Barhale Quick Hitch Procedure Procedure, forms and information used when using quick hitches.

Slides:



Advertisements
Similar presentations
Man- Basket for cranes Design Specifications Safety Work Instructions
Advertisements

Correctional Certification Subpart 1. Purpose: establish program certification requirements that govern facilities providing correctional program.
Cleveland Construction Safety Initiative Introductions Purpose of a 3SP Overview of Sections of a 3SP Pat McMillen – Gilbane Building Company Dave.
Background Presenters Work done in preparation for WHS changes
EFCOG Electrical Improvement Project Electrical Hazards Awareness Briefing Excavation and Trenching Module 5.
Safety Reminder – Security Gates. Security Gates There is an increase in motor vehicle accidents at all Security Gates.
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
Description On the 12 th July 2011, a truck carrying a container was inspected at the SBS Gantry, prior to being sent to the Quayside. A 4ft long, 4x2.
Learning and Development Evidence Collection Planning January 2015.
ALO Planning & Assurance Requirements
Vehicle inspections. Pre-trip inspection requirements Be satisfied that the vehicle is in safe operating condition Be satisfied that the vehicle is in.
1 The purpose is to prevent falls and reduce the consequences if a fall occurs when Working At Height. Use fall protection equipment when working outside.
1 THAI TOKO ENGINEERING CO.,LTD. Safety management procedure.
INDUCTION Welcome to the Victorian Association of Performing Arts Centres (VAPAC) and Darebin Arts & Entertainment Centre’s (DAEC) Emergency Procedure.
Controlling Hazardous Energy
IMS Training on Management Standards ISO 9001, ISO 14001, and OHSAS Prepared by SL, 18/01/2011.
SHE Code 4: Safety and Safe Use of Work Equipment
Permit to Work Procedure Document Number: KOC.SA.004
Planning, First Aid and Working Conditions Section C of the Forest Activities Code.
Safety & Health Programs.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions This unit will give you the opportunity.
1 Welcome to Automotive Technology Week one objectives.
Georgia Tech Safety and Health Consultation Program
Health & Hygiene/ELB Sample LOCKOUT/TAGOUT “APPROVED” TRAINING.
Lockout/Tag Out Guidelines Procedures to protect employees and co-workers.
Work Experience Key Points. Overview Approach potential employers yourself Have a meeting at least 2 weeks before –Sign all forms –Understand the workplace.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
Department of Consumer and Employment Protection Resources Safety 1 Please read this before using presentation This presentation is based on content presented.
Safeguarding Animal Health National Veterinary Stockpile Improving Disease Response Through Science-Based Logistics NVS Logistics Warehouse Training Module.
1  Confirm if a Safe Journey Plan is required before starting the journey.  Discuss the Safe Journey Plan with the Journey Manager.  Understand the.
TOOL BOX TALKS Safe Work Method Statements. Purpose to outline a safe method of work for a specific job to provide an induction document that workers.
Picking Up A Shipment Paperwork Training. Picking Up A Shipment  When you arrive at the shipper's premises to pick up a shipment, it is your responsibility.
RCA Feedback Communication to Transportation partners.
TRENCHING & EXCAVATION
Excavation.
Procedures to protect employees and co-workers Basic Lockout Guidelines Procedures to protect employees and co-workers.
MNM Fatal Falling Material Accident Falling Material Accident April 21, 2009 (Tennessee) April 21, 2009 (Tennessee) Sand & Gravel Operation Sand.
Introduction What is this act? The LOLER regulations came into force and was applied to all equipment used in Lifting Operations. For example with engineering,
World Vision Lebanon Humanitarian Accountability Accountability to Affected Populations 8 th April 2016.
13/01/2015 ANKERLIG & GOURIKWA POWER STATION STATION OCGT Tender Presented by Obert Mgwenya.
CONSTRUCTION BASICS STAYING SAFE ON SITE By COLDROP.
1.  Career description: construct and repair structures and fixtures of various woods prepare cutting lines on materials with a ruler, pencil, chalk.
SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS UAW-GM SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS Copyright © UAW-GM Health & Safety.
1OHS Training 2003Induction OHS Training Job Safety Analysis and Hazard management UEENEEE037B.
HSE Procedure for Risk Assessment Document Number: KOC.SA.018
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
We always have time to work safely
Lock Out & Tag Out.
Maintaining Safety Standards
STAYING SAFE ON SITE By COLDROP
Maintaining Safety Standards
Lifting & Rigging Continuing Education Fourth Quarter 2016
2.8 Mtr Belt Mtr Rope = 7.3 Mtr Broken
Injury: Fall from height
LMS: Contractor Sign In
Safe Work Method Statements
Cranes, Hoists and Lifting Devices Identification
2.8 Mtr Belt Mtr Rope = 7.3 Mtr Broken
Personal Protective Equipment
Lifting Operations on Construction Sites
التدريب الرياضى إعداد الدكتور طارق صلاح.
Control of Hazardous Energy
PDO Safety Advice What happened? Your learning from this incident..
Onsite Control of Visitors & Contractors
Ensure safety devices are working prior to starting work
PDO Safety Advice Date: 23/08/2015 Injury: Fractured fingers
LONE WORKING Introduction
This work has been produced by DGL (Aust) Pty Ltd
LMS: Contractor Sign In
Presentation transcript:

Barhale Quick Hitch Procedure Procedure, forms and information used when using quick hitches

Excavator Operator’s Declaration Form On arrival at site, and as part of the site induction, excavator operators are required to complete and sign a declaration to the effect that they have had the necessary training for the specific equipment that they will be using on site, including any non standard equipment such as: safe load indicators, quick hitch mechanisms, pile hammers / extractors, pole grabs and breakers in addition to standard excavation duties.

Excavator quick hitch attachment register The register is completed for every attachment change and includes; 360, 180 degree excavators and mini diggers. Where there is no attachment change in the course of the day, the register is signed on a daily basis to confirm that the driver has inspected the mechanism and that it is in good order. A key for the attachments is provided on the register for identification purposes. The person who is identified as having responsibility for plant on site will inspect the register at a maximum of seven days to ensure that the form is being used correctly.

Tool Box Talk Excavators (Quick Hitches and Lifting)

Barhale Procedure The Safe Use of Plant on Site