CDC Baseline design  Chamber radius  Wire configuration  Main parameters  Electronics Summary Shoji Uno (KEK) July-4 th, 2008.

Slides:



Advertisements
Similar presentations
The Belle Silicon Vertex Detector T. Tsuboyama (KEK) 6 Dec Workshop New Hadrons with Various Flavors 6-7 Dec Nagoya Univ.
Advertisements

1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
1 FPCCD Vertex Detector for ILC Yasuhiro Sugimoto  Concept of FPCCD VTX  FPCCD prototype  VTX inner radius.
Workshop on Synergy between High Energy and High Luminosity Frontiers. January 10-12, 2011 Tata Institute of Fundamental Research, Mumbai, India Detector.
GEM Detector Shoji Uno KEK. 2 Wire Chamber Detector for charged tracks Popular detector in the particle physics, like a Belle-CDC Simple structure using.
The Belle II Silicon Vertex Detector Readout Chain Markus Friedl (HEPHY Vienna) TWEPP2012, 19 September 2012.
Gas-based tracking for SuperBelle Beam background Upgrade plan Summary Shoji Uno (KEK) April, 20-22, nd Joint Super B factory WS in Hawaii.
Drift chamber for super-Belle Present performance and background Idea for upgrade Upgrade plan Summary Shoji Uno (KEK) Jan-20 th, 2003 at Super B-factory.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
Belle Upgrade Plan - An Overview - M.Yamauchi KEK January 2004 Super B Factory Workshop University of Hawaii, Honolulu.
Drift Chambers Drift Chambers are MWPCs where the time it takes for the ions to reach the sense wire is recorded. This time info gives position info:
CDC Summary Shoji Uno (KEK) July-8, Baseline Design Belle sBelle.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Calorimetry: a new design 2004/Sep/15 K. Kawagoe / Kobe-U.
1 LEPS TPC Electronics 章文箴 Wen-Chen Chang Institute of Physics, Academia Sinica 03/30/2001.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Ivan Vitev & E906 Muon Identifier Status Patrick McGaughey and the muon radiography team E866 Meeting at FNAL June 20-21, 2007 Large Muon Tracker at LANSCE.
Super Belle CDC Basic design Electronics  Test of pre-amplifier chips Wire stringing method Schedule Shoji Uno (KEK) Dec-12 th, 2008.
Detectors and read-out DetectorNo. of ch.Read-out method Device candidates CsI(Tl)768Flash ADCCOPPER + 65 MHz FADC FINESSE Active Polarimeter600 x 12 x.
The CLEO-c Detector Steve Gray Cornell University BESIII Workshop January 13, 2004.
Welcome to the 1 st Open Meeting of the Super KEKB Collaboration. (T. Browder, University of Hawaii) [All talks and discussions about the detector, physics.
CDC readout system status MT 2009 July 7. BELLE II CDC readout electronics CDC.
Performance of the AMT-3 Based TDC System at Belle S.Y.Suzuki, T.Higuchi, Y.Arai, K.Tauchi, M.Nakao, R.Itoh (KEK) H.Nakayama (University of Tokyo)
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
Front-end readout study for SuperKEKB IGARASHI Youichi.
PID for super Belle (design consideration) K. Inami (Nagoya-u) - Barrel (TOP counter) - Possible configuration - Geometry - Endcap (Aerogel RICH) - Photo.
A Silicon vertex tracker prototype for CBM Material for the FP6 Design application.
Vertex detector for the KEK B factory upgrade Toru Tsuboyama (KEK) 1 March 2008 Instr08 Novosibirsk.
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
A Study of Proton-Proton Collisions at the LHC The Ohio State University - Task A.2 B.G. Bylsma, L.S. Durkin, D. Fisher, J Gilmore, J.H. Gu, D. Larson,
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
CDC S. Uno KEK Endplate Design sBelle 250mm 300mm 350mm.
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Study of a charge distribution on a readout board with a triple GEM chamber MPGD group T. Uchida, M. Sekimoto, T. Murakami, M. Tanaka, S. Tanaka, N. Ujiie,
FPCCD VTX Overview Yasuhiro Sugimoto KEK Tokubetsu-Suisin annual meeting 11.
Jan24-26, 2008BNM2008 Atami, Japan1 Belle upgrade: Tracking and Vertexing T.Kawasaki(Niigata-U)
Development of a Vertex Chamber with using GEM Yutaka Mizoi Osaka Electro-Communication University Colleagues; Tomokazu Fukuda, Shizu Minami, and Wataru.
R&D Status and plan for FPCCD VTX Yasuhiro Sugimoto
WG3 – STRIP R&D ITS - COMSATS P. Riedler, G. Contin, A. Rivetti – WG3 conveners.
1 CDC Readout - upgrade for Higher Luminosity - Y.Sakai (KEK) 29-Oct-2002 TRG/DAQ Review of Status/Plan (based on materials from S.Uno/M.Tanaka)
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
CDC Upgrade Beam background Simulation study Idea for upgrade Upgrade plan Summary Shoji Uno (KEK) Mar-20 th, 2008.
J-PARC での高輝度 ビームに向けた GEM トラッカーの 開発 小沢 恭一郎 ( 東大・理 ) KEK 測定器開発室 Supported by 科研費.
( ATLAS was designed for LHC: L=10 34 cm -2 s -1 ) [ Now we expect 7.5 x instantaneous and 10 x integrated luminosity ] PILEUP: from ~30  >200 proton.
The Collider Detector at Fermilab (aka CDF) Jennifer Pursley Intermediate Seminar Oct. 28, 2003.
Evelyn Thomson Ohio State University Page 1 XFT Status CDF Trigger Workshop, 17 August 2000 l XFT Hardware status l XFT Integration tests at B0, including:
Jan. 25, 2011 Status of the Aerogel RICH Readout Trig/DAQ Meeting in Beijing 1 S. Nishida (KEK) S. Nishida Status of the Aerogel RICH Readout Belle II.
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
Power Supply for DEPFET in SuperBelle Pablo Vazquez IGFAE-USC Henryk Palka INP-KRA.
Particle Identification of the ALICE TPC via dE/dx
1 Preliminary Considerations on Tracking for HIEPA Yifei Zhang and Jianbei Liu University of Science and Technology of China Workshop on Physics at Future.
B-KLM DAQ 2011/01/25 Trigger/DAQ workshop K. Sumisawa (KEK) Introduction Summary +7 pages.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
FEE for TPC MPD__NICA JINR
 Silicon Vertex Detector Upgrade for the Belle II Experiment
The Ohio State University
Structure and etc Shoji Uno (KEK) at B2GM
STT Status & News Peter Wintz (FZ Jülich) for the STT group
Future Plan of the Neutral Kaon Spectrometer 2 (NKS2) Experiment
Japan Participation in Phase-II TDAQ Upgrade
Development of Hard X-ray Detector with GEM
Upgrade of the ATLAS MDT Front-End Electronics
CDC Structure S. Uno KEK
L H C A T L A S International Collaboration on the LHC Project
CDC structure Shoji Uno (KEK)    July-8, 2009.
Presentation transcript:

CDC Baseline design  Chamber radius  Wire configuration  Main parameters  Electronics Summary Shoji Uno (KEK) July-4 th, 2008

Baseline design CDC SVD

Chamber Radius Inner radius  Physics : Vertexing efficiency using Ks  SVD determines the boundary.  At present, the boundary is 15cm in radius. Outer radius  New barrel PID device determines the outer radius.  At present, 115cm is selected, tentatively. The boundary condition is important to start construction.  Basically, CDC can manage any radius.

Wire configuration 9 super-layers : 5 axial + 4 stereo(2U+2V)  A 160*8, U 160*6, A 192*6, V 224*6,  A 256*6, U 288*6, A 320*6, V 352*6, A 388*8 Number of layers : 58 Number of total sense wires : Number of total wires : ~60000

Main parameters Present Future Radius of inner boundary (mm) Radius of outer boundary (mm) Radius of inner most sense wire (mm) Radius of outer most sense wire (mm) Number of layers 5058 Number of total sense wires Effective radius of dE/dx measurement (mm) Gas He-C 2 H 6 Diameter of sense wire (  m) 30

About readout electronics At present,  S/QT + multi-hit TDC  S/QT : Q to Time conversion  FASTBUS TDC was replaced with pipeline COPPER TDC. Three options,  High speed FADC(>200MHz)  Pipeline TDC + Slow FADC(~20MHz)  ASD chip + TMC(or new TDC using FPGA) + slow FADC near detector. ASIC group of KEK Detector Technology Project is developing new ASD chip. New TDC using FPGA is one candidate for TDC near detector.

ASD chip Gain : ~ 7V/pC Integration time : 1nsec 1/t tail cancel. PZC 20nsec Fe keV X-ray

Summary When Belle group decides the upgrade plan, we can start construction of the new chamber soon.  It takes three years to construct the chamber. Outer radius( and inner radius) should be fixed as soon as possible.  Barrel PID determines the schedule.  Inner radius should be determined by SVD.  Supporting structure should be discussed. One big worry is man power.  No one come to the meeting room today morning.  I hope many people join us when the upgrade plan starts.