B.Jones– July 2002 - n° 1 Software Release Testing u Draft document prepared and attached to the agenda page for this meeting u Explains the testing steps.

Slides:



Advertisements
Similar presentations
Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
Advertisements

4 th DataGRID Project Conference, Paris, 5 March 2002 Testbed Software Test Plan I. Mandjavidze on behalf of L. Bobelin – CS SI; F.Etienne, E. Fede – CPPM;
Preparation of D1.7 Massimo Sgaravatto INFN Padova.
12. March 2003Bernd Panzer-Steindel, CERN/IT1 LCG Fabric status
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
EC Review – 01/03/2002 – G. Zaquine – Quality Assurance – WP12 – CS-SI – n° 1 DataGrid Quality Assurance Gabriel Zaquine Quality Engineer - WP12 – CS-SI.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Quality Assurance On behalf.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Andrew McNab - Manchester HEP - 26 June 2001 WG-H / Support status Packaging / RPM’s UK + EU DG CA’s central grid-users file grid “ping”
Geneve, 28th August 2002 – EDG Retreat 1 Dissemination & Exploitation Demonstrations and Promotional Material Mauro Draoli
“Grey areas” of the new architecture Massimo Sgaravatto INFN Padova.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
C. Loomis – Testbed Status – 28/01/2002 – n° 1 Future WP6 Tasks Charles Loomis January 28, 2002
Deliverable Readiness Review LexEVS 5.1 December 17, 2009.
Olof Bärring – WP4 summary- 6/3/ n° 1 Partner Logo WP4 report Status, issues and plans
Report from Amsterdam Massimo Sgaravatto INFN Padova.
CERN Technical Coordinators Report PTB, 3 rd July 2002 Bob Jones.
Frascati, October 5th, Accounting in DataGrid Preliminary Proposal and basis for discussion Stefano Barale Frascati, October.
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
General Status of the Project Fabrizio Gagliardi Project Leader.
Bob Jones – June n° 1 EDG release Schedule Bob Jones.
Training and the NGS Mike Mineter
C. Loomis – Integration Status- October 31, n° 1 Integration Status October 31, 2001
GridPP Collaboration meeting Manchester 9/10 May 2002 P.Clarke Resource Management: Instruments and Procedures Testbed Rollout: Development of Plan Education.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
Overall Goal of the Project  Develop full functionality of CMS Tier-2 centers  Embed the Tier-2 centers in the LHC-GRID  Provide well documented and.
Budapest, September 5th, 2002 DataGrid Accounting System DGAS Current status & plans Stefano Barale INFN Budapest, September.
DataGRID WPMM, Geneve, 17th June 2002 Testbed Software Test Group work status for 1.2 release Andrea Formica on behalf of Test Group.
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Project Status Fabrizio Gagliardi.
LCG EGEE is a project funded by the European Union under contract IST LCG PEB, 7 th June 2004 Prototype Middleware Status Update Frédéric Hemmer.
DataGRID PTB, Geneve, 10 April 2002 Testbed Software Test Plan Status Laurent Bobelin on behalf of Test Group.
GRID Zhen Xie, INFN-Pisa, on DataGrid WP6 meeting1 Globus Installation Toolkit Zhen Xie On behalf of grid-release team INFN-Pisa.
Geneve, 02th October 2002 – PTB Meeting 1 November Demonstrations Status and plans Mauro Draoli
EGEE is a project funded by the European Union under contract IST EGEE Services Ian Bird SA1 Manager Cork Meeting, April
Andrew McNab - Manchester HEP - 17 September 2002 UK Testbed Deployment Aim of this talk is to the answer the questions: –“How much of the Testbed has.
DataTAG Work Package 4 Meeting Bologna Simone Ludwig Brunel University 23rd and 24th of May 2002.
1 Grid monitoring System (GridICE) Grid monitoring System (GridICE) DataTAG Collaboration: S.Andreozzi, S.Fantinel, A.Ghiselli, G.Tortone, C.Vistoli A.Ghiselli,
DataTAG: Glue schema test C.Vistoli DataTAG Wp4 Meeting 23/5/2002.
LCG CERN David Foster LCG WP4 Meeting 20 th June 2002 LCG Project Status WP4 Meeting Presentation David Foster IT/LCG 20 June 2002.
Report from DataGrid Technical Board Massimo Sgaravatto INFN Padova.
WP7 Security Coordination 23/24 Jan 2002 David Kelsey CLRC/RAL, UK
WP1 Status and plans Francesco Prelz, Massimo Sgaravatto 4 th EDG Project Conference Paris, March 6 th, 2002.
Plans for D7.7 The Security Report on the Final Project Release Linda Cornwall, RAL.
7-May-03D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Issues and Planning or Report from the Security Group CERN, 8 May 2003 David Kelsey CCLRC/RAL, UK.
CERN Certification & Testing LCG Certification & Testing Team (C&T Team) Marco Serra - CERN / INFN Zdenek Sekera - CERN.
CERN 1 DataGrid Architecture Group Bob Jones CERN.
Maite Barroso – WP4 Workshop – 10/12/ n° 1 -WP4 Workshop- Developers’ Guide Maite Barroso 10/12/2002
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
DataGrid and CrossGrid Helpdesk CERN, 30th October 2002 EDG WP6 meeting Sophie Nicoud (CNRS-Marseille) and José Salt (IFIC-Valencia)
International Data Centre October 2015Page 1 Progressive Commissioning Jerry Carter, Senior Scientist W. Randy Bell, Director Gerhard Graham, Coordinator.
J Jensen / WP5 /RAL UCL 4/5 March 2004 GridPP / DataGrid wrap-up Mass Storage Management J Jensen
Software Development Life Cycle. The Software Life Cycle  Encompasses all activities from initial analysis until end of work  Formal process for software.
American Recovery and Reinvestment Act (ARRA) Reporting Requirements Duquesne University Office of Research.
Massimo Sgaravatto INFN Padova
The EDG Testbed Deployment Details
Gavin McCance University of Glasgow GridPP2 Workshop, UCL
DataGrid Quality Assurance
EO Applications Parallel Session
Grid related projects CERN openlab LCG EDG F.Fluckiger
Savannah to Jira Migration
WP7 objectives, achievements and plans
CMS report from FNAL demo week Marco Verlato (INFN-Padova)
Annual Computer Deployment 2018
LCG experience in Integrating Grid Toolkits
Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002
5th EU DataGrid Conference
Report on GLUE activities 5th EU-DataGRID Conference
TGba September 2017 Closing Report
Presentation transcript:

B.Jones– July n° 1 Software Release Testing u Draft document prepared and attached to the agenda page for this meeting u Explains the testing steps involved, the groups responsible and how they interact u Gives details of the input/output formalities for each step u Shows the mapping onto the testbeds u Developed in conjunction with LCG and testing groups representatives

B.Jones– July n° 2 Testbeds and Testing Activities Applications Testing Group Mware WPs & toolkits ITeam Auto. & manual tests Application tests Loose Cannons “Development” testbed “Certification” testbed “Production” testbed Office hours 24x7 WPa tests WPb tests Dist. & install. & grid tests WPf tests WP dev. & unit tests. Leave testbed stable (auto tests work) LCG Certification System tests

B.Jones– July n° 3 Open Issues u Need clearer definition of the test steps to be performed by the groups: n WP unit tests: test plans documents prepared s Necessary to appoint a person responsible for quality/testing in each WP n ITeam: test plan needed n Testing group: test plan document prepared s n Loose Cannons: tests to verify use cases? n LCG Certification: test plan to be developed u Certification testbed needs to be created in conjunction with LCG u Production testbed needs to be expanded in conjunction with LCG n Open to WP8, WP9 & WP10 n DataGrid cannot provide 24x7 service itself u This approach will be reviewed after release 1.4 n Full cycle is estimated to take about 4 months (i.e. 3 releases per year on the production testbed)

B.Jones– July n° 4 Release schedule u EDG1.2 being finalised now n Deployed on production testbed n Used as a basis for GLUE activities (separate testbed) u EDG 1.3 in July (will not be deployed on production testbed) u EDG 1.4 : in reality will this become testbed 2? (I.e. October 2002) u Scheduling points to take into account: n Incorporate modifications for GLUE schema: end July 2002 n SC2002, IST2002, EU 6 th Framework demos: November 2002