Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #5 July 15 – September 15.

Slides:



Advertisements
Similar presentations
Rivanna Water & Sewer Authority Community Water Supply Plan Update Public Meeting Monticello High School September 21, :00 pm.
Advertisements

Quantification of Spill Data from Domestic Facilities Andy Squires Pinellas County Environmental Management Keith Hackett Janicki Environmental, Inc.
THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
Moving to the Next Level of Water Use Efficiency in Florida Janet G. Llewellyn, Director Division of Water Resource Management Florida Department of Environmental.
LEE COUNTY UTILITIES DIVISION Integrated Water Resources Master Plan
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
 Why  Project Status  Future Course Lime Sludge Biosolids Water/Wastewater System Life Cycle Raw Water Wells (12) Water Treatment Plant Storage Tanks.
Eld Polk County Southeast Regional Wellfield. Polk County, Florida  Central Florida (Landlocked)  554 Lakes  Headwaters to Multiple Rivers (Low Volume)
Town Hall Meeting 12 March 2008 Carmichael Area Aerojet Groundwater Remediation Progress Update 12 March 2008.
Minimum Flows and Levels for the Peace River FLOW 2008 October, 2008 Marty Kelly
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
WRWSA Water Supply Plan Update Progress Report – (April 1- May 15) >Project Tasks 1.Water Demand Estimates 2.Availability of Ground- and Surface Water.
Overview and Project Approach  Clinton is currently experiencing surface water supply shortages in their raw water source, Clinton Lake, and has been.
Water for Texas: Do We Have Enough? Dr. Dan Hardin Director, Water Resource Planning Texas Water Development Board.
Sole Source Contracts for Administrative Hearing Southeast Water Supply Augmentation Project Presented to: Orange County Board of County Commissioners.
Rule 62-40, F.A.C. – What is it? The Water Resource Implementation Rule (State Water Policy). Required by Sec , F.S. Goals, objectives and guidance.
CENTRAL FLORIDA COORDINATION AREA Central Florida Water Initiative Central Florida Water Initiative Regional Water Supply Plan Bill Graf Intergovernmental.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Robert Beltran, P.E., BCEE Assistant Executive Director.
Regional Water Council Planning Update Dargan “Scott” Cole Hall Booth Smith & Slover, P.C. 191 Peachtree Street, Suite 2900 Atlanta, Georgia
Los Osos Community Services District Basin Management Planning and Proposed Work Program June 5, 2008.
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #3 May 15 – June 18.
Desalination Becomes A Reality In Tampa Bay Florida Jim Jensen Senior Project Manager PB Water Area Manager Parsons Brinckerhoff Quade & Douglas, Inc.
WITHLACOCHEE MASTER REGIONALWATER SUPPLY PLANNING AND IMPLEMENTATION PROGRAM (PHASE VII): NORTHERN DISTRICT MODELING KICK OFF MEETING JUNE 14, 2007.
Rulemaking for Central Florida Coordination Area Coordinated Rulemaking by the South Florida, St. Johns River and Southwest Florida Water Management Districts.
Water Demands in the Jackson Blue Spring Basin.
Interdistrict Transfers of Water and Local Sources First Land Resources and Regulatory Committee November 3, 2005 Land Resources and Regulatory Committee.
FLOWS FOR THE FUTURE 2005 Environmental Flows Conference Texas State University – San Marcos November 1, 2005 Bob Brandes Region M Water Planning Study.
Status of Regional Water Supply Plan Updates John Mulliken Director, Planning Division Water Supply Department Water Resources Advisory Commission January.
Withlacoochee Regional Water Supply Authority Withlacoochee Master Regional Water Supply Planning and Implementation Program (WMRWSPIP) Technical Review.
Regional Water Availability Rulemaking Chip Merriam Water Resources Advisory Commission February 8, 2007 Chip Merriam Water Resources Advisory Commission.
Seacoast Utility Authority Water Use Permit Steven Memberg, Section Leader Water Use Regulation Division, Water Supply Department January 26, 2009.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
June 10, 2008 Board of County Commissioners B-WSFWP-1 Water Supply Facilities Work Plan (WSFWP) Transmittal Hearing.
1 Water Resources Management - DEQ’s Role in Water Supply - State Water Commission October 1, 2002.
Integrated Watershed Planning In Texas An Evolving Process National Waterways Conference Charleston, West Virginia September 25, 2009 Bill Mullican, P.G.,
Geospatial Analysis of the Big Spring, TX Area. Types of Wastewater Reuse Non-Potable Reuse Watering lawns Industrial cooling Indirect Potable Reuse Aquifer.
POTABLE REUSE THE ALTERNATIVE WATER SUPPLY. Florida Section WateReuse Association November 9, 2015 Chuck Drake, PG.
Is the Mid-Atlantic Region Water Rich? Presentation to 5 th Mid-Atlantic Regional Planning Roundtable November 7, 2008 Joseph Hoffman, Executive Director.
Withlacoochee Regional Water Supply Authority Final Water Supply Plan Update July 2014.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
Santa Rosa Plain Groundwater Management Situation Assessment Jay Jasperse, Sonoma County Water Agency Gina Bartlett, Center for Collaborative Policy January.
Water Supply Orange County Presented by Kirby B. Green Executive Director St. Johns River Water Management District January 27, 2009.
St. Johns River Water Management District Central Florida Water Initiative Water Supply Plan Mike Register, P.E., Director Division of Water Supply Planning.
High Altitude View of ACF Regional Water Plans.
Santa Rosa Plain Groundwater Management Planning Update Fall 2013.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update #7 October 15 – November 15.
Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the Requirements Identified Issues Timetable.
Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #4 June 18 – July 15.
Request approval to proceed to EMC with 2014 Tar-Pamlico River Basin Plan.
PROPOSED BRUNSWICK COUNTY INTERBASIN TRANSFER PETITION REQUEST NOVEMBER 14, 2013.
REGION H Water Planning Group Freese and Nichols, Inc. | LBG-Guyton Associates | Ekistics Corporation DEVELOPING THE REGION H 2016 REGIONAL WATER PLAN.
Climate Change Threat Reduced Snowpack 1. Potential Impacts Related to Reduced Snowpack How might our community be impacted by reduced snowpack? 2.
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
Development and Application of a Groundwater-Flow Model of the Atlantic Coastal Plain aquifers, Aiken County, South Carolina to Support Water Resource.
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Allocation of Ogallala Groundwater Supplies
Florida and Reclaimed Water
Water Supply Planning in the St
Department of Environmental Quality Division of Water Resources
Withlacoochee Regional Water Supply Authority
Brackish Water Desalination Project
October 29, 2018 Terry Lauritsen, P.E.
Background Broward County currently operates a 10 MGD reuse facility located at the North Regional Wastewater Treatment Plant. Customers include commercial,
City of Sunrise Wastewater Reuse Program
Status after Second Year of Work Implementing the Recommendations of the Santa Cruz Water Supply Advisory Committee Joint Meeting Santa Cruz City Council.
August 30, 2019 Robert Beltran, PE , BCEE
Why Potable Reuse in Florida?
Presentation transcript:

Withlacoochee Regional Water Supply Authority Water Supply Plan Update - Progress Report #5 July 15 – September 15

Water Supply Plan Update Progress (July 15 – September 15) 1.Water Demand Estimates 2.Availability of Ground- and Surface Water 3.Conservation and Reclaimed Water Strategies 4.Water Supply Project Options 5.Water Supply Project Configurations 6.Facility Integration Plan 7.Governance

Water Supply Plan Update Progress (July 15 – September 15) 1.Water Demand Estimates 2.Availability of Ground- and Surface Water 3.Conservation and Reclaimed Water Strategies 4.Water Supply Project Options 5.Water Supply Project Configurations 6.Facility Integration Plan 7.Governance

Public Supply Demand Projections ( ) County 2010 Water Use (mgd) Increase in Demand from (mgd) Percent Increase Citrus Hernando Marion Sumter TOTALS

Water Supply Plan Update Progress (July 15 – September 15) 1.Water Demand Estimates 2.Availability of Ground- and Surface Water 3.Conservation and Reclaimed Water Strategies 4.Water Supply Project Options 5.Water Supply Project Configurations 6.Facility Integration Plan 7.Governance

Determining the Availability of Groundwater for Water Supply through 2035  Groundwater Availability will be Determined through the Use of the SWFWMD’s Northern District Model –A number of wellfields will be proposed in the vicinity of major population centers with capacities large enough to meet projected demands. –The production of the wellfields will be modeled to determine the quantity that can be produced that will not violate the MFLs of wetlands, lakes, springs, and rivers in the vicinity of the wellfields.

Determining the Availability of Groundwater for Water Supply through 2035  The SWFWMD’s has provided us with the expanded and updated Northern District Groundwater model.  SWFWMD will supply us with data on how much water is projected to be pumped for the wells in the model in  We are re-evaluating the locations and production quantities for the wellfields that were proposed in the 2010 Water Supply Plan.  Once this is completed, we will use the model to determine how the wellfields will impact established and proposed MFLs for springs, lakes, and wetlands.

Determining the Availability of Surface Water for Water Supply through 2035  Withlacoochee River (SWFWMD)  Ocklawaha River (SJRWMD)

Determining the Availability of Surface Water for Water Supply through 2035  Withlacoochee River (SWFWMD) –The Upper and Middle Withlacoochee River minimum flows are currently in draft form and scheduled for finalization in 2014 –The Lower Withlacoochee River minimum flow is scheduled for 2014.

Determining the Availability of Surface Water for Water Supply through 2035 Withlacoochee River Withdrawal Location Potential Median Annual Withdrawal (mgd) Croom19.85 Wysong33.6 Holder35.6  These quantities were obtained from an analysis of the SWFWMD’s preliminary MFL work on the Withlacoochee River  The quantities are not cumulative  The quantities are highly seasonal - during the wet season, at least this much would be available while during the dry season, it is likely that none would be available.

Determining the Availability of Surface Water for Water Supply through 2035  Ocklawaha River (SJRWMD) –A minimum flow has been proposed for Ocklawaha River at SR- 40. –Water could be available at confluence of Ocklawaha and Silver River and at Rodman Reservoir. –The SJRWMD has no formal recommendation for a water supply project for the Ocklawaha River at this time. –Potential annual average yield is being re-evaluated.

Water Supply Plan Update Progress (July 15 – September 15) 1.Water Demand Estimates 2.Availability of Ground- and Surface Water 3.Conservation and Reclaimed Water Strategies 4.Water Supply Project Options 5.Water Supply Project Configurations 6.Facility Integration Plan 7.Governance

Conserve Florida Water Conservation Modeling Tool Online EZ Guide  SWFWMD requested the Authority use the University of Florida EZ Guide Model for the water supply plan to assess public supply water conservation potential for utilities through  Cardno, the Authority, and SWFWMD has asked the University of Florida staff that developed the modeling tool, to take the lead to continue the assessment of the public supply water conservation potential for utilities through  We provided the University of Florida EZ Guide staff with input on the conservation information we require for the water supply plan and how we would like it formatted.  The EZ Guide Staff has agreed to develop the conservation information according to our specifications and we are working closely with them to provide supporting information.

Reclaimed Water Availability Assessment through 2035  We have completed our estimate of the quantity of reclaimed water that will be available in 2035, that is not yet allocated to reuse projects in the Authority’s four- county region.  We are revising our estimates based on feedback from the utilities.

Reclaimed Water Availability Assessment Citrus County Example ( ) CITRUS COUNTY Unallocated WWTP Flow (2035) Utility Name Beverly Hills-Rolling Oaks 0.49 Citrus County - Brentwood Regional 0.81 Cirtus County - Citrus Springs (to be decommissioned, to Meadowcrest) - Inverness, City of 0.00 Crystal River, City of 0.00 Citrus County - Meadowcrest 0.00 Citrus County - Point O Woods 0.49 Citrus County - Sugarmill Woods 0.94 Walden Woods MHP 0.03 County Total 2.76

County Name Unallocated WWTP Flow (mgd in 2035) Citrus 2.76 Sumter 0.09 Marion 2.94 Hernando 0.96 Total 6.75 Projected Treated Wastewater Quantities not yet Allocated to Reclaimed Water Projects (2035) through 2035

Water Supply Plan Update Progress (July 15 – September 15) 1.Water Demand Estimates 2.Availability of Ground- and Surface Water 3.Conservation and Reclaimed Water Strategies 4.Water Supply Project Options 5.Water Supply Project Configurations 6.Facility Integration Plan 7.Governance

Water Supply Plan Update Water Supply Project Options and Configurations  The re-evaluation of a seawater desalination water supply option at the Crystal River Power Station has just been completed.  Continuing the re-evaluation of water supply facilities that could use the Withlacoochee River as a source.

Water Supply Plan Update Progress to Date (July 15 – September 15) 1.Water Demand Estimates 2.Availability of Ground- and Surface Water 3.Conservation and Reclaimed Water Strategies 4.Water Supply Project Options 5.Water Supply Project Configurations 6.Facility Integration Plan 7.Governance