CERN R. Jacobsson Between LHC and the Grid - Aspects of Operating the LHC Experiments – T. Camporesi, C.Clement, C. Garabatos Cuadrado, L. Malgeri, T.

Slides:



Advertisements
Similar presentations
The Control System for the ATLAS Pixel Detector
Advertisements

CWG10 Control, Configuration and Monitoring Status and plans for Control, Configuration and Monitoring 16 December 2014 ALICE O 2 Asian Workshop
Clara Gaspar on behalf of the LHCb Collaboration, “Physics at the LHC and Beyond”, Quy Nhon, Vietnam, August 2014 Challenges and lessons learnt LHCb Operations.
Yasmine Amhis EPFL Yasmine Amhis EPFL Status of the LHC and LHCb Adrenaline.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
Olivier Callot LHCb commissioning What had to be done Technical challenges Before first beam: Cosmics First beams TED shots Circulating beam What will.
J. Leonard, U. Wisconsin 1 Commissioning the Trigger of the CMS Experiment at the CERN Large Hadron Collider Jessica L. Leonard Real-Time Conference Lisbon,
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
First year experience with the ATLAS online monitoring framework Alina Corso-Radu University of California Irvine on behalf of ATLAS TDAQ Collaboration.
Beam profile measurements based on modern vertex detectors and beam-gas interactions Slides from: Colin Barschel - TIPP 2014 third international conference.
Designing a HEP Experiment Control System, Lessons to be Learned From 10 Years Evolution and Operation of the DELPHI Experiment. André Augustinus 8 February.
LOGO OPERATING SYSTEM Dalia AL-Dabbagh
6. Shift Leader 1. Duties 2. Golden Rules 3. Cold Start 4. FSM Concepts 5. Novelties Fill Preparation LHCb State Control 8. Operational.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
1 Luminosity monitor and LHC operation H. Burkhardt AB/ABP, TAN integration workshop, 10/3/2006 Thanks for discussions and input from Enrico Bravin, Ralph.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
Daniela Macina (CERN) Workshop on Experimental Conditions and Beam Induced Detector Backgrounds, CERN 3-4 April 2008 Experiments protection from beam failures.
Status of Data Exchange Implementation in ALICE David Evans LEADE 26 th March 2007.
Copyright © 2000 OPNET Technologies, Inc. Title – 1 Distributed Trigger System for the LHC experiments Krzysztof Korcyl ATLAS experiment laboratory H.
R. Jacobsson Real-time monitoring of ambient dose equivalent rates in the LHCb cavern. Three monitors show the radiation in the service cavern UX85-A which.
CERN R. Jacobsson CERN 16 th IEEE NPSS Real Time Conference, Beijing, China, May 10–15, LHCb Readout System and Real-Time Event Management - Emphasis.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
CERN Real Time conference, Montreal May 18 – 23, 2003 Richard Jacobsson 1 Driving the LHCb Front-End Readout TFC Team: Arek Chlopik, IPJ, Poland Zbigniew.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
07-JUL-2003LEADE / JW1 Satellite bunches in the LHC Satellite “definition” Satellite luminosity Satellite detection & tolerances J. Wenninger AB/OP.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
1 The Operation of the LHC detectors LPCC student lectures CERN June 29 th 2010 Special thanks to T. Camporesi, C. Garabatos Cuadrado, T. Pauly, W. Kozanecki,
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
LHCb DAQ system LHCb SFC review Nov. 26 th 2004 Niko Neufeld, CERN.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Handshake with the experiments 04/09/20091 R. Alemany (BE/OP/LHC) LHC Experiments Handshake.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
A Super-TFC for a Super-LHCb (II) 1. S-TFC on xTCA – Mapping TFC on Marseille hardware 2. ECS+TFC relay in FE Interface 3. Protocol and commands for FE/BE.
PhD Student, Federico Alessio Directeur de thèse, Renaud Le Gac Superviseur de thèse, Richard Jacobsson, CERN Beam and Background Monitoring and the Upgrade.
6. Shift Leader 1. Introduction 2. SL Duties 3. Golden Rules 4. Operational Procedure 5. Mode Handshakes 6. Cold Start 7. LHCb State Control 8. Clock Switching.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
LHCb report to LHCC and C-RSG Philippe Charpentier CERN on behalf of LHCb.
Alignment in real-time in current detector and upgrade 6th LHCb Computing Workshop 18 November 2015 Beat Jost / Cern.
18/05/2000Richard Jacobsson1 - Readout Supervisor - Outline Readout Supervisor role and design philosophy Trigger distribution Throttling and buffer control.
Online Consumers produce histograms (from a limited sample of events) which provide information about the status of the different sub-detectors. The DQM.
LHCbComputing Computing for the LHCb Upgrade. 2 LHCb Upgrade: goal and timescale m LHCb upgrade will be operational after LS2 (~2020) m Increase significantly.
Markus Frank (CERN) & Albert Puig (UB).  An opportunity (Motivation)  Adopted approach  Implementation specifics  Status  Conclusions 2.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
AEM, Sept Frank Chlebana (Fermilab) Status of the LHC and CMS Frank Chlebana (Fermilab) All Experimenter’s Meeting Sept
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
LHCb 2009-Q4 report Q4 report LHCb 2009-Q4 report, PhC2 Activities in 2009-Q4 m Core Software o Stable versions of Gaudi and LCG-AA m Applications.
CHEP 2010 – TAIPEI Robert Gomez-Reino on behalf of CMS DAQ group.
The LHCb Online Framework for Global Operational Control and Experiment Protection F. Alessio, R. Jacobsson, CERN, Switzerland S. Schleich, TU Dortmund,
First collisions in LHC
Fabio Follin Delphine Jacquet For the LHC operation team
«The past experience with JCOP in ALICE» «JCOP Workshop 2015» 4-5 November 2015 Alexander Kurepin.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Hand-shake Signals Between LHC Machine and Experiments
Electronics, Trigger and DAQ for SuperB
ProtoDUNE SP DAQ assumptions, interfaces & constraints
Toward a costing model What next? Technology decision n Schedule
Update on ALICE-LHC interfaces & BCM
The LHCb Run Control System
LHCCWG Meeting R. Alemany, M. Lamont, S. Page
Summary of Week 16 G. Arduini, J. Wenninger
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Commissioning of the Beam Conditions Monitor of the LHCb Experiment at CERN Ch. Ilgner, October 23, 2008 on behalf of the LHCb BCM group at TU Dortmund:
Beam Interlocks for Detectors and Movable Devices
The LHC Beam Interlock System
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

CERN R. Jacobsson Between LHC and the Grid - Aspects of Operating the LHC Experiments – T. Camporesi, C.Clement, C. Garabatos Cuadrado, L. Malgeri, T. Pauly, R. Jacobsson 1 *Already opened by Stefano Radaelli:

CERN R. Jacobsson Experiments have never in the past been so tightly connected to the accelerator What’s so special about LHC? 1.Stored energy 2 x 360 MJ and fragile detectors Experiment protection Operational communication and procedures  Reliability requires direct communication interfaces 2.High interaction rate and large events size Fast and reliable readout, storage and transfer to offline processing Fast feedback from Data Quality checking 3.High intensity proton collider and sensitive detectors Monitoring and understanding/analyzing/optimizing experimental conditions Luminosity determination 4.Long-term detector stability and aging due to radiation Automatic Calibrations 5.Many years of 24h operation with few people and non-experts Operating the whole detector from one console  Understandable high-level tools for diagnostics, alarms and data monitoring  Homogeneity in the system  Shifter training These lectures will describe largely how we have addressed and solved these 2

CERN R. Jacobsson l At all levels we need tools to predict, prevent, and limit “non-bb” exposure  Framework to combine information and understand correlations between background, beam characteristics and machine settings  Dedicated archiving and analysis tools  We need to look at the entire LHC machine 3 Instantaneous damage Beam Interlock Background ………….…………Trigger rates…………………… ………...………..Poor data quality………………… ……………………..….Single event upsets………. …………..……Accelerated aging……….………… …………………Long-term damage……………..... Online monitoring Accumulated dose and Luminosity Background Beam characteristics Machine settings Halo/beam-gas/………………....…….scraping……………....Beam incident

CERN R. Jacobsson 4

CERN R. Jacobsson 5

CERN R. Jacobsson 6 Readout Supervisor LHC accelerator Beam Phase and Intensity Monitor Subdetectors High Level Trigger Farm L0 trigger RS Event Bank Multi Event Requests Bunch currents Filling scheme Clock/orbit, UTC, LHC Info Filling Scheme Lumi Scan HW and run parameters Run statistics Online Luminosity Detector status L0 Decision RO Electronics Trigger Throttle Timing/Synch.ctrl FE Electronics Timing/Synch.ctrl  Readout Supervisor is the intelligent readout controller The “Orchestra Director” Completely based on Field Programmable Gate Logic devices Pool of RSs for autonomous stand-alone running of any subdetector

CERN R. Jacobsson 7  Detector Performance, Readout Performance and Data Quality Histogram collected from all systems Monitoring Farm spying on event streams at best effort  Also produces histograms from an online reconstruction at best effort Histogram analysis  Automatic checks and alarms Histogram inspected by Data Manager Shifter Calib Histogram Handling (ECS) Automatic Histogram Analysis Interactive Presenter

CERN R. Jacobsson 8 Online 35 = 70 MB/s or 2 GB file(~60 kevts) / 30s Offline Tier-0 / 1 Tier-2 Storage (CASTOR) Reconstruction Simulation Stripping Analysis HLT Bulk Stream Express Stream 5 Hz Storage (CASTOR) Reconstruction Calibration Alignment QC Offline Control Room 20h/file, 20 kB/evt Bookkeping Data and Production Management Data Quality Checking Test Jobs QC Run Info Data Quality

CERN R. Jacobsson  Typical Physics fill cycle  “Machine Development” (MD) periods Some scheduled days/weeks the LHC will be operated not to produce physics data (Stable Beam) but to study machine physics and improve performance  LHCb will not take data, but safety should be ensured. A shift crew will be needed still, but with lower activities. 9

CERN R. Jacobsson Calib  Readout control has two aspects: Control of data transfer  MEP Packing  Destination assignment for event building and HLT  Load balancing  Partitioning for parallel activities Management of event types and associated destinations/processing  Physics triggers  Calibration triggers  Luminosity triggers  Non-zero suppressed data  Luminosity scans (Vernier scan)  Driven and managed by the LHCb Timing and Fast Control System Responsible for distributing timing, trigger and synchronous and asynchronous information to entire readout system FPGA based master: Readout Supervisor  Also performs rate control and generates all types of auto-triggers and calibration sequences 10

CERN R. Jacobsson 11

CERN R. Jacobsson  In LHCb we synthesize Machine/Beam modes into 9 “Internal LHC States” INJECTION, RAMP, PHYS_ADJUST, PHYSICS, ADJUST, DUMP EOF (End-Of-Fill), NO_BEAM, MD (Machine Development) 12 VELO allowed IN Software “handshakes” between LHC and experiments INJECTION, ADJUST and BEAM DUMP

CERN R. Jacobsson Fill sequence for physics fill in LHCb language: NO_BEAM (Injection Permit = FALSE, Any state of LHCb, Internal clock) INJECTION (Injection Permit = TRUE, VELO out, External clock) RAMP (Injection Permit = FALSE) PHYS_ADJUST PHYSICS (VELO in) (ADJUST) (VELO out) DUMP (VELO out, to be changed) EOF (Internal Clock, Calibrations) 13 Handshake for Injection Handshake for Dump (Only when directly from PHYSICS) Handshake for Adjust

CERN R. Jacobsson 14 PROBLEM WARNING READY PREPARE STANDBY IMMINENT VETO READY OK LHC: NO_BEAM INJECTION LHCb: STANDBY Confirm VETO Experiment Control System GET READY READY  General rule: Get ready in ~5 minutes Confirm RAMP

CERN R. Jacobsson 15  Real-Time scheme to validate High Level Trigger, data flow and offline processing =  Be ready to receive, process and analyze 7 million events in the first hour of collisions MEP Requests Injector Simulated events  Replacing detector with injection of 10 8 “accepted” simulated events real-time in Online system at HLT rate (2 kHz)  Also allows testing new HLT versions with minimum bias events

CERN R. Jacobsson 16 Two years of intense work 2006 – 2008 with the aim to:  Operate the detector AND people as a unit with common tools  Bring all components (sub-detectors and service systems) to operational state.  Define, implement and validate the tools and procedures needed to run the detector as a whole  Organise the activities to reach the ready state in time  Understand and calibrate the detector  Test pulses, radioactive sources  Cosmics  LHC injection tests  First days with beam  Operate with two shifters  Operating the whole detector from one console  Understandable high-level tools for diagnostics, alarms and data monitoring  Homogeneity in the system  Shifter training  On-call Experts for all sub-systems and sub-detectors  Reach operational efficiency  Starting (<10min) and restarting (<1 min) rapidly and smoothly Actually all achieved for pilot run 2009! Crucial tool: Readout and processing of sets of consecutive 25ns clock cycles around “detector activity” trigger Time and space alignment Leakage in preceding and subsequent clock cycles Optimize signal over spill-over

CERN R. Jacobsson 17 LHCb did use cosmics but for obvious geometrical reasons not sufficient…  Beam 2 dumps on injection line beam stopper (TED) ideal.. But backwards…! TED TI8 LHC Vertex Locator Scintillator Pad Detector Muon

CERN R. Jacobsson  Ideal for monitoring bunch profiles, opimization and absolute luminosity 18 Beam 2 Beam 1 Beam-beam predicted from beam-gas Beam-beam

CERN R. Jacobsson 19 +/-5 mm 30 mm Beam 30 mm  VELO is a Movable Device: Out position: 35mm from beam line In nominal data taking position: 5mm from beam line Data taking position determined during Open Tracking by determining luminous region before moving in for every fill May only leave its “garage position” during STABLE BEAM

CERN R. Jacobsson 20  LHCb Main Background Monitor (BCM) Diamond based Beam Condition Monitor Running sums 80  s and 1280  s Directly connected to LHC Beam Dump System (LBDS)  Also hardware interface for Injection Permit  High-sensitivity and high time resolution monitor Scintillator based Beam Loss Monitor 25ns integration and fast readout Used mainly to understand background and discover problems early (collimator settings, aperture, beam-gas, injection etc) 20 BCM