c fingler - bc hydro 1998 PI User's Conference 25 March.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Serving PI in a Geospatial World Amie Evans Seattle Regional Seminar November 10, 2009.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
PacifiCorp-CAISO EIM Initiative Overview
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
© EnerNOC Inc. Managing Energy Price Risk in PA AFCOM Mid-Atlantic December 10, 2010.
Solutions to California’s Energy Crisis: Real-Time Pricing by Frank Wolak Chairman, Market Surveillance Committee March 17, 2001.
Utility Monitoring System Overview AH&MA Annual Conference & Leadership Forum April 5, 2001 Chicago, IL Brian Burke, CEM Energy Manager.
1 Anglian Water - Sewernet David Singerton, Innovation Projects Manager Evolving an Extreme Rainfall Management system Sewernet proposals 20 th November.
Integration of Large-Scale RES in Island Power Systems Prof. Nikos Hatziargyriou, National Technical University of Athens
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Fleet Optimization Through Process Information Regional Seminar Series.
PI-The Backbone of Conectiv Energy’s Generation Asset Management. Amit Mahajan And Paul Wassil.
Brooklyn Navy Yard Cogeneration Partners
1. PROJECT GOAL Our final product will be an interactive public website which will allow the user to view various aspects of our current and future infrastructure.
EU policy objectives and European research on Smart Grids European Commission, DG Research Henrik Dam Research Programme Officer ADDRESS international.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
Barbara Tolić, HEP Trgovina d.o.o. SEECOFF , Belgrade.
ADDED VALUE APPLICATIONS ~ ENABLED THROUGH PI Jerry Weber, Thermal Performance Specialist Frank Borth, Performance & Data Engineer Wayne Benedeck, Thermal.
Fleet Performance and Reliability in Generation Utilities
contents INTRODUCTION. HYDRO POWER PLANT IN INDIA. WORKING.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
1 © 2008 OSIsoft, Inc. | Company Confidential Edison Mission Energy: PI for the Next Generation (of Generation) OSI Regional User Conference 10/09/08 Jerry.
© 2009 IBM Corporation Let’s Build a Smarter Planet Thongchai Watanasoponwong – Country Manager Power Systems, STG September 15 th, 2009 Green IT เทคโนโลยีสีเขียวเพื่อสิ่งแวดล้อม.
Avista’s Flexibility Overview James Gall Senior Power Supply Analyst Contact:
NGEIR Technical Conference Presentation May 16, 2006.
Energy Business Solutions A Real-Time Enterprise Solution for Guohua Electric Power Corporation.
© Vattenfall AB Managing the Business of Hydropower Nils Andersson, Vattenfall Group Function Communication.
PI – An Enterprise Integration Tool Mark Brown – Calpine Corporation Mark Bowles – Calpine Corporation Sam Jenkins – Calpine Corporation.
Empowering Business in Real Time. © Copyright 2009, OSIsoft Inc. All rights Reserved. The Use of PI at International Power Regional Seminar Series Lee.
OSI Regional Seminar 2008 Presented by: Kasen Huwa Sr. System Analysts, Xcel Energy Use of PI Process Book and Datalink Client tools for Energy Market.
Working to Succeed with an Operations Information System OSI Users’ Conference Working to Succeed with an Operations Information System OSI Users’ Conference.
1 BC Generation Overview Central Asia Delegation 30 January 2013 Doug Robinson Canadian Entity Secretary BC Hydro - Generation.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
1 WHOLESALE ELECTRICITY MARKET AN OVERVIEW By:Ag. Manager, Market Operations.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
PI at NB Power Presented by Steve Boyko. Introduction About NB Power Our PI history Current PI status Specific PI applications Future PI applications.
Power Generation Power Generation Commercial Monitoring at ESB, Ireland. OSI Pi Conference San Francisco April 2004.
1 Overview of Asia Pacific Markets APEx Conference 2008 Sydney Presented by Dave Carlson Chief Executive Officer, Energy Market Company, Singapore.
Using PI as a Transitioning Tool to RTPM A presentation by Calpine Geothermal for the 2004 OSI Users Conference A presentation by Calpine Geothermal for.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
OSIsoft User Conference Monterey, March 2002 Collaborative Manufacturing Haldor Topsøe Using PI to Improve Diesel Hydrotreater Performance & Summary of.
NEMMCO Bryan Connell Terry Day. Copyright © 2007 OSIsoft, Inc. Company Confidential. All rights reserved. 2 NEMMCO was established in May 1996 to implement,
Technology for demand side management and demand side bidding for grid companies. Stig Fretheim 15. Mai 2003.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
Kiran Barn, PI Users Conference 2000Slide 1 Kiran Barn, Principal Engineer. Slide 1Kiran Barn, PI Users Conference 2000.
Using CIM and PI AF for Model-Driven Asset Management Darren Brungardt Kansas City Power & Light.
Managing Reliability and the Markets with PI
1 UNIÓN FENOSA IT STRATEGY ADAPTATION TO THE CHANGES IN THE BUSINESS ENVIRONMENT Mr. David Andrés Hurtado Mining Engineer Soluziona Spain San Francisco,
The Future for Power Sector Regulation in Ontario Jan Carr Vice Chair, Ontario Energy Board APPrO Canadian Power Conference & Trade Show November 24, 2004.
Using PI to Monitor Hydroelectric Control Systems Presented by Jeff Mettler Chelan County PUD Wenatchee, WA
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Building Control System (Metasys) Project Status David J. Ritchie CDO/Operations March 18, 2003.
PI in a Modern Power Plant – American National Power, Inc. PI User Conference ‘03 Presented by: Brian M. Wood, American National Power, Inc More Uses Than.
Illinois Wholesale Market Update December 10, 2003.
Market Monitoring: The Role of OMOI and MMUs Presented to: Energy Markets at the Crossroads Springfield, Illinois December 12, 2002 By: Lisa L. Carter.
How AEP is Approaching the Information Management Crisis by Leveraging OSIsoft’s Suite of Tools Bill Sigmon Sr. Vice President Fossil and Hydro Generation.
Control Systems Design Part URS Slovak University of Technology Faculty of Material Science and Technology in Trnava 2007.
Vision of an Integrated Global Observing System Gregory W. Withee Assistant Administrator for Satellite and Information Services National Oceanic and Atmospheric.
Wholesale Electricity Markets: Opportunities and Challenges Howard HaasUSAEE October 27, 2015.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
PEPCO’s Experience with Historian EMS Users Group March 14, 2000 Potomac Electric Power Company.
Innovativeness-performance link. Discovery Define product innovation and technology strategy Prepare profit pool maps Perform an environmental context.
UNEP Collaborating Centre on Energy and Environment Use and Conceptualization of Power Sector Baselines: Methodology and Case Study from El Salvador Lasse.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
Kesler Engineering Component Software: Using ActiveX Object Modeling with PI PI System User’s Conference March 1999.
Cognos BI. What is Cognos? Cognos (Cognos Incorporated) was an Ottawa, Ontario-based company that makes Business Intelligence (BI) and Performance Management.
Wind Development & Policy Options
Using CIM and PI AF for Model-Driven Asset Management
Presentation transcript:

c fingler - bc hydro 1998 PI User's Conference 25 March

BC Hydro Power Supply n Power Supply operates: ä 61 dams ä 32 Hydroelectric Stations (10,500 MW) ä One Gas-fired Thermal Station (960 MW) ä Two Combustion Turbine Stations (60 MW) n BC Government owned n Deregulation

c fingler - bc hydro 1998 PI User's Conference 25 March BC Hydro Power Supply Power Supply Mission To be the supplier of choice by providing our customers with competitive energy products and services while being profitable and socially responsible. Vision Statement Power Supply will compete profitably in any energy market structure.

c fingler - bc hydro 1998 PI User's Conference 25 March Powerex n BC Hydro subsidiary n Responsible for electricity trading n Contract (long-term) n Pre-schedule (next day) n Spot (next hour)

c fingler - bc hydro 1998 PI User's Conference 25 March Power Supply Operations Reservoir Levels Domestic Load Market Opportunity Environmental Impact Maintenance Outages Weather, Inflow forecasts System energy, capacity Real-Time Dispatch Next Hour - next day Next Day - next year TIME DOMAIN Historical

c fingler - bc hydro 1998 PI User's Conference 25 March Situations to avoid on your shift

c fingler - bc hydro 1998 PI User's Conference 25 March Why Real-Time Data Tools? n EMS system monitors many data points n Deregulation - functional separation of T&D from Power Supply - “firewall” n FERC Standard of Conduct requirement n Need for a system to interrogate EMS in real-time for generation-related data, compatible with BCH computing strategy

c fingler - bc hydro 1998 PI User's Conference 25 March WHY PI ? n good fit with BCH direction for computer platforms & Goal Technology Architecture (PC & OLE) n previous interface with L&G EMS computer n Firewall from EMS, archive capability, excel links (PI-DL) & user-buildable display tool (PI-PB)

c fingler - bc hydro 1998 PI User's Conference 25 March AGC PLANTS OVERVIEW

c fingler - bc hydro 1998 PI User's Conference 25 March

Plant Trends

c fingler - bc hydro 1998 PI User's Conference 25 March TRENDS Multistate ElementsWORD.doc OLE EXCEL.xls OLE ODBC Datasets Linked PB Display

c fingler - bc hydro 1998 PI User's Conference 25 March ! Raw Data FB, MW PI Servers Plant_Status C (Background) Plant_Monitor VB Desktop PC Limits.txt Control.txt Generate Alarm Visual, Audible FB,MW Tags Status Flags FB,MW Tags Multi-state Elements

c fingler - bc hydro 1998 PI User's Conference 25 March PI-DL PI-PB PI-API PI-DL PI-PB PI-API PI-PB PI-API PI-DL

c fingler - bc hydro 1998 PI User's Conference 25 March

“BAD OPERATION” H/k = 0.35

c fingler - bc hydro 1998 PI User's Conference 25 March “GOOD OPERATION” H/k = 0.34

c fingler - bc hydro 1998 PI User's Conference 25 March H/k = 0.35

c fingler - bc hydro 1998 PI User's Conference 25 March Future Development n Operations: ä Sophisticated alarming (PI PB2.0) ä Implementation of optimizer models ä Ancilliary services n Business Transition Program: ä Plant Data Collection Nodes ä MCM - predictive maintenance ä Interface to commercial management system

c fingler - bc hydro 1998 PI User's Conference 25 March THANK YOU ! www.

c fingler - bc hydro 1998 PI User's Conference 25 March