AIDA 1 20 Heatsink units, locating pins and washers now on site. Status of Electronics Module
These parts complete, delivered to Liverpool Templates for the cutting of the Dow Corning form to be produced and manufactured. Fasteners to be ordered. AIDA 2 Status of Electronics Module
3
AIDA 4 Status of Detector Mechanics PT100s and a controller have been wired by Paul and are monitoring temperature.
AIDA Thermal tests, N2 insulating volume, with Thermocube providing cooled nitrogen for detectors. Awaiting delivery of bottled Nitrogen to lab Nitrogen insulated 5 Slide is a reminder of proposed tests.
AIDA 6 This is the unit that will be used to cool the nitrogen gas. Unit on site at Daresbury.
AIDA All bought out parts now at Daresbury. Other parts to be made at Liverpool Workshop, delivery expected 13 th Feb Assembly at DL. Note of caution: Pauls expecting to be on paternity leave around end of Feb. Status of Detector Support Cooling plates Jumo Chiller Baseframe 7