnormal MCPEs
The New Texas Wholesale/Retail Market
Presentation transcript:

OOMC and Local RPRS Settlement Alignment January 2007 WMS Meeting Ino Gonzalez ERCOT Settlements

Objectives Align Settlement of Local RPRS Deployments with that of OOMC

Reasons for Proposal Potomac Economics Recommendation –Both Services Utilized to Solve Local Constraints –Consistent Settlement Methodology –Include Start-Up Claw-Back –Include Claw-Back Three Hours After End of Deployment WMS Request for PRR proposal

Reasons for OOMC Deployments Out of Merit Capacity and Out of Merit Energy Services ERCOT will use OOMC and OOME Services to procure additional capacity and energy required to provide reliable ERCOT System operation, or to effectively manage Local Congestion as determined by ERCOT.

Reasons for Local RPRS Deployments Local Congestion Replacement Reserve Payment to QSE The QSE for a Resource selected to provide RPRS to resolve Local Congestion that actually reconnects to the ERCOT Transmission Grid and starts the unit in order to provide RPRS will be paid both the Resource Category Generic Startup Cost for starting the unit and the Resource Category Generic Minimum Energy Cost less the MCPE for operating at the Low Sustainable Limit (LSL) as set forth in the Resource Plan for that unit during the instructed interval (s). If the MCPE during the intervals of an hour in which ERCOT deploys a Resource for RPRS provides revenue in excess of the hourly cost to start and operates the unit at LSL, the QSE representing the Resource may retain any such excess revenue.

Settlement of OOMC Deployments If RPRS Bid Price exists, Then: PCOOM = (-1)*Min [(BPRP * COOMRP), (PS + PO)] Else: PCOOM= -1 * (PS + PO) Where: PCOOM = OOMC Payments ($) BPRP = Bid Price for Replacement Reserve ($/MW) COOMRP = OOMC Awarded Capacity (MW) PS = Start Up Price PO = Operating Price

Settlement of OOMC Deployments If the unit is deemed to be on-line, Then: PS = 0 PO = ∑ [(RCGMEC – MCPE) * MIN(LSL/4, MR) ] Else: PS = Max [ 0, ( RCGSC – { ∑ (MCPE * MR) }) ] / # of instructed hours PO = ∑ [(RCGMEC – MCPE) * MIN(LSL/4, MR) ] Where: RCGMEC = Resource Category Generic Minimum Energy Cost RCGSC = Resource Category Generic Startup Cost LSL = Resource Low Sustainable Limit MCPE = Balancing Energy Market Clearing MR = Actual Metered Output of the Resource Clawback

Settlement of OOMC Deployments If resource continues to remain online after the instructed intervals Then: CRCGSC = ∑ (MCPE – RCGFC) * MR If CRCGSC > 0 & Total PS>0 PS = Max(0,[ RCGSC – ∑ (MCPE * MR) - CRCGSC ]) / # hours Else PS = Max(0,[ RCGSC – ∑ (MCPE * MR) ]) / # hours Where: CRCGSC = Charge Against the Resource Category Generic Startup Cost Clawback

Settlement of Local RPRS Deployments Current Methodology LPC= -1 * Max(0, LPS + LPO) If unit is deemed to be Off-line, Then: LPS = RCGSC / N LPO = ∑ [(RCGMEC – MCPE) * MIN(LSL/4, MR) ] Proposed Methodology PS (LPS)= [ RCGSC – ∑ (MCPE * MR) - CRCGSC ] / # hours PO (LPO) = ∑ [(RCGMEC – MCPE) * MIN(LSL/4, MR) ] Where: LPC = PCOOM = Local RPRS Payments ($) LPS = PS = Price for starting the resource LPO = PO = Price for operating the resource N = Number of hours of procurement Clawback

Conclusion and Recommendation 1.No significant difference between OOMC and Local RPRS Settlements 2.Elimination of significant manual process to identify multiple startup payments for same resource. 3.Align Settlements of OOMC and Local RPRS