THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS.

Slides:



Advertisements
Similar presentations
MPSRThermal- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW Thermal Christopher Smith University of California - Berkeley.
Advertisements

THEMIS INSTRUMENT PER 1 UCB, May, 2005 EMC / Mag Instrument Test Plan & Results Michael Ludlam University of California - Berkeley.
THEMIS Mission CDRInstrument I&T 1 UCB, June , 2004 Instrument Integration and Test Rick Sterling / Sharon Jelinsky University of California – Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Integration and Test Critical Design Review Rick Sterling University of California – Berkeley Thm_CDR_IT_Revc.
THEMIS FRRSC - 1 KSC, Feb 12, 2007 SPACECRAFT OVERVIEW/STATUS Peter R Harvey THEMIS Project Manager.
THEMIS Instrument Thermal Peer Review 1 UCB, February 26, 2004 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING.
MPSRSYS- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW SYSTEMS OVERVIEW Ellen Taylor University of California - Berkeley.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
4 th NASA Space Weather & Robotic Mission Operations Workshop, NASA/GSFC, Greenbelt, MD, September 27, THEMIS Operations & Anomalies Manfred Bester.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Test Plan Michael Ludlam Space Sciences Laboratory.
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 THEMIS Electric Field Instrument Fabrication, Integration, and Testing.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
THEMIS Pre-Confirm 02/04/040 Final Inputs Pre-Confirmation Review February 4, 2004 Probe & Probe Carrier Program Management Director of Civil and Commercial.
THEMIS : RESOLVING THE PHYSICS OF ONSET AND EVOLUTION OF SUBSTORMS OBJECTIVE: Study energy releases from Earth’s magnetosphere known as substorms (magnetic.
MPEREMC 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Probe 2 EMC Test Results David Curtis University of California - Berkeley.
Aurora, Substorms, and THEMIS D. G. Sibeck NASA/GSFC THEMIS Project Scientist.
FM4/FM5 PSRSCM - 1UCB, May 5 th, 2006 THEMIS FM4/FM5 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam University of.
THEMIS Engineering Peer Review 1 UCB, October 15-16, 2003 Electric Field Instrument (EFI) Electrical Fabrication and Test.
THEMIS-SCM - PER THEMIS Instrument Suite PERSCM- 1 UCB, May 2, 2005 Search Coil Magnetometer Alain Roux, CETP.
THEMIS peer Instrument CDR 1 CETP, Paris, April 8, 2004 THEMIS Mission Status at Peer UCB Instrument Critical Design Review UCB, April 19/20, 2004 Vassilis.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
THEMIS MPDR PM 11/12/20030 Mission PDR Cost & Schedule Review Probe & Probe Carrier Program Management Director of Civil and Commercial Space Michael Cully.
THEMIS Instrument PDRParts- 1 UCB, October 15-16, 2003 Parts Requirements Preliminary Design Review Jorg Fischer University of California - Berkeley.
THEMIS FGM CDR Peer ReviewBerlin, April 6, 2004 THEMIS FGM Engineering Peer Review SC Integration and Test Ellen Taylor University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
FM1 Instrument Suite Pre-Ship Review (PSR)Thermal-1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THERMAL Chris Smith University.
FM2 PPSRAGENDA 1 UCB, March ??, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW INTRODUCTION Paul Turin LME University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERFGM 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Fluxgate Magnetometer (FGM) Dr Ellen Taylor.
THEMIS PER 1 UCB, May 02, 2005 Magnetometer Booms Pre Environmental Review Prof. Hari Dharan Berkeley Composites Laboratory (Presenter: David Pankow) Department.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Instrument Integration & Test Dr. Ellen Taylor University of California - Berkeley.
THEMIS Instrument FM2/FM3 PERSystems- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review System Overview Ellen Taylor University.
THEMIS Project Management 1 UCB, June 14-16, 2004 THEMIS Mission CDR Project Management Peter R. Harvey University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
THEMIS MISSION PDRMAG BOOM- 1 UCB, November, 2003 Magnetometer Booms (MAGS) Mission Preliminary Design Review Hari Dharan Space Sciences Laboratory University.
THEMIS Instrument FM2/FM3 PEREnvironments- 1 Teleconference 8/30/2005 THEMIS Instrument FM2/3 Pre-Environmental Review Environments Jeremy McCauley University.
THEMIS SUITE PRE-ENVIRONMENTAL REVIEW 1 UCB May 2, 2005 THEMIS Pre-Environmental Review Instrument Verification Overview Ellen Taylor University of California.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
THEMIS INSTRUMENT PDROVERVIEW- 1 UCB, October 15, 2003 THEMIS SYSTEM OVERVIEW Dr. Vassilis Angelopoulos, Science Overview Dr. Ellen Taylor, Mission and.
F1, F3, F4, F5 PER 1 UCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Thermal Christopher Smith Thermal Engineer University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Flux Gate Magnetometer and Boom Thermal Christopher Smith Thermal Engineer
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)Magbooms- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) MAGNETOMETER BOOMS Paul.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
FM2/FM3 PSR FM4/FM5 PERSCM - 1UCB, November 10, 2005 THEMIS FM2/FM3 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) THEMIS FM4/FM5 INSTRUMENT SUITE PRE- ENVIRONMENTAL.
SPACECRAFT OVERVIEW/STATUS
THEMIS MRRI&T − 1GSFC, January 5, 2007 Integration and Test.
PARTNER / MAJOR CONTRACT Swales Aerospace MISSION MANAGER Frank Snow PRINCIPAL INVESTIGATOR Vassilis Angelopolos (UCB) UPN: Time History of Events.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 EFI Preamp Sensor G.T. Delory, A. Hull, D. Schickele, J. Bonnell & The EFI Team University of California.
MPEREnvironmental Test OverviewUCB, June 23, 2006 THEMIS MISSION PRE-ENVIRONMENTAL REVIEW Environmental Test Overview and Logistics Rick Sterling University.
FM2/FM3 IPSR AND FM4/FM5 IPERSYS - 1 UCB, November 10, 2005 THEMIS INSTRUMENT SUITE FM2/FM3 PRE-SHIP REVIEW FM4/FM5 PRE-ENVIRONMENTAL REVIEW SYSTEM OVERVIEW.
Lessons Learned Project Overview 1 Jan 29, 2008 THEMIS Introduction Jan 29, 2008.
THEMIS MRRSystems - 1 GSFC, Jan 5, 2007 Systems Engineering.
FM1 Instrument Suite Pre-Ship Review (PSR)AGENDA 1 UCB, September 21, 2005 THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
Solar Probe Plus FIELDS Instrument PDR Management Peter Harvey, PM Lindsey Hayes, DPM University of California
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 Thermal Design Christopher Smith RBSP Thermal Engineer Space.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
THEMIS IDPU PDRPCB- 1 UCB, October 16, 2003 IDPU Power Control Board (PCB) Peter Berg University of California - Berkeley.
Project Overview and Status
THEMIS Mission Confirmation Readiness
Preliminary Design Review
THEMIS MISSION PRE-SHIP REVIEW
THEMIS Introduction Nov 6, 2007.
Presentation transcript:

THEMIS Instrument Pre-Environmental Review 1 UCB 5/02/2005 THEMIS Instrument Pre-Environmental Review Project Status May 2, 2005 Peter R. Harvey THEMIS Project Manager University of California - Berkeley

THEMIS Instrument Pre-Environmental Review 2 UCB 5/02/2005 Agenda/Purpose

THEMIS Instrument Pre-Environmental Review 3 UCB 5/02/2005 Instrument Payload IDPU: Instrument Data Processor Unit SPB : Spin Plane Booms (4x) AXB : Axial Booms (2x) SST : Solid State Telescope (2x) ESA : Electrostatic Analyzer FGM : Fluxgate Magnetometer SCM : Search Coil Magnetometer

THEMIS Instrument Pre-Environmental Review 4 UCB 5/02/2005 Instrument Status Comparison of Completion.v. Need Date

THEMIS Instrument Pre-Environmental Review 5 UCB 5/02/2005 Mission Schedule CY 2005 MILESTONES CY 2004 THEMIS Bus, Instrument & Mission I&T Schedule STATUS AS OF: 4/28/05 MISSION MGR. : FRANK SNOW MAJOR REVIEWS CY P1 INTEGRATION & TEST BUS/INSTRU MECH & ELEC I&T & C/O (UCB) BUS MECH & AVIONICS BUILD UP (Swales) NDJFMA PROBE SUBSYSTEM HARDWARE 2 P2 INTEGRATION & TEST 3 P3 INTEGRATION & TEST 4 P4 INTEGRATION & TEST 5 P5 INTEGRATION & TEST 7/08 BAU EDU#2 MECH BUILDUP 7 SETUP / PROBE VIB / PCA INTEGR. (JPL) 8 PCA VIB / ACOUSTICS / THERMAL (JPL) 9 11 LAUNCH PROCESSING/LAUNCH INSTRUMENT CDR 4/19-20 MISSION CDR 6/14-18 CRR 2/04 4/06-08 HQ FGM/SCM CDR 4/22 INSTRU COMPL 5/12 6/23 8/08 PROJECT MGR. : PETER HARVEY 5/02 INSTRU COMPL 8/08 P1 PER 10/03 ENVIRONMENTAL TEST & CLOSEOUTS (JPL) 2/ P2-P5 PER 5/ PSR 10 MECH H/W -- Critical Path H/W -- Project Reserve -- Instrument Slack LEGEND -- Intermediate Slack 51 DAYS 10/19 10 DAYS 7/31 3/21 7/28 FLT 1 BAU 9/02 6 P2- P5 SHIP TO JPL PROBE SUBSYSTEM HARDWARE MJ JANDJFMA MJ J A SOSO 5/17 MECH 7/19 ELEC 8/10 SHIP to JPL 12/08- 12/16 MECH BUILDUP 6/13 MECH 1/041/27 12/16 P1 Test Review INSTRU COMPL 6/30 12/09 MECH BUILDUP 9/01 10/18 AVIONICS BUILDUP MECH 1/10 ELEC & C/O 2/03 MECH& ELEC H/W MECH BUILDUP 11/29 1/23 2/14 1/19 MECH BUILDUP 10/13 12/13 MECH 1/31 2/2 3 PROBE SUBSYSTEM HARDWARE 3/02 MISSION RESERVE MAG & MASS PROP (JPL) / SHIP 3/23 PCA INTEGR PROBE VIB 4/08 5/03 PCA THERMAL PCA VIB/ACOUSTICS 5/11 P2-5 PACK & SHIP MAG / MASS PROP 5/16 ENVIRONMENTALS 10/26 FLT BAU 11/03 9/26 FLT BAU 11/21 FLT BAU MECH& ELEC H/W MECH H/W 11/09 8/30 AVIONICS BUILD UP Swap out 5/26 Swap out ELEC & C/O 8/17 9/09 9/27 AEB 8/15 AVIONIC S BUILD UP 12/01 SHIP to UCB 10/05 12/08 BAU EDU#1 SHIP to UCB FLT BAU SHIP to UCB ELEC & C/O MECH SHIP to UCB AVIONICS BUILDUP ELEC & C/O AVIONICS BUILDUP SHIP to UCB 1/07 P1 Test Review BUS/INSTRU MECH & ELEC I&T & C/O (UCB) BUS MECH & AVIONICS BUILD UP (Swales) BUS/INSTRU MECH & ELEC I&T & C/O (UCB) BUS MECH & AVIONICS BUILD UP (Swales) BUS/INSTRU MECH & ELEC I&T & C/O (UCB) BUS MECH & AVIONICS BUILD UP (Swales) BUS/INSTRU MECH & ELEC I&T & C/O (UCB) BUS MECH & AVIONICS BUILD UP (Swales) 9/22 10/04 6/02 8/15

THEMIS Instrument Pre-Environmental Review 6 UCB 5/02/2005 Instrument Schedule CY 2005 MILESTONES CY 2004 THEMIS INSTRUMENT TOP LEVEL SCHEDULE STATUS AS OF 4/07/05 MISSION MGR. : FRANK SNOW 1 MAJOR REVIEWS IDPU DEVELOPMENT IDPU ETU DESIGN, FAB, I&T IDPU FLIGHT FABRICATION & I&T 2 EFI SPB / AXB DEVELOPMENT EFI SPB DESIGN, FAB, I&T (ETU & FLT) EFI AXB DESIGN, FAB, I&T (ETU & FLT) 3 ESA DEVELOPMENT ESA ETU DESIGN, FAB, I&T ESA FLIGHT FABRICATION & I&T 4 SST DEVELOPMENT SST ETU DESIGN, FAB, I&T SST FLIGHT FABRICATION & I&T 5 FGM DEVELOPMENT FGM ETU DESIGN, FAB, I&T FGM FLIGHT FABRICATION & I&T 6 SCM DEVELOPMENT SCM EM DESIGN, FAB, I&T SCM FLIGHT FABRICATION & I&T 8 INSTRUMENT I&T INSTRUMENT INTEGRATION & TEST MAGBOOM FLIGHT FAB & I&T FLT 1 BD FAB/ASSY COMPL BOARD I&T COMPL. IDPU ETU I &T COMPL 1/14 11/19 10/06 4/07 5/25 6/ INSTRU. CDR 4/19-20 MISSION CDR 6/ /22 CRCR A J JA S J ON DJ FLT I&T COMPL 6 5/10 1 ETU INSTRU. I &T COMPL 12/10 START FLT INSTRU I&T w/ IDPU, ESA, SST ETU 7 FGM/SCM CDR 4/06-08 MISSION MGR. : FRANK SNOW PROJECT MGR. : PETER HARVEY F M 2-3 6/21 6/10 FGE ETU DEL. To GERMANY PCB/FGE ETU I &T COMPL 7/19 3/19 3/18 12/ FLT TO IDPU FGE FLT 1-2 DEL to GER. 11/01 SC/EM I &T COMPL 3/21 1/05 PA CUBE DEL. 7/30 4/11 4/22 4/ FLT I&T COMPL FAB FLT HINGES 12/07 ETU I &T COMPL 12/063/05 6/15 5/18 6/01 ETU COMPL 6/07 9/10 2/044/18 5/02 5/ FLT I&T COMPL 11/11 FLT FAB/ASSY ETU COMPL 6/11 2/07 4/13 4/295/16 5/ FLT I&T COMPL 7/30 FLT MACH FLT 1-6 BD FAB/ASSY COMPL BOARD I&T COMPL. ESA ETU I &T COMPL DSG COMPL. 3/30 1/07 12/22 3/25 FLT I&T COMPL 2/ BOARD I&T COMPL. SST ETU I &T COMPL DSG COMPL. 9/17 6/11 3/05 5/20 3/29 4/11 4/19 4/29 5/ FLT 1 BD FAB/ASSY COMPL 12/06 6 A M 6 8/25 8/30 7/01 12/10 FGE FLT 3-5 DEL to GER. 2/02 USING SCM SIM & ESA PreAmp & IDPU BDS 8/ FLT I&T COMPL J 4/ /18 4/20 4/ / FLT IDPU FLT ESA 2/09 SC /06 5/13 5/27 5/02 6 FLT I&T COMPL