PRELIMINARY DESIGN OF NEW CONNECTION LINES: BSY TO A-LINE AND CU-LINAC TO SXR Y. Nosochkov April 1, 2015.

Slides:



Advertisements
Similar presentations
Electron Beam Control and Alignment LCLS FEL Undulator Commissioning Workshop UCLA Jan , 2004 P. Emma, SLAC Undulator collimation and protection.
Advertisements

SCUs for the LCLS-II HXR FEL SCUs for the LCLS-II HXR FEL P. Emma, et. al. July 9, 2014 Hard X-Ray (HXR) FEL for LCLS-II must cover 1-5 keV (4-GeV) SASE.
ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.
Beam line summary paul drumm for beam line group.
Super-B Factory Workshop January 19-22, 2004 IR Upgrade M. Sullivan 1 PEP-II Interaction Region Upgrade M. Sullivan for the Super-B Factory Workshop Hawaii.
Recirculating pass optics V.Ptitsyn, D.Trbojevic, N.Tsoupas.
ATF Cooling Water System Toshiyuki OKUGI, KEK 2015/ 2/ 24 ATF2 Project Meeting LAPP (Annecy, France)
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
PPS and BCS Requirements for LCLS-II (Baseline) Stan Mao 06/10/2015.
LCLS-II Transverse Tolerances Tor Raubenheimer May 29, 2013.
ILC RTML Lattice Design A.Vivoli, N. Solyak, V. Kapin Fermilab.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
Transfer Line -2 Optics Design For CTF3 Amalendu Sharma, Abdurrahim, A.D.Ghodke, Gurnam Singh and V.C. Sahni Raja Ramanna Centre for Advanced Technology.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
03/30/06 DEJBNL&FNAL PD Collaboration kickoff meeting Beams-doc Current layout of beams from PD ~ 700m Active Length 8 GeV Linac 8 GeV neutrino.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
Accelerator Science and Technology Centre POST-LINAC BEAM TRANSPORT AND COLLIMATION FOR THE UK’S NEW LIGHT SOURCE PROJECT D. Angal-Kalinin,
Harmonic lasing in the LCLS-II (a work in progress…) G. Marcus, et al. 03/11/2014.
Beam Stay-Clear (BSC) Apertures in LCLS-II June 24, 2015 P. Emma Take up work Jim Welch started (LCLSII-TN-14-15, Jan. 23, 2015) Goal is to define stay-clear.
Primary beam production: progress - Extraction from LSS2 - Switching from TT20 at 100 GeV B.Goddard F.Velotti, A.Parfenova, R.Steerenberg, K.Cornelis,
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Post-LH Diagnostic Line for LCLS-II P. Emma, M. Woodley, Y. Nosochkov, Feb. 26, 2014 Steal beam at Hz with y -kicker after LH (  y = 15 mm) Bend.
Principals of fast injection and extraction R. Apsimon.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LCLS-II Particle Tracking: Gun to Undulator P. Emma Jan. 12, 2011.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Optimization of beam envelop at the injection point of PS Chenghui Yu Jan. 30, 2012.
Preliminary Tracking Results through LCLS-II P. Emma et al., Oct. 23, 2013 Thanks to Mark Woodley and Yuri Nosochkov for MAD design work Use Christos Papadopoulos.
Corrections for multi-pass eRHIC lattice with large chromaticity Chuyu Liu ERL workshop 2015 June 7, 2015.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
LCLS-II Optics Release: 26FEB16. What’s new in this release? new cathode-to-L0 (“GUNB”) layout ˃input Twiss from Feng Zhou’s 100 pC beam updated cryomodule.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
FFAG 4-Bend Injection Line into EMMA C. Johnstone, Fermilab EMMA phone conference July 24, 2007.
THE NEXT LINEAR COLLIDER DAMPING RING COMPLEX J.N. Corlett, S. Marks, R. Rimmer, R. Schlueter Ernest Orlando Lawrence Berkeley National Laboratory, Berkeley,
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Re-design of extraction line for single stage BC
​The LCLS-II and SLAC Facilities for Dark Sector Searches
Arun Saini, N. Solyak Fermi National Accelerator Laboratory
Dispersion correction in the bypass dogleg
Coupling Correction at the Australian Synchrotron
LCLS-II Lattice 26FEB16: updates in the areas from bypass to dump
RTML Design and Cost reduction Nikolay Solyak Fermilab
Isochronous, FFAG Rings with Insertions for Rapid Muon or Electron Acceleration G H Rees, RAL.
Alternate Lattice for LCLS-II LTU Y
Beam-Based Feedback in LCLS-II
AD & I : BDS Lattice Design Changes
Compact and Low Consumption Magnet Design The DESY Experience
Potential Use of PEP-II Magnets by Project X
26AUG16.
Re-circulating Linac Option
01SEP17.
XFEL Beam Collimation and Switchyard Review Beam Switchyard
Chromatic Corrections in LCLS-II P. Emma, Y. Nosochkov, M. Woodley Mar
Lattice update: downstream sections
XII SuperB Project Workshop LAPP, Annecy, France, March 16-19, 2010
Two ways to discuss color 1) Addition 2) Subtraction
Studies for TBT optics measurements in the PSB
Wake induced voltage in LCLS-II: LTU + undulator
OPTICAL ILLUSIONS.
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Bunch Compressor Beam Line Optics
Progress on Non-linear Beam Dynamic Study
Transfer Line for EIC.
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
JLEIC Collider Rings’ Geometry Options (II)
Upgrade on Compensation of Detector Solenoid effects
Presentation transcript:

PRELIMINARY DESIGN OF NEW CONNECTION LINES: BSY TO A-LINE AND CU-LINAC TO SXR Y. Nosochkov April 1, 2015

Spreader schematic with connections from Cu-linac to SXR and from BSY to A-line 04/01/2015 2

Realistic layout with kicker/septum for transport from BSY to A-line 04/01/ Quads: SXR – cyan HXR – green Dumpline – black CuRF – black Bends: – magenta Septum: SXR – red HXR – blue Kicker: SXR – red HXR – blue Correctors: SXR – red HXR – blue D10 dump: – black to A-line HXR SXR Cu-linac LCLS2 Cu-linac X-plane Y-plane D10 SXR HXR

Connecting BSY with A-line 04/01/ Insert kicker/septum downstream of HXR merge bend to connect with A-line HXR beam Cu-linac beam

BSY matched to existing A-line optics 04/01/ Magnetic kicker (~MHz) and septum in BSY, and a DC bend magnet in A-line. Septum and bend are slightly rolled for match to A-line geometry. Magnetic field for 10 GeV beam. K S BA-lineBSY Kicker: 5m x 70G Septum: 4.72 kGm Bend: 1.79 kGm

Layout with dogleg connection from Cu-linac to SXR 04/01/ Quads: SXR – cyan HXR – green Dumpline – black CuRF – black Bends: – magenta Septum: SXR – red HXR – blue Kicker: SXR – red HXR – blue Correctors: SXR – red HXR – blue D10 dump: – black to A-line HXR SXR Cu-linac LCLS2 Cu-linac X-plane Y-plane D10 SXR HXR

Optics of the dogleg from Cu-linac to SXR 04/01/ ~45° rolled outer bends Minor zigzag in the middle of the dogleg using two weak bends to cancel R56 (not in scale) CuRF SXR L = 74.5 m Bends: 6.27 kGm, 0.52 kGm at 15 GeV R56=0 not yet tunable Quads at center are too strong

Optics of the SXR spreader before match with the dogleg 04/01/ Additional quads are needed in SXR for a match with the dogleg optics Dogleg merging with SXR SCRF SXR

Optics of the SXR spreader matched with the dogleg 04/01/ Two new SXR quads (highlighted), and adjusted positions of QBP33, QBP34. Note reduced beta functions. Dogleg merging with SXR SCRF SXR

Matched optics from CuRF BSY to SXR 04/01/ dogleg SXR CuRF BSYwall

Complete machine from Cu-linac to SXR dump 04/01/ SXRCu-linac The SXR undulator quad field is set to GL = 3T

Tight spots 04/01/ to A-line HXR SXR Cu-linac LCLS2 X-plane D10 Q50Q2 (BSY) (Magnet drawings per C. Iverson) QSP13H (HXR) dogleg pipe QCUS9

Things to do 04/01/ Reduce the dogleg quad strengths Check dogleg interferences Provide R56 tuning capability Check SXR magnet strengths at 15 GeV

Spreader layout with new transport lines: from BSY to A- line and from Cu-linac to SXR 04/01/ Quads: SXR – cyan HXR – green Dumpline – black CuRF – black Bends: – magenta Septum: SXR – red HXR – blue Kicker: SXR – red HXR – blue Correctors: SXR – red HXR – blue D10 dump: – black to A-line HXR SXR Cu-linac LCLS2 Cu-linac X-plane Y-plane D10 HXR SXR