PM Report AS 20.04.2011 ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc.

Slides:



Advertisements
Similar presentations
Jan 28, 2009CFS-GBL meeting 1 PM report Jan 28, 2009: Reviews –AAP –PAC (May 9 and 10, 2009) Meetings –TILC09 FALC –Madrid, Jan 19, 2009.
Advertisements

Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Nick Walker Marc Ross Akira Yamamoto ALCPG’11 Eugene Oregon GDE Project Management Summary ALCPG Eugene, Nick Walker 1.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Nick Walker, Brian Foster LAL, Orsay WP2: Coordination with the GDE.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
John Carwardine 22 June 2012 TEB webex meeting. Agenda Management items (John) –General updates, status of submissions –Principle Editor assignments for.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
Nick Walker for the Project Management ILC AD&I: Introduction and Overview.
AS TAG Leaders Meeting PM Report. Topics R&D Plan release 4 ADI WebEx meetings (cost and design) Central region integration face-to-face meetings.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
Project Management: Nick Walker Akira Yamamoto Marc Ross ILC AD&I: Introduction and Overview 02/12/2009.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
CFS / Global – 04 Aug, 2010 PM Report: SB2009: –ADI meeting 23.07: Parameter tables with low energy / low power operation –BA Workshop Planning CFS participation.
November 05, 2008CFS-GBL meeting 1 PM report Nov 5, 2008: 0) ILC08 plenaries 1) Summary of Pac review 2) Report on ttc and barc (india) 3) Summary of positron.
ILC Damping Rings Electron Cloud Working Group Meeting Introduction S. Guiducci (LNF) ECLOUD10, Cornell 13 October
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
1 ILD Workshop purpose and scope Yasuhiro Sugimoto May 23,
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
PHG - AD&I DESY - May 29, 2009 ILC - Global Design Effort 1 Cost Estimating for the AD&I Studies X Differential Estimates What we need from you! Peter.
DR Layout Description ILC DR Technical Baseline Review Frascati, July 7, 2011 Mark Palmer Cornell University.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Top-Level Change Control (TLCC) Process by which specific themes from SB2009 will be developed and refined –Extension of established AD&I process Formal.
Global Design Effort Main Linac Technology System Kick-off Meeting Cavity Summary 20 Sept 2007 DESY Marc Ross.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
Accelerator Systems TAG Leaders’ Meeting PM Report –Planning for ALCPG –TDR preparations: Area System Baseline Technical Reviews –Recent e+ workshop experience.
Global Design Effort - CFS ILC Source/RTML/BDS + MDI Technical Baseline Review October ILC SOURCES/RTML/BDS + MDI TECHNICAL BASELINE.
Global Design Effort1 September 20-22, 2006 MAC Review Response to 1 st MAC Mtg Barry Barish GDE.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
ML-SCRF: Monthly WebEx Meeting April 4, Reports from PMs (20 min.) GDE activity and meeting plan Summary document of SCRF-Baseline Technical Review.
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
TDR Technical Editorial Board Webex meeting, 16 th Dec 2011 Report from the Chair (John) Technical Editing reports (Benno, Maura) Review of TDR Outlines.
1 AS TAG Leaders Meeting Webex - Friday S. Guiducci, M. Palmer.
SCRF Monthly WebEx Meeting March 9, Report from PMs (15 min.) 1.Acknowledgements for completing S1-Global cold/RF test (A. Y.) 2.GDE meeting plan.
26-Sept-11 LCWS - Granada Global Design Effort 1 Barry Barish LCWS11 - Granada 26-Sept-11 Global Design Effort ILC R&D and Technical Design Grooved Insert.
AS Webex meeting – January 27, 2010
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
Plan for the First Baseline Assessment Workshop (BAW-1) Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers to be discussed at GDE/ADI.
July 11, 2008M Ross for PM - ILC GDE - ILCDR08 closeout 1 GDE Program for the ILC Technical Design Phase Marc Ross for: Akira Yamamoto, Nick Walker GDE.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Agenda items TEB activities at KILC TDR SVN repository roll-out
Oct 22 Group Leaders Planning meeting
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Barry Barish LCWS10 - Beijing 26-March-10
SCRF Monthly WebEx Meeting Sept. 22, 2010
Yamamoto WG3: ML-SCRF Parallel Session,
Technical Design Report preparation
Barry Barish LCWS10 - Beijing 26-March-10
Nick Walker for the Project Management
Barry Barish JSPS - Sendai 12-Sept-11
Barry Barish Paris ICHEP 24-July-10
Presentation transcript:

PM Report AS ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design –Marc on FLASH 9mA –Peter G. on costing (likely his last PAC report for GDE) Fixed TDR Baseline Review dates PM to meet with XFEL (28-29 April) Prep DR TDR Review INFN and Prep 9mA Workshop DESY (John) 20/04/2011 PM Report - AS webex 1

Request for information to SRF industries 12 each GDE Plan: 1) Receive initial responses before PAC review; 2) Provide a common forum for discussion (24 July Chicago, prior to SRF2011); 3) Develop the scope of cost estimate effort (to end 2011) Goal: Replace the RDR estimate – which was based on DESY / TESLA studies 20/04/2011 PM Report - AS webex 2

TDR Technical Baseline Reviews Dates and venues: Physics and Detector to be represented 20/04/2011 PM Report - AS webex 3

Planning for the TDP Risk Mitigating R&D Re-Baseline (CC) AD&I (TLCC) AD&I (TBR*) TeV upgrade study Update VALUE estimate Tech. Risk Assessment PIP Write TDR report(s) 20/04/2011 PM Report - AS webex 4 * Technical Baseline Reviews You are here!

TDP Key Focus (beyond R&D) 20/04/2011 PM Report - AS webex 5 Highest Priority (new estimate) High Priority (updated estimate) RDR update Documentation (scaled estimate) CFS requirements critical input

TDR Prep Review Meeting Goals: Review the TDP R & D and summarize progress and plans. Review the system design –including a change control procedure so that key design changes can be discussed openly –The updated baseline will be used for the TDR plan and cost estimate. Review the system cost –For SCRF and CFS, additional meetings, parallel sessions etc are also required. Review system interface criteria; –for example, requirements to CFS Review supporting documents for inclusion in the EDMS Discuss TDR preparation plans. –Upon the completion of the review, we should be able to publish a plan for producing that part of the TDR; resources, milestones, etc The review to be accessible to the community 20/04/2011 PM Report - AS webex 6

Topics for System Design Review Review the TDP R & D and summarize progress and plans. Review the system design –including a change control procedure so that key design changes can be discussed openly Example topics: 1.Cavity pairing – Power Distribution System. 2.Marx modulator 3.RDR HLRF fallback 4.RTML RF design and civil design. 5.Tunnel diameters 6.Power dissipation in the tunnel 7.DRFS components 8.Optimization of Positron production parameters: 1.undulator length and field; 2.polarization collimator space 20/04/2011 PM Report - AS webex 7

CFS – DR Review Preparation CFS should meet with AS groups via webex, starting May 2011, and process the list of questions –(should have no new questions at Baseline Review) –Started ALCPG11 –See questions from Emil for e+ (posted) –shown June in DR TDP-II schedule Tuesday weekly meeting topic? 20/04/2011 PM Report - AS webex 8

DR TDP-II Schedule 20/04/2011 PM Report - AS webex 9

DR Agenda Thursday, July 7 Morning Session Introduction DR Parameter Specifications Baseline Lattice Choice TDP R&D Progress/Plans Afternoon Session Interfaces to Adjacent Area Systems Layout & CFS Interface Friday, July 8 Morning Session Documentation Costing Afternoon Session TDP-II Schedule Review Closeout EDMS Session 20/04/2011 PM Report - AS webex 10

AD I notes – ) We should produce a written, prioritized, list of specific topics for discussion DR TAG and the PM (AND CFS) to be merged timing constraint concerns 2) 'final' all-system review where interfaces and dependencies are discussed. 3) term: 'WBS' in AD&I and ALCPG to refers the outline structure to be used for organizing documents in EDMS. 4) We will devote the 25 May ADI meeting to the 1 Tev upgrade. 20/04/2011 PM Report - AS webex 11