Use of EDWG Data by the LTPT WECC Staff January 15, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.

Slides:



Advertisements
Similar presentations
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
Advertisements

Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
1 Electricity Markets and Policy Group Energy Analysis Department Exploration of Resource and Transmission Expansion Decisions in the Western Renewable.
Software Analysis Tools
Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
Metrics Definition Task Force Carl Linvill, Chair—MDTF W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 John J. Conti Acting Director Office of Integrated Analysis and Forecasting Prepared for the Energy Technology System Analysis Program (ETSAP) Florence,
Transmission Corridor Zone Designation Process Terrence O'Brien, CEC December 11, 2007 Energy Action Plan.
Michael Bailey, PE Energy Planning & Policy Analyst LTPT Update to EDTF January 23, 2015 WECC Webinar.
SMALL UTILITY-SCALE RESOURCES (DISTRIBUTED GENERATION) 1.
Modeling Choices & Approaches Key Model Outputs: Carbon emissions Other emissions Electricity prices Total electricity system costs Fuel use and diversity.
Study Case Report PC 10 High Carbon Price PC 11 Low Carbon Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
LEVELIZED COST OF ENERGY. Summary Levelized costs are calculated as a proxy for the PPA price between a third-party developer and a utility LCOEs amortize.
Energy-Water-Climate Change Scenario Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
ERCOT PUBLIC 3/25/ LTSA Scenario and Data Assumptions March 25, 2014.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Valuing Economic Benefits from Transmission Planning ERCOT System Planning March 22, 2006.
Effect of Thermal Generation Replacement on System Frequency Response Enoch Davies, PE Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Electric Reliability and the Clean Power Plan Branden Sudduth Director, Reliability Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Creating Profiles Enoch Davies Staff Engineer W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
Update on System Adequacy Planning (SAP) Activities May 5 th -6 th 2015 SPSG Meeting Ben Brownlee, P.E.., Dan Beckstead, Stan Holland, Vijay Satyal PhD.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Study Program Comparison Protocol vs Proposal W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Update: 4.9 Work Team on Committee Role, Scope and Structure Melanie Frye Vice President, Reliability Planning and Performance Analysis W ESTERN E LECTRICITY.
ENVIRONMENTAL DATA IN TRANSMISSION PLANNING AUGUST 3, 2015 Carl Zichella DIRECTOR OF WESTERN TRANSMISSION.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Use of EDWG Data by the LTPT WECC Staff October 9, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
California Transmission Planning Group Collaborative approach to State-wide Transmission Planning.
Environmental and Cultural Data Use in Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Historical Year for 2026 Common Case Load/Hydro/Wind/Solar Shapes TAS November 2015 Meeting Tom Miller- TAS Vice Chair W ESTERN E LECTRICITY C OORDINATING.
Reliability Planning Priorities for 2015 Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Modeling Working Group Progress Report to TAS TEPPC Quarterly Meeting November 2-5, 2015 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TAS Steering Group Meeting DWG Update July 16, 2015 Jamie Austin, PacifiCorp DWG - Chair.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
Environmental Benefits of Renewable Portfolio Standards in an Age of Coal Plant Retirements September 10 th, 2015 Energy Policy Research Conference Denver,
1 Cross-Cutting Analytical Assumptions for the 6 th Power Plan July 1, 2008.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
System Review Work Group Update John Gross, SRWG Chair Presented to TSS Jan. 22, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Study Results April 16, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Jan Strack San Diego Gas and Electric TEPPC Overview TEPPC Review Task Force January 11, 2016 Salt Lake City, UT.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Environmental and Cultural Data Products Environmental Data Work Group January 15, 2016 Nathan Wagoner, ICF W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
TEPPC 2015 Work Plan Byron Woertz, Senior Project Manager W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
WECC Reliability Study Requests Byron Woertz, Manager—System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
MWG Webinar January 25, 2016 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PC30 BLM High Priority RE SWG – 10/26/15 WECC Staff W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Planning the Networked Grid Transmission Planning J.E.(Jeff) Billinton Manager, Regional Transmission - North Building the Networked Electricity Grid –
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Access Investment Model (AIM)
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
DG Projections in the Western Interconnection
Scenario Scoping Process
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Long Term Grid Assessment – Preparing for 2018 Studies
Scenario Scoping Process
Scenario Development Subcommittee January 4, 2018
Use of EDWG Data by the LTPT
Dan Beckstead Associate Staff Engineer
WECC Scenario Task Force (WSTF)
Presentation transcript:

Use of EDWG Data by the LTPT WECC Staff January 15, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

What is the LTPT? The LTPT - Long Term Planning Tool: Is a capital expansion tool 20 year study horizon Evaluating potential energy future 2 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

LTPT LTPT comprised of: – SCDT-Study Case Development Tool – NXT-Network Expansion Tool 3 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

SCDT SCDT - Study Case Development Tool – Produce Study Case – Optimized study case representing potential “energy future” – Comprised of reduced nodal network model – Transmission expansion candidate lines – Transmission capital cost – Minimum cost generation optimization-decision factors, constraints 4 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

NXT NXT - Network Expansion Tool – Relieves candidate lines for four system conditions Heavy Summer, Light Spring, Light Fall, Heavy Winter, oveloaded, loss of load etc – Optimized transmission network expansion – Mitigating engineering constraints – Grid cost components applicable to study case 5 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

LTPT Process Workflow 6 W ESTERN E LECTRICITY C OORDINATING C OUNCIL Perform Modeling No Yes Define Scenarios to be examined in narrative Parameterize Scenarios / Sensitivities Does Parameteriz ation affect Scenario narrative? Are results reasonable? No Yes Select ‘no regrets’ investments; decide other recommendations Compare Scenario results based on pre- determined Metrics Are sensitivities of Scenarios required? Yes No Define Metrics to be used to evaluate Scenario/Sensitivity results

10-Year & 20-Year Planning Comparison Attribute10-Year Studies20-Year Studies ToolProduction Cost ModelCapital Expansion Model Objective MinimizationProduction CostCapital Cost FocusCapacity additions and specific projects, planned and in progress Understanding potential “energy futures” and decisions needed to achieve those futures Model decides toDispatch GenerationBuild Gen and Transmission LoadFrom balancing authorities w/ stakeholder adjustment ResourcesStakeholder specificStakeholder specific and LTPT optimized TransmissionStakeholder specificStakeholder specific and LTPT optimized Time GranularityHourly / Sub-hourlyAnnual / Seasonal Load Durations InterdependenceStarting point of 20-YearInforms 10-Year W ESTERN E LECTRICITY C OORDINATING C OUNCIL 7

EDWG Data in LTPT – Transmission route finding input – No Siting – More realistic cost estimate – Environmental Risk – Line weighting-Financial Element 8 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Risk Weightings EDWG Risk Category Weightings – Think of the weighting similar to miles 9 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Staying in the fairway. Avoiding hazards. Minimizing strokes. Traversing the geospatial landscape

W ESTERN E LECTRICITY C OORDINATING C OUNCIL 11 Overlay EDWG and Transmission Candidate Cooridors

Build cost surfaces Bend corridor routing to minimize environmental impact. Optimize Corridors W ESTERN E LECTRICITY C OORDINATING C OUNCIL 12

Transmission Models and Assumptions Start with TEPPC 2024 Power Flow Model Delineate load and generation hubs. Perform Network Reduction, preserving interface and CCTA transmission lines. Define aggregation zones delineated by WECC Paths. Define list of monitored lines based on aggregation zones. Define transmission technology types and characteristics. Define list of candidate corridors based on tiered rules. Optimize corridor routing W ESTERN E LECTRICITY C OORDINATING C OUNCIL 13

Economic Models and Assumptions Fuel Prices – Henry Hub per EIA Annual Energy Outlook (converted to 2014 dollars) – Differentials by state – Progress multipliers per E3 Capital Cost Tool/Report Resource Types & Costs – Capital Cost: E3 Capital Cost Tool (“E3 Tool”), TEPPC approved – Future types & Progress multipliers Vintage per E3 Tool – Simplified LCOE Model - E3 Tool Policy – CO2 Price: $37.11/MT Per stakeholder input – Metric Definition Task Force (MDTF) – No PTC, Solar ITC reduced to 10% Per E3 forecast of federal policy – Coal constraints per stakeholder input EIA – U.S. Energy Information Administration AEO – Annual Energy Outlook DG – Distributed Generation RPS – Renewable Portfolio Standard NREL – National Renewable Energy Laboratory Transmission Costs o Per TEPPC Capital Cost Update: B&V analysis/report and tool, with stakeholder review/approval o Includes Transmission and Substation Costs o Cost Factors Include: EquipmentTerrain ROWAFUDC BreakersTransformers VoltageCompensation o LCOE per E3 “levelization calculation” (E3 Captial Cost Tool) PTC – Production Tax Credit ITC – Investment Tax Credit W ESTERN E LECTRICITY C OORDINATING C OUNCIL 14

Focus on Inter-regional needs 15 W ESTERN E LECTRICITY C OORDINATING C OUNCIL

Tool Enhancements Introduction of Corridor Library Parameterized Goals Parameterized Constraints Co-optimization across seasonal and load level conditions Improved reduced network model 16 W ESTERN E LECTRICITY C OORDINATING C OUNCIL