Terry A. Ring Chemical Engineering University of Utah

Slides:



Advertisements
Similar presentations
Main Condensate & Feed Systems
Advertisements

Service Section Technical Training.
Chapter 1 Internal Combustion Engines
Steam and Water Accessories
Department of Chemical Engineering, University of Michigan, Ann Arbor 1 6/10/2014 Troubleshooting Troubleshooting Guidelines 1.Gather information using.
Fundamentals of Pressure Relief Devices
Chapter 18 ChEN 4253 Terry A. Ring
วิชาการเป็นเลิศ เชิดชูคุณธรรม ผู้นำ
Different methods of energy conservation
STEAM TRAPS engineering-resource.com. GROUP MEMBERS 06-CHEM CHEM CHEM CHEM-100 engineering-resource.com.
Gas Solubilities Henry’s Law: [A]equilibrium = SA · pA
Daikin Altherma™ Troubling Shooting
Refrigerators.
The First Law of Thermodynamics
Lesson: Heat. Science Differentiation in action Heat is a form of energy because it can make things move e.g. steam moves the engine in a steam engine.
Driving Toward Energy Efficiency Emerson Process Management Novaspect. Inc. June 22 / 23, 2010 Steam.
Department of Mechanical Engineering ME 322 – Mechanical Engineering Thermodynamics Lecture 25 Comparison to Carnot’s Heat Engine Effects of Boiling and.
Glycol Pumps Operating Pressure: 100 to 1500 psi Circulation Rate: 3 to 450 gph.
Control and regulation of boiler operation Heat Engines & Boilers.
Chapter 16 Chemical and Phase Equilibrium Study Guide in PowerPoint to accompany Thermodynamics: An Engineering Approach, 5th edition by Yunus.
Michael Naas, Teddy Wescott, Andrew Gluck
Capture of Heat Energy From Diesel Engine After Cooler Circuit (2006 Annual Report) Mark Teitzel Alaska Village Energy Corporation
Fire Safety. Introduction and Unit Overview The role of CERTs in fire safety:  Put out small fires.  Prevent additional fires.  Shutoff utilities 
Lecture 3 Confidence Intervals and Experimental Objectives.
Computation of FREE CONVECTION P M V Subbarao Associate Professor Mechanical Engineering Department IIT Delhi Quantification of Free …….
Hydronic Loop Performance: Design vs. Installed Why design and modeling data don’t always match a building’s actual performance David Kandel New Mexico.
Evaporators For Air Conditioning
STEAM HEATING.
Glycol Pumps Operating Pressure: 100 to 2000 psi Circulation Rate: 3 to 450 gph.
Review for Thermal Physics Test. You need to know: How to interpret the heating curve for a substance, especially water Phase changes do not involve temperature.
STUDY OF BOILER’S ACCESSORIES
Plan 2 – Dead-end Seal Chamber Optional Jacket
Dealing with Impurities in Processes and Process Simulators ChEN 5253 Design II Terry A. Ring There is not chapter in the book on this subject.
Partial Evaporation Example 1/31/2007. Shell and Tube Heat Exchanger.
The Enthalpy Chart Presented to CBE 317 Sept – 2003 Dick Hawrelak.
Steam Engine Sliding valve Steam enters chamber from left, leaving from right both valves closed, piston moves to the right Steam enters from right, leaving.
P&ID’s PIPING & INSTRUMENTATION DIAGRAMS.
The Importance of Distribution. Manifold Position And Vapor Trail.
ICT development office ICT research, planning and training dept. Network development and administration dept. System development and operation dept. President.
©2008 Armstrong International, Inc. Steam Basics.
ME414 Spring 2006 Design Project 2 Heat Exchanger Ugo Anyoarah Osinanna Okonkwo Vinay Prisad Daniel Reed.
Rod Dry Dec Training Module #6: Problem Statement Low pressure steam (1 barg) is condensed in a heat exchanger with cooling water. The exchanger.
1 ChemE 260 Improvements and Non-Ideal Behavior in the Rankine Cycle May 20, 2005 Dr. William Baratuci Senior Lecturer Chemical Engineering Department.
Department of Chemical Engineering, University of Michigan, Ann Arbor 1 11/16/2015 Troubleshooting Troubleshooting Guidelines 1.Gather information using.
Lab Equipment. hold solids or liquids that will not release gases when reacted or are unlikely to splatter if stirred or heated.
Thermal Control System. The Three Mechanisms of Heat Transfer Conduction - The transfer of heat through a solid –Interface Heat Exchangers –Cold plates.
Exquisite Heat For Steam Boilers. Time based system  Thermostat Demand Analysis over time will determine the length of burner fire time of the boiler.
SEMINAR PRESENTATION ON 220 KV GSS UDAIPUR
ME444 ENGINEERING PIPING SYSTEM DESIGN CHAPTER 11: STEAM PIPING SYSTEM (1)
I Need A Space Heating System Let’s Look At A Central Steam Plant Option.
OBJECTIVE 3 Students will identify that density is a fundamental property of matter. Changes in pressure and temperature can change the density of a material.
E = m Lf E = m c θ E = m Lv.
Multiplication Strategies
Introduction to Food Engineering
Steam Engine Sliding valve Steam enters chamber from
HEAT EXCHANGER DESIGNPROJECT ME 414 Thermal Fluid System Design
Compound VCRS.
Chemical Engineering 3P04
Treatment – Chlorine Disinfection
Lab Schedule.
Process Equipment Design and Heuristics – Heat Exchangers
Flo-Direct®.
Objectives Cooling Cycles Cooling system components Refrigerants
BELMONT RAPID INFUSER.
R4 Troubleshooting Refrigeration
Steam traps for OPC Applications
Steam traps Applications and Recommendations
Pressure.
Scientific Realization of Practicable Power Plant
Presentation transcript:

Terry A. Ring Chemical Engineering University of Utah Trouble Shooting Terry A. Ring Chemical Engineering University of Utah 1) The steam trap is blocked causing liquid condensate to back up in the heat exchanger so the steam does not contact the pipes in the exchanger. 2) The entering water is sub-cooled. 3) The steam pressure and temperature have dropped. 4) The heat exchanger has become fouled. 5) The steam is dirty, i.e., contains non condensable gases.

What is Trouble Shooting Problem solving process to find the root cause of a problem. Trouble Shooting is not an exact science. Requires Paying attention to detail, good listening, understanding symptoms, viewing problem first hand

Try to Solve this problem QUESTION FROM TROUBLE ANSWER FROM EXPERTS COST TO ANSWER SHOOTERS Steam Pressure at PlOO? Higher Than Design. 5 min. Steam Temperature at TIOO? Design Value. 5 min. Amount of Condensate Drainable from Tubes Via the Bypass Valve? About 0.5 Pints of Condensate. 30 min. Feedwater Exit Temperature After 10 min. of Bleeding? 68 Degrees Celsius. 40 min (120 min. if Drain Valve Already Opened) Feedwater Exit Temperature After Bleeding Pipes? 3 Hours 45 Degrees Celsius. 3 Hours.   Bleed Gas Analysis Results. 20% Air. 2% Carbon Dioxide, Traces of Oil. 8 Hours. Action Cost Read meter 2 min. Check History 5 min Make Manual Measurement 30 min Adjust Operating Conditions 30 min Disassemble Equipment 4 hr Install new Equipment 5 day

Costs for Analysis Action Cost Read meter 2 min. Check History 5 min Make Manual Measurement 30 min Adjust Operating Conditions 30 min Disassemble Equipment 4 hr Install new Equipment 5 day

Guidelines

Critical Thinking and Trouble Shooting Kepner-Tregoe (K-T) Strategy Clearly determine what is the problem Classification of problem into Do we need to determine the cause of the problem Do we need to make a decision on the problem Do we need to plan to avoid future problems Develop multiple approaches simultaneously Establish probability for success (and cost) of each approach before proceeding Know what a potential response to a question will be under various problem scenarios.

Socratic Questioning

Kepner-Tregoe (K-T) Strategy

When asking question or asking for analysis What will I learn if I ask this question? How will I use this information to find the fault? Keep 4 or 5 working hypotheses at any one time.

K-T Analysis

K-T Potential Problem Analysis Possible Cause Preventive Action Contingency Plan A. 1. 2. B.

Try to Solve this problem QUESTION FROM TROUBLE ANSWER FROM EXPERTS COST TO ANSWER SHOOTERS Steam Pressure at PlOO? Higher Than Design. 5 min. Steam Temperature at TIOO? Design Value. 5 min. Amount of Condensate Drainable from Tubes Via the Bypass Valve? About 0.5 Pints of Condensate. 30 min. Feedwater Exit Temperature After 10 min. of Bleeding? 68 Degrees Celsius. 40 min (120 min. if Drain Valve Already Opened) Feedwater Exit Temperature After Bleeding Pipes? 3 Hours 45 Degrees Celsius. 3 Hours.   Bleed Gas Analysis Results. 20% Air. 2% Carbon Dioxide, Traces of Oil. 8 Hours. Action Cost Read meter 2 min. Check History 5 min Make Manual Measurement 30 min Adjust Operating Conditions 30 min Disassemble Equipment 4 hr Install new Equipment 5 day

K-T Analysis

Possible Faults with Similar Behavior 1) The steam trap is blocked causing liquid condensate to back up in the heat exchanger so the steam does not contact the pipes in the exchanger. 2) The entering water is sub-cooled. 3) The steam pressure and temperature have dropped. 4) The heat exchanger has become fouled. 5) The steam is dirty, i.e., contains non condensable gases.