7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm.

Slides:



Advertisements
Similar presentations
Using three IR sensors, SensingBot can sense the front obstacles so it can avoid them. Sensing.
Advertisements

2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Torch electronics test environment MCP readout update.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Manual Fine-Pitch Stencil Printer
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
FanBot is a fanning robot using High-speed DC Motor. Fan.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
Temperature Controller DT3 Series & Delta Machine Vision Automation for a Changing World.
Current ILC work at Fermilab Electrical Engineering Dept.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
Status report on MURAY telescope R&D
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
AIDA 1 Mezzanine board Contacts for underside connectors Thermal contact pads.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
1 J.M. Heuser – CBM Silicon Tracking System Roadmap for the development of STS module demonstrators Concept Common interfaces/dimensions Some technical.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
1 4 PCB: LEFT TOP 115 channels, LEFT BOTTOM (115), RIGHT TOP (106), RIGHT BOTTOM (106). For LEFT TOP board 115 channels we have: 115 smd connectors (AMP.
Current Status of Pepperpot Emittance Measurement System Simon Jolly Imperial College FETS Meeting, 22/02/06.
Givi Sekhniaidze1 CERN, 25 March Givi Sekhniaidze2 The angles for the chambers are: LM1 – ° LM2 – 7.224° SM1 – ° SM2 – ° Do we.
The Mechanical Structure for the SVD Upgrade
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
C. Joram1 Demonstrating the AX-PET concept with digital Silicon PMs Cagliari, 6 October 2011 In collaboration with Philips Corporate Technologies The DSiPM.
An Idea of Next Sci-ECAL Prototype for FNAL Beamtest Feb Sci-ECAL meeting S. Uozumi (Kobe)
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
Connector Differential Receiver 8 Channels 65 MHz 12 bits ADC FPGA Receive/buffer ADC data Format triggered Events Generate L1 Primitives Receive timing.
12 September 2006Silicon Strip Detector Readout Module J. Hoffmann SIDEREM SIlicon Strip DEtector REadout Module.
Oct/07/2010Pixel PP0 opto replacement issues1 1 1 PP0 Opto Replacement Issues Philippe Grenier, Martin Kocian, Dave Nelson, Marco Oriunno, Su Dong, Charlie.
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/23/20102electro-mechanical.
Report on dummy detector Equipped with Heater & sensors NA62 GigaTracker Working Group Meeting May 24 th 2011.
Normal text - click to edit MAPD/MPPC Characterization & Axial PET 1.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
LSTs in the IFR gaps Workshop on IFR replacement SLAC November 14, 2002 L. Piemontese INFN Ferrara.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
Power Supply for DEPFET in SuperBelle Pablo Vazquez IGFAE-USC Henryk Palka INP-KRA.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
H.-G. Moser Max-Planck-Institut fuer Physik DEPFET Meeting Heidelberg Sept DEPFET Geometry for SuperBelle Sensor Geometry Pixel Pitch Constant/variable.
ELCO CONNECTOR PRODUCTS : JAPANESE AVX CONNECTOR PRODUCTS OVERVIEW Slide 3 Wire Products Memory Products Other Products ELCO Japan Products Summary.
n-XYTER Hybrid Developments
PID meeting SNATS to SCATS New front end design
Update of MVD services and requests
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Work progress in Turin x the MVD
cooling and supports of the forward endcap EMC
Activities so far Meeting at Imperial, Paul and Matt
Zhaga Books November 2016.
New MWPC for CB Status Report Oct 2004
HPGe Planar Detector Stack
Customer Presentation
KELVIN MAINTENANCE GUIDE
Testbeam status report
A Beam telescope for the EMC testbeam
Presentation transcript:

7 october 20111T. Schneider Test bench for digital sensor New Philips Digital Light Sensor Outer dimensions 32.6*32.6mm 2 8*8 pixel array Pixel pitch 4*4mm 2 Pixel active Area 3.8*3.3mm 2

7 october 20112T. Schneider Test bench for digital sensor Material available : (Leftover of 2 module assembly) 8 Lyso crystals 3*3*100mm³ one end Al coated WLS strips 3*1*40mm³ (~30) WLS strips 4*1*40mm³ (~20)

7 october 20113T. Schneider Test bench for digital sensor How can the components be arranged on the digital sensor? …and how many? Need more that 1mm space in-between the crystals in one dimension in order to fit the WLS

7 october 20114T. Schneider Test bench for digital sensor 4 row arrangement of 2*8pixels on the digital sensor + 1mm WLS spacing => Limit in one dimension to not more than2 crystals

7 october 20115T. Schneider Test bench for digital sensor Preliminary idea for mechanical setup : Mechanical housing (material to be decided: Alu/plastic) to keep sensor boards (2-3) and components in place Positioning of 4 Lyso crystals and 8 WLS One or double sided readout for crystals possible

7 october 20116T. Schneider Test bench for digital sensor 2*2 Lyso Mechanics 4*2 WLS Option: double sided Lyso read out 32 pin connector for WLS readout 32 pin connector for Lyso readout Lyso positioning WLS positioning

7 october 20117T. Schneider Test bench for digital sensor Digital sensor card is fixed in the mechanics Optical contact is foreseen via optical grease Components will be pushed slightly from the other side to guarantee good optical contact

7 october 20118T. Schneider Test bench for digital sensor Module can be turned and position to our needs Read out connectors stay accessible

7 october 20119T. Schneider Test bench for digital sensor 2*2 arrangement of Lyso crystals 4*2 arrangement of WLS Separation needed between Lyso, WLS  Lyso, WLS ?

7 october T. Schneider Test bench for digital sensor Simple solution for component positioning : 2 thin plastic plates with precise slit machining arranged in 90deg will guarantee the x/y positioning of Lyso and WLS Components will be kept in place on both ends, fixed to the mechanics

7 october T. Schneider Test bench for digital sensor Ideas? END! Discussion Proposals